Letting Schedule for Atlanta District (FY 2019)

Last Update: Monday, October 15, 2018
Atlanta District (FY 2019)
Bowie | Camp | Cass | Harrison | Marion | Morris | Panola | Titus | Upshur |

Bowie County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1231-01-071FM 989TentativeAug 2019$250,0008RAILROAD CROSSING UPGRADES0.0
0945-01-042SH 93TentativeJun 2019$400,00010CONSTRUCT SIDEWALKS0.0
0919-19-081CSTentativeAug 2019$250,0008RAILROAD CROSSING UPGRADES0.0
0945-01-043SH 93TentativeJun 2019$400,00010CONSTRUCT SIDEWALKS0.0
1020-01-055FM 559TentativeJun 2019$100,00010CONSTRUCT SIDEWALKS0.0
0010-11-072US 67ActualOct 2018$7,808,1571SEAL COAT0.0
0046-05-050US 82ApprovedNov 2018$470,8671RESURFACE EXISTING 2-LANE HIGHWAY0.0
0010-13-092US 67ApprovedDec 2018$624,4541RESURFACE EXISTING 3-LANE ROADWAY0.0
0218-01-096US 59ApprovedNov 2018$4,788,9101RESURFACE EXSTING 4-LANE ROADWAY0.0

Camp County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0083-07-043SH 11ApprovedDec 2018$1,143,4748INSTALL LED FLASHING CHEVRONS ON CURVE0.0
0083-08-053SH 11TentativeJun 2019$744,2148IMPROVE TRAFFIC SIGNALS, INSTALL PEDESTRIAN CROSSWALK0.0
0083-07-044SH 11ActualOct 2018$849,8138IMPROVE GUARDRAIL TO DESIGN STANDARDS5.0

Cass County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0919-14-027CRTentativeAug 2019$08RAILROAD CROSSING UPGRADES0.0
0062-03-042SH 8ActualSep 2018$1,844,4098PROFILE EDGELINE MARKINGS0.0
0919-00-079VATentativeJul 2019$1,731,00012019 DISTRICT SEAL COAT PAVEMENT MARKINGS0.0

Harrison County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1575-04-017SL 390TentativeApr 2019$346,5151INSTALL TRAFFIC SIGNAL0.0
0208-02-045SH 43TentativeMay 2019$7,425,0001REHABILITATION & WIDEN EXISTING 2-LANE ROADWAY0.0
0919-03-061CRTentativeAug 2019$250,0008RAILROAD CROSSING UPGRADES0.0
0495-08-117IH 20TentativeMay 2019$1,011,6316BRIDGE PREVENTATIVE MAINTENANCE0.0
0495-08-116IH 20TentativeMay 2019$1,700,0001REHABILITATE SOUTH FRONTAGE ROAD0.0
0632-04-032FM 451TentativeMar 2019$4,279,0008PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE0.0
0632-04-034FM 9ApprovedDec 2018$2,993,9051REHABILITATE EXISTING 2-LANE HIGHWAY0.0
0096-09-077US 80TentativeMar 2019$635,6828IMPROVE TRAFIC SIGNAL0.0

Marion County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0062-06-057US 59TentativeAug 2019$50,0003CONSTRUCT RIGHT TURN/DECELLERATION LANE0.0
0062-05-062US 59TentativeJun 2019$6,434,9371REHABILITATE EXISTING 4 LANE DIVIDED HIGHWAY0.0
0222-05-048SH 49TentativeJun 2019$108,6488SAFETY LIGHTING AT INTERSECTION0.0

Morris County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0010-08-055US 67ApprovedNov 2018$417,1878SAFETY LIGHTING0.0
0010-08-056US 67TentativeApr 2019$1,336,6128IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0

Panola County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0247-03-032US 79TentativeMar 2019$4,823,9048INSTALL CONTINUOUS TURN LANE, MILLED EDGELINE RUMBLE STRIPS0.0

Titus County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0010-06-042US 67TentativeMar 2019$4,704,3528SAFETY TREAT FIXED OBJECTS0.0

Upshur County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0392-02-096US 259ApprovedJan 2019$7,000,0001REHABILITATION OF EXISTING 4-LANE ROADWAY0.0
0520-05-050SH 155TentativeMar 2019$4,734,3821REHABILITATE EXISTING 2-LANE ROADWAY0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract