| Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
| County | HENDERSON |
| Highway | 0000000 |
| From | 2400 NE LOOP 317, ATHENS, HENDERSON CO |
| To | TEXAS 75752 |
| CSJ | 4704-01-343 |
| Proj ID | CBC - 470401343 |
| Work Type | RENOVATION OR REPAIR |
| |
| 0.001 | 596334.00 | | 538073.10 | 100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | 01-01-16 |
| Time Computed | 00-00-00 |
| Contract Working Days | 120 |
| Addl Days Granted | 0 |
| Working Days Charged | 199 |
| Percent Time Used | 165 |
| Contractor(s) |
| CENTURION INDUSTRIES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 4704-01-343 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 07144218 |
| Totals | 596334.00 | 0.00 | 538073.10 | 100.0 |
|
| County | SMITH |
| Highway | 0000000 |
| From | 2907 WEST FRONT, TYLER, TX 75702 |
| To | 2907 WEST FRONT, TYLER, TX 75702 |
| CSJ | 4704-01-428 |
| Proj ID | CBC - 470401428 |
| Work Type | RENOVATION OR REPAIR |
| |
| 0.001 | 898100.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 210 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| HCI GENERAL CONTRACTORS |
SUBCONTRACTOR(S) FOR CCSJ: 4704-01-428 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02164220 |
| Totals | 898100.00 | 0.00 | 0.00 | 0.0 |
|
| County | SMITH |
| Highway | 0000000 |
| From | 2709 W. FRONT STREET, TYLER, TX. 75702 |
| To | 2709 W. FRONT STREET, TYLER, TX. 75702 |
| CSJ | 4704-01-503 |
| Proj ID | CBC - 470401503 |
| Work Type | RENOVATION OR REPAIR |
| |
| 0.001 | 353750.00 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 120 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| VALCORP ENTERPRISES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 4704-01-503 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 06164212 |
| Totals | 353750.00 | 0.00 | 0.00 | 0.0 |
|
| County | SMITH |
| Highway | US0069 |
| From | VARIOUS ROADWAYS IN THE TYLER DISTRICT |
| To | TO INCLUDE SEALCOAT ROADS |
| CSJ | 6241-15-001 |
| Proj ID | RMC - 624115001 |
| Work Type | SL THERMO AND RAISED PAVEMENT MARKERS |
| |
| 0.010 | 413930.54 | | 379811.06 | 91.7 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 06-27-12 |
| Work Began | 08-20-12 |
| Work Completed | |
| Time Computed | 07-11-12 |
| Contract Working Days | 255 |
| Addl Days Granted | 0 |
| Working Days Charged | 223 |
| Percent Time Used | 87 |
| Contractor(s) |
| HIGHWAY TECHNOLOGIES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6241-15-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 05124003 |
| Totals | 413930.54 | 0.00 | 379811.06 | 91.7 |
|
| County | VAN ZANDT |
| Highway | SH0019 |
| From | VAN ZANDT COUNTY, ETC |
| To | DISTRICT WIDE |
| CSJ | 6255-21-001 |
| Proj ID | RMC - 625521001 |
| Work Type | RESURFACING |
| |
| 0.100 | 858848.60 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 85 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| APAC-TEXAS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6255-21-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 05134013 |
| Totals | 858848.60 | 0.00 | 0.00 | 0.0 |
|
| County | HENDERSON |
| Highway | SH0019 |
| From | VARIOUS LOCATIONS IN THE |
| To | TYLER DISTRICT |
| CSJ | 6279-02-001 |
| Proj ID | RMC - 627902001 |
| Work Type | CRACKSEAL - HOT POUR |
| |
| 756.230 | 385408.61 | | 0.00 | 0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 00-00-00 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 80 |
| Addl Days Granted | 0 |
| Working Days Charged | 0 |
| Percent Time Used | 0 |
| Contractor(s) |
| TEXAS ROAD MAINTENANCE |
SUBCONTRACTOR(S) FOR CCSJ: 6279-02-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 06154004 |
| Totals | 385408.61 | 0.00 | 0.00 | 0.0 |
|
| County | RUSK |
| Highway | SH0042 |
| From | VARIOUS ROADWAYS |
| To | IN RUSK COUNTY |
| CSJ | 6349-71-001 |
| Proj ID | RMC - 634971001 |
| Work Type | TREE REMOVAL |
| |
| 0.010 | 489250.00 | | 1425342.55 | 100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 05-11-20 |
| Work Completed | 10-29-24 |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 850 |
| Working Days Charged | 1,572 |
| Percent Time Used | 99 |
| Contractor(s) |
| DREWERY CONSTRUCTION COMPANY, INCORPORATED |
SUBCONTRACTOR(S) FOR CCSJ: 6349-71-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 02204008 |
| Totals | 489250.00 | 79629.40 | 1425342.55 | 100.0 |
|
| County | HENDERSON |
| Highway | SH0031 |
| From | VARIOUS LOCATIONS IS |
| To | HENDERSON & ANDERSON COUNTIES |
| CSJ | 6359-35-001 |
| Proj ID | RMC - 635935001 |
| Work Type | TRAFFIC CONTROL |
| |
| 0.010 | 880357.94 | | 2167687.03 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 09-01-20 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 850 |
| Working Days Charged | 1,520 |
| Percent Time Used | 96 |
| Contractor(s) |
| AREA WIDE PROTECTIVE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6359-35-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 05204223 |
| Totals | 880357.94 | 73935.91 | 2167687.03 | 99.9 |
|
| County | SMITH |
| Highway | US0069 |
| From | VARIOUS LOCATIONS IN |
| To | SMITH & CHEROKEE COUNTIES |
| CSJ | 6359-37-001 |
| Proj ID | RMC - 635937001 |
| Work Type | TRAFFIC CONTROL |
| |
| 0.010 | 832200.00 | | 2861840.10 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 09-01-20 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 850 |
| Working Days Charged | 1,516 |
| Percent Time Used | 95 |
| Contractor(s) |
| FIREMAN EXCAVATING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6359-37-001 L & M MOWING CONTRACTORS, LLC (268.16)
|
| Contract # | 05204023 |
| Totals | 832200.00 | 83407.83 | 2861840.10 | 99.9 |
|
| County | GREGG |
| Highway | SH0031 |
| From | VARIOUS LOCATIONS IN |
| To | GREGG & RUSK COUNTIES |
| CSJ | 6359-38-001 |
| Proj ID | RMC - 635938001 |
| Work Type | TRAFFIC CONTROL |
| |
| 0.010 | 1028550.43 | | 2790763.44 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 09-28-20 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 820 |
| Working Days Charged | 1,493 |
| Percent Time Used | 96 |
| Contractor(s) |
| AREA WIDE PROTECTIVE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6359-38-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 05204222 |
| Totals | 1028550.43 | 62297.76 | 2790763.44 | 99.9 |
|
| County | HENDERSON |
| Highway | US0175 |
| From | VARIOUS ROADWAYS IN |
| To | HENDERSON COUNTY |
| CSJ | 6372-91-001 |
| Proj ID | RMC - 637291001 |
| Work Type | ROW MOWING |
| |
| 0.010 | 700709.08 | | 1497997.94 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 01-06-21 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 114 |
| Addl Days Granted | 119 |
| Working Days Charged | 224 |
| Percent Time Used | 96 |
| Contractor(s) |
| CROSS PLUS CONSTRUCTION, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6372-91-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 12204021 |
| Totals | 700709.08 | 170090.25 | 1497997.94 | 99.9 |
|
| County | VAN ZANDT |
| Highway | SH0019 |
| From | VARIOUS ROADWAYS IN |
| To | VAN ZANDT COUNTY |
| CSJ | 6372-92-001 |
| Proj ID | RMC - 637292001 |
| Work Type | ROW MOWING |
| |
| 0.010 | 517662.52 | | 1115569.81 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 06-01-21 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 98 |
| Addl Days Granted | 98 |
| Working Days Charged | 187 |
| Percent Time Used | 95 |
| Contractor(s) |
| SERNA CONTRACTORS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6372-92-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 12204022 |
| Totals | 517662.52 | 121878.94 | 1115569.81 | 99.9 |
|
| County | HENDERSON |
| Highway | SH0031 |
| From | VARIOUS ROADWAYS IN HENDERSON CO. |
| To | ATHENS MAINTENANCE SECTION |
| CSJ | 6382-94-001 |
| Proj ID | RMC - 638294001 |
| Work Type | TREE REMOVAL |
| |
| 0.010 | 485500.00 | | 460668.00 | 94.8 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 01-01-22 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 1,029 |
| Percent Time Used | 70 |
| Contractor(s) |
| PATTERSON'S COMPLETE TREE SERVICE LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6382-94-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 08214015 |
| Totals | 485500.00 | 18654.00 | 460668.00 | 94.8 |
|
| County | CHEROKEE |
| Highway | US0069 |
| From | VARIOUS ROADWAYS |
| To | IN CHEROKEE COUNTY |
| CSJ | 6392-51-001 |
| Proj ID | RMC - 639251001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 454736.86 | | 660005.66 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 06-01-22 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 102 |
| Addl Days Granted | 102 |
| Working Days Charged | 141 |
| Percent Time Used | 69 |
| Contractor(s) |
| S G COMPANY, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6392-51-001 REAGAN"S ENVIRONMENTAL SERVICES & LAWN CARE (10.27)
|
| Contract # | 12214019 |
| Totals | 454736.86 | 64153.78 | 660005.66 | 99.9 |
|
| County | ANDERSON |
| Highway | US0079 |
| From | VARIOUS ROADWAYS |
| To | IN ANDERSON COUNTY |
| CSJ | 6392-52-001 |
| Proj ID | RMC - 639252001 |
| Work Type | MOWING HIGHWAY RIGHT OF WAY |
| |
| 0.010 | 604286.56 | | 794380.02 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 06-01-22 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 98 |
| Addl Days Granted | 98 |
| Working Days Charged | 157 |
| Percent Time Used | 80 |
| Contractor(s) |
| S G COMPANY, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6392-52-001 REAGAN"S ENVIRONMENTAL SERVICES & LAWN CARE (4.77)
|
| Contract # | 12214018 |
| Totals | 604286.56 | 68579.75 | 794380.02 | 99.9 |
|
| County | ANDERSON |
| Highway | SH0019 |
| From | VARIOUS ROADWAYS |
| To | IN ANDERSON COUNTY |
| CSJ | 6396-67-001 |
| Proj ID | RMC - 639667001 |
| Work Type | TREE REMOVAL |
| |
| 0.010 | 352983.43 | | 497687.20 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 05-16-22 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 617 |
| Percent Time Used | 84 |
| Contractor(s) |
| ROAD SOLUTIONS L.L.C. |
SUBCONTRACTOR(S) FOR CCSJ: 6396-67-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 03224220 |
| Totals | 352983.43 | 48297.00 | 497687.20 | 99.9 |
|
| County | WOOD |
| Highway | US0080 |
| From | VARIOUS LOCATIONS IN |
| To | THE TYLER DISTRICT |
| CSJ | 6399-79-001 |
| Proj ID | BPM - 639979001 |
| Work Type | CONCRETE SPALL REPAIR |
| |
| 0.010 | 320000.00 | | 1372862.94 | 99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 11-01-22 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 705 |
| Percent Time Used | 96 |
| Contractor(s) |
| RED BARON BUILDING COMPANY, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6399-79-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 09224031 |
| Totals | 320000.00 | 8080.00 | 1372862.94 | 99.9 |
|
| County | GREGG |
| Highway | US0080 |
| From | VARIOUS LOCATIONS IN GREGG COUNTY |
| To | AND RUSK COUNTY |
| CSJ | 6400-24-001 |
| Proj ID | RMC - 640024001 |
| Work Type | METAL BEAM GUARD FENCE REPAIR |
| |
| 0.010 | 695329.00 | | 615369.00 | 88.5 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 11-08-22 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 717 |
| Percent Time Used | 98 |
| Contractor(s) |
| T&L CLEANING SERVICES LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6400-24-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 06224013 |
| Totals | 695329.00 | 12465.00 | 615369.00 | 88.5 |
|
| County | WOOD |
| Highway | US0080 |
| From | VARIOUS LOCATIONS IN WOOD COUNTY |
| To | AND VAN ZANDT COUNTY |
| CSJ | 6400-26-001 |
| Proj ID | RMC - 640026001 |
| Work Type | METAL BEAM GUARD FENCE REPAIR |
| |
| 0.010 | 449833.00 | | 319569.75 | 71.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 10-16-22 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 730 |
| Working Days Charged | 745 |
| Percent Time Used | 51 |
| Contractor(s) |
| CATOCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6400-26-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 06224014 |
| Totals | 449833.00 | 64297.00 | 319569.75 | 71.0 |
|
| County | SMITH |
| Highway | US0069 |
| From | VARIOUS LOCATION IN SMITH COUNTY |
| To | AND CHEROKEE COUNTY |
| CSJ | 6400-47-001 |
| Proj ID | RMC - 640047001 |
| Work Type | METAL BEAM GUARD FENCE REPAIR |
| |
| 0.010 | 517456.00 | | 321570.45 | 62.1 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order | 00-00-00 |
| Work Began | 11-01-22 |
| Work Completed | |
| Time Computed | 00-00-00 |
| Contract Working Days | 730 |
| Addl Days Granted | 0 |
| Working Days Charged | 711 |
| Percent Time Used | 97 |
| Contractor(s) |
| CATOCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6400-47-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # | 06224015 |
| Totals | 517456.00 | 9720.00 | 321570.45 | 62.1 |
|