Detail Letting Schedule for Bexar County (FY 2003)
Detail Letting Schedule for Bexar County (FY 2003) | ||||
Last Update: Thursday, August 28, 2003 |
Bexar County (FY 2003) |
CCSJ: 0016-07-116 | |||
District: | San Antonio | Let Date: | MAY 2003 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(76) | CSJ: | 0016-07-116 |
Description: | SEAL COAT AND OVERLAY FRONTAGE ROADS | Handling Code: |
|
Limits From: | 0.164 MI SOUTH OF WHIRLWIND DR | Fund Cat: | 1 |
Limits To: | 0.189 MI NORTH OF TOPPERWEIN RD | Estimate: | $1,235,431 |
Length: | 3.6 Miles | Actual: | $1,161,273 |
District: | San Antonio | Let Date: | MAY 2003 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-2(76) | CSJ: | 0017-10-222 |
Description: | SEAL COAT AND OVERLAY FRONTAGE ROADS | Handling Code: |
|
Limits From: | 0.068 MI SOUTH OF WALZEM ROAD | Fund Cat: | 1 |
Limits To: | 0.164 MI SOUTH OF WHIRLWIND DRIVE | Estimate: | $565,093 |
Length: | 1.2 Miles | Actual: | $562,952 |
Back... |
Totals for 0016-07-116 | ||
---|---|---|---|
Length: | 4.8 Miles | ||
Estimate: | $1,800,524 | ||
Actual: | $1,724,225 | ||
CCSJ: 0017-01-022 | |||
District: | San Antonio | Let Date: | JAN 2003 |
Highway: | LP 353 | Let Status: | Actual |
Project ID: | CPM 17-1-22 | CSJ: | 0017-01-022 |
Description: | PLANING, SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | INDIAN CREEK | Fund Cat: | 1 |
Limits To: | 250 FT SOUTH OF LP 13 | Estimate: | $598,739 |
Length: | 3.1 Miles | Actual: | $487,656 |
District: | San Antonio | Let Date: | JAN 2003 |
Highway: | FM 2790 | Let Status: | Actual |
Project ID: | CPM 1741-2-27 | CSJ: | 1741-02-027 |
Description: | SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | LP 1604 | Fund Cat: | 1 |
Limits To: | MEDINA RIVER | Estimate: | $528,285 |
Length: | 4.2 Miles | Actual: | $416,501 |
District: | San Antonio | Let Date: | JAN 2003 |
Highway: | FM 1957 | Let Status: | Actual |
Project ID: | CPM 2104-2-26 | CSJ: | 2104-02-026 |
Description: | SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | BEXAR/MEDINA COUNTY LINE | Fund Cat: | 1 |
Limits To: | 600 FT WEST OF LP 1604 | Estimate: | $931,090 |
Length: | 6.0 Miles | Actual: | $734,100 |
Back... |
Totals for 0017-01-022 | ||
Length: | 13.3 Miles | ||
Estimate: | $2,058,114 | ||
Actual: | $1,638,257 | ||
CCSJ: 0024-07-044 | |||
District: | San Antonio | Let Date: | DEC 2002 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | CPM 24-7-44 | CSJ: | 0024-07-044 |
Description: | SEAL COAT, ACP OVERLAY & PAV MARKINGS | Handling Code: |
|
Limits From: | LP 1604 | Fund Cat: | 1 |
Limits To: | 0.8 MI W OF IH 10 | Estimate: | $1,084,890 |
Length: | 2.5 Miles | Actual: | $1,019,563 |
District: | San Antonio | Let Date: | DEC 2002 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | CPM 24-7-45 | CSJ: | 0024-07-045 |
Description: | SEAL COAT, ACP OVERLAY & PAV MARKINGS | Handling Code: |
|
Limits From: | LP 1604 | Fund Cat: | 1 |
Limits To: | SH 211 | Estimate: | $1,395,690 |
Length: | 3.9 Miles | Actual: | $1,196,349 |
District: | San Antonio | Let Date: | DEC 2002 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | CPM 24-7-46 | CSJ: | 0024-07-046 |
Description: | SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | BEXAR/MEDINA COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 211 | Estimate: | $891,731 |
Length: | 2.5 Miles | Actual: | $747,307 |
District: | San Antonio | Let Date: | DEC 2002 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | CPM 24-8-118 | CSJ: | 0024-08-118 |
Description: | SEAL COAT, ACP OVERLAY & PAV MARKINGS | Handling Code: |
|
Limits From: | 0.8 MI W OF IH 410 | Fund Cat: | 1 |
Limits To: | IH 410 | Estimate: | $448,632 |
Length: | 0.8 Miles | Actual: | $455,505 |
Back... |
Totals for 0024-07-044 | ||
Length: | 9.7 Miles | ||
Estimate: | $3,820,943 | ||
Actual: | $3,418,724 | ||
CCSJ: 0024-07-047 | |||
District: | San Antonio | Let Date: | OCT 2002 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | CPM 24-7-47 | CSJ: | 0024-07-047 |
Description: | REWORK BASE, SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 90 EB EXIT RAMP (BEG) | Fund Cat: | 1 |
Limits To: | US 90 EB EXIT RAMP (END) | Estimate: | $43,482 |
Length: | 0.2 Miles | Actual: | $34,125 |
District: | San Antonio | Let Date: | OCT 2002 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | CPM 24-8-115 | CSJ: | 0024-08-115 |
Description: | PLANNING, SEAL COAT, ACP OVERLAY & AVEMENT MARKINGS | Handling Code: |
|
Limits From: | SB IH 410 ENTRANCE RAMP | Fund Cat: | 1 |
Limits To: | US 90 NE FRONTAGE ROAD | Estimate: | $140,290 |
Length: | 0.6 Miles | Actual: | $121,203 |
Back... |
Totals for 0024-07-047 | ||
Length: | 0.8 Miles | ||
Estimate: | $183,772 | ||
Actual: | $155,328 | ||
CCSJ: 0024-08-110 | |||
District: | San Antonio | Let Date: | MAY 2003 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | HP 91(1) | CSJ: | 0024-08-110 |
Description: | RECONSTRUCT INTERSECTION | Handling Code: |
|
Limits From: | AT 36TH STREET | Fund Cat: | 1 |
Limits To: | . | Estimate: | $12,281,257 |
Length: | 1.4 Miles | Actual: | $12,213,066 |
Back... |
Totals for 0024-08-110 | ||
Length: | 1.4 Miles | ||
Estimate: | $12,281,257 | ||
Actual: | $12,213,066 | ||
CCSJ: 0072-07-052 | |||
District: | San Antonio | Let Date: | NOV 2002 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2003(202)MM | CSJ: | 0072-07-052 |
Description: | ACQUISITION, RELOCATION AND UTILITIES | Handling Code: |
XX |
Limits From: | IH 10 AT DOMINION | Fund Cat: | ROW |
Limits To: | . | Estimate: | |
Length: | 0.0 Miles | Actual: | $2,200,000 |
Back... |
Totals for 0072-07-052 | ||
Length: | 0.0 Miles | ||
Estimate: | |||
Actual: | $2,200,000 | ||
CCSJ: 0072-12-130 | |||
District: | San Antonio | Let Date: | JUN 2003 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2002(406) | CSJ: | 0072-12-130 |
Description: | UPGRADE TO 10 LANE FREEWAY & TRAFFIC MANAGEMENT SYSTEM | Handling Code: |
|
Limits From: | 0.2 MI S OF N CROSSROADS BLVD | Fund Cat: | 1 |
Limits To: | FULTON AVE IN SAN ANTONIO | Estimate: | $59,939,947 |
Length: | 3.1 Miles | Actual: | $60,593,429 |
District: | San Antonio | Let Date: | JUN 2003 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2003(420) | CSJ: | 0072-12-177 |
Description: | UTILITIES | Handling Code: |
|
Limits From: | 0.2 MILES SOUTH OF N CROSSROADS BLVD | Fund Cat: | ROW |
Limits To: | FULTON AVE IN SAN ANTONIO | Estimate: | $1,416,302 |
Length: | 0.0 Miles | Actual: | $1,396,721 |
Bid Tabulations Back... |
Totals for 0072-12-130 | ||
Length: | 3.1 Miles | ||
Estimate: | $61,356,249 | ||
Actual: | $61,990,150 | ||
CCSJ: 0073-08-134 | |||
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | IM 37-2(74) | CSJ: | 0073-05-061 |
Description: | REFURBISHING SIGNS | Handling Code: |
|
Limits From: | 1.56 MI SOUTH OF SPUR 199 | Fund Cat: | 1 |
Limits To: | BORREGO CREEK | Estimate: | $137,007 |
Length: | 11.5 Miles | Actual: | $124,719 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | IM 37-2(74) | CSJ: | 0073-06-042 |
Description: | REFURBISHING SIGNS | Handling Code: |
|
Limits From: | BORREGO CREEK | Fund Cat: | 1 |
Limits To: | LIVE OAK COUNTY LINE | Estimate: | $66,175 |
Length: | 7.6 Miles | Actual: | $57,825 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | IM 37-2(74) | CSJ: | 0073-08-134 |
Description: | REFURBISH SIGNS | Handling Code: |
|
Limits From: | FAIR AVE, S | Fund Cat: | 1 |
Limits To: | SPRR | Estimate: | $433,788 |
Length: | 8.3 Miles | Actual: | $446,534 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | IM 37-2(74) | CSJ: | 0073-09-024 |
Description: | REFURBISH SIGNS | Handling Code: |
|
Limits From: | SP RR | Fund Cat: | 1 |
Limits To: | BEXAR COUNTY LINE | Estimate: | $241,544 |
Length: | 12.0 Miles | Actual: | $223,795 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | IM 37-2(74) | CSJ: | 0073-10-039 |
Description: | REFURBISHING SIGNS | Handling Code: |
|
Limits From: | BEXAR COUNTY LINE | Fund Cat: | 1 |
Limits To: | 1.56 MI SOUTH OF SPUR 199 | Estimate: | $204,011 |
Length: | 15.8 Miles | Actual: | $183,448 |
Back... |
Totals for 0073-08-134 | ||
Length: | 55.2 Miles | ||
Estimate: | $1,082,525 | ||
Actual: | $1,036,321 | ||
CCSJ: 0073-08-145 | |||
District: | San Antonio | Let Date: | JUN 2003 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | ER 2003(436) | CSJ: | 0072-08-113 |
Description: | REPLACE FLOOD DAMAGED TMS EQUIPMENT IN VARIOUS LOCATIONS | Handling Code: |
NC |
Limits From: | 0.258 MI S OF LA CANTERA PKWY | Fund Cat: | 10 |
Limits To: | 0.354 MI N OF C.L. OF LOOP 1604 | Estimate: | $145,064 |
Length: | 0.4 Miles | Actual: | $149,400 |
District: | San Antonio | Let Date: | JUN 2003 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | ER 2003(436) | CSJ: | 0073-08-145 |
Description: | REPLACE FLOOD DAMAGED TMS EQUIPMENT IN VARIOUS LOCATIONS. | Handling Code: |
NC |
Limits From: | 0.063 MI N OF C.L. OF DICK FREDERICK_DR | Fund Cat: | 10 |
Limits To: | 0.194 MI S OF C.L. OF BASSE RD | Estimate: | $257,874 |
Length: | 0.5 Miles | Actual: | $231,600 |
Bid Tabulations Back... |
Totals for 0073-08-145 | ||
Length: | 0.9 Miles | ||
Estimate: | $402,938 | ||
Actual: | $381,000 | ||
CCSJ: 0143-01-053 | |||
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | CPM 143-1-53 | CSJ: | 0143-01-053 |
Description: | BASE REPAIR, SURFACE TREATMENT, OVERLAY, PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 1516 | Fund Cat: | 1 |
Limits To: | FM 1628 | Estimate: | $2,641,037 |
Length: | 3.8 Miles | Actual: | $1,795,538 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | CPM 143-2-22 | CSJ: | 0143-02-022 |
Description: | BASE REPAIR & ACP OVERLAY | Handling Code: |
|
Limits From: | FM 1628 | Fund Cat: | 1 |
Limits To: | LOOP 1604 | Estimate: | $1,155,247 |
Length: | 2.9 Miles | Actual: | $942,754 |
Back... |
Totals for 0143-01-053 | ||
Length: | 6.7 Miles | ||
Estimate: | $3,796,284 | ||
Actual: | $2,738,292 | ||
CCSJ: 0253-04-124 | |||
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | US 181 | Let Status: | Actual |
Project ID: | C 100-3-66 | CSJ: | 0100-03-066 |
Description: | UPGRADE EXISTING TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | US 181 | Fund Cat: | 1 |
Limits To: | SH 97 | Estimate: | $121,300 |
Length: | 0.0 Miles | Actual: | $95,297 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | SH 46 | Let Status: | Actual |
Project ID: | CC 215-1-34 | CSJ: | 0215-01-034 |
Description: | TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | AT FM 3159 | Fund Cat: | 10 |
Limits To: | . | Estimate: | $100,000 |
Length: | 0.0 Miles | Actual: | $95,140 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | NH 2002(900) | CSJ: | 0253-04-124 |
Description: | SIGNALIZING INTERSECTIONS & TRAFFIC OPERATIONS | Handling Code: |
|
Limits From: | AT BORGFELD, BULVERDE & STONE OAK ROADS | Fund Cat: | 11 |
Limits To: | . | Estimate: | $444,572 |
Length: | 4.6 Miles | Actual: | $344,477 |
Back... |
Totals for 0253-04-124 | ||
Length: | 4.6 Miles | ||
Estimate: | $665,872 | ||
Actual: | $534,914 | ||
CCSJ: 0291-09-125 | |||
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 2002(805)HES | CSJ: | 0291-09-125 |
Description: | INSTALLING MEDIAN BARRIER | Handling Code: |
|
Limits From: | 0.1 MI N OF CHIMNEY CREEK ROAD | Fund Cat: | 8 |
Limits To: | 0.15 MI S OF CHIMNEY CREEK ROAD | Estimate: | $58,279 |
Length: | 0.3 Miles | Actual: | $47,173 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | STP 2002(805)HES | CSJ: | 2452-02-069 |
Description: | INSTALLING A MEDIAN BARRIER | Handling Code: |
|
Limits From: | 0.44 MI N OF KYLE SEALE PKWY | Fund Cat: | 8 |
Limits To: | BABCOCK RD | Estimate: | $129,914 |
Length: | 0.6 Miles | Actual: | $118,349 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | STP 2002(805)HES | CSJ: | 2452-03-092 |
Description: | INSTALLING MEDIAN BARRIER | Handling Code: |
|
Limits From: | GREEN MOUNTAIN RD | Fund Cat: | 8 |
Limits To: | UNION PACIFIC RR OVERPASS | Estimate: | $114,807 |
Length: | 0.6 Miles | Actual: | $103,944 |
Back... |
Totals for 0291-09-125 | ||
Length: | 1.5 Miles | ||
Estimate: | $303,000 | ||
Actual: | $269,466 | ||
CCSJ: 0521-01-040 | |||
District: | San Antonio | Let Date: | OCT 2002 |
Highway: | LP 13 | Let Status: | Actual |
Project ID: | STP 2001(768)MM | CSJ: | 0521-01-040 |
Description: | WIDEN EXISTING TO PROVIDE CONTINUOUS LEFT TURN LANE AND | Handling Code: |
|
Limits From: | SEALE RD | Fund Cat: | 7 |
Limits To: | 0.172 MI SOUTH OF IH 10 | Estimate: | $5,852,173 |
Length: | 1.1 Miles | Actual: | $4,618,054 |
Back... |
Totals for 0521-01-040 | ||
Length: | 1.1 Miles | ||
Estimate: | $5,852,173 | ||
Actual: | $4,618,054 | ||
CCSJ: 0521-04-243 | |||
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | IM 410-4(331) | CSJ: | 0521-04-243 |
Description: | REFURBISH SIGNS | Handling Code: |
|
Limits From: | US 90 | Fund Cat: | 1 |
Limits To: | CULEBRA ROAD (FM 3487) | Estimate: | $143,121 |
Length: | 4.1 Miles | Actual: | $111,969 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | IM 410-4(331) | CSJ: | 0521-05-116 |
Description: | REFURBISH SIGNS | Handling Code: |
|
Limits From: | VALLEY HI DR, N | Fund Cat: | 1 |
Limits To: | US 90 | Estimate: | $70,085 |
Length: | 1.6 Miles | Actual: | $62,572 |
Back... |
Totals for 0521-04-243 | ||
Length: | 5.7 Miles | ||
Estimate: | $213,206 | ||
Actual: | $174,541 | ||
CCSJ: 0521-04-251 | |||
District: | San Antonio | Let Date: | JAN 2003 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | IM 410-4(332) | CSJ: | 0521-04-251 |
Description: | WIDEN EXIST TO PROVIDE A RIGHT TURN LANE | Handling Code: |
|
Limits From: | ON WESTBOUND FRONTAGE RD AT INGRAM ROAD | Fund Cat: | 1 |
Limits To: | . | Estimate: | $154,704 |
Length: | 0.1 Miles | Actual: | $120,745 |
Back... |
Totals for 0521-04-251 | ||
Length: | 0.1 Miles | ||
Estimate: | $154,704 | ||
Actual: | $120,745 | ||
CCSJ: 0521-04-253 | |||
District: | San Antonio | Let Date: | JAN 2003 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | CPM 73-8-140 | CSJ: | 0073-08-140 |
Description: | ULTRATHIN BONDED WEARING COURSE AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | RHAPSODY DR | Fund Cat: | 1 |
Limits To: | JONES-MALTSBERGER | Estimate: | $536,338 |
Length: | 1.3 Miles | Actual: | $392,088 |
District: | San Antonio | Let Date: | JAN 2003 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | CPM 253-4-119 | CSJ: | 0253-04-119 |
Description: | ULTRATHIN BONDED WEARING COURSE AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | NAKOMA | Fund Cat: | 1 |
Limits To: | RHAPSODY DR | Estimate: | $194,785 |
Length: | 0.4 Miles | Actual: | $139,414 |
District: | San Antonio | Let Date: | JAN 2003 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | IM 410-4(333) | CSJ: | 0521-04-253 |
Description: | ULTRATHIN BONDED WEARING COURSE AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | N'BND & S'BND FRONTAGE RD: US 90 | Fund Cat: | 1 |
Limits To: | 1500FT NORTH OF CULEBRA RD | Estimate: | $1,268,316 |
Length: | 4.3 Miles | Actual: | $926,189 |
District: | San Antonio | Let Date: | JAN 2003 |
Highway: | MH | Let Status: | Actual |
Project ID: | CPM 915-12-400 | CSJ: | 0915-12-400 |
Description: | ULTRATHIN BONDED WEARING CRSE & PAV MARKINGS | Handling Code: |
|
Limits From: | ON WURZBACH PKWAY FROM 910' W OF FM 1535 | Fund Cat: | 1 |
Limits To: | FM 1535 | Estimate: | $43,825 |
Length: | 0.2 Miles | Actual: | $30,215 |
District: | San Antonio | Let Date: | JAN 2003 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | CPM 2452-2-68 | CSJ: | 2452-02-068 |
Description: | ULTRATHIN BONDED WEARING COURSE AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | E'BND & W'BND FRONTAGE RD: IH 10 | Fund Cat: | 1 |
Limits To: | US 281 | Estimate: | $1,625,146 |
Length: | 7.9 Miles | Actual: | $1,201,466 |
Back... |
Totals for 0521-04-253 | ||
Length: | 14.1 Miles | ||
Estimate: | $3,668,410 | ||
Actual: | $2,689,372 | ||
CCSJ: 0849-01-039 | |||
District: | San Antonio | Let Date: | AUG 2003 |
Highway: | FM 471 | Let Status: | Actual |
Project ID: | STP 2003(611)MM | CSJ: | 0849-01-039 |
Description: | CONSTRUCT SIDEWALKS ON NORTH SIDE OF ROADWAY | Handling Code: |
|
Limits From: | LP 1604 | Fund Cat: | 7 |
Limits To: | SH 16 (BANDERA ROAD) | Estimate: | $767,100 |
Length: | 5.9 Miles | Actual: | $724,632 |
Bid Tabulations Award Status Back... |
Totals for 0849-01-039 | ||
Length: | 5.9 Miles | ||
Estimate: | $767,100 | ||
Actual: | $724,632 | ||
CCSJ: 0849-01-040 | |||
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | FM 471 | Let Status: | Actual |
Project ID: | CPM 849-1-40 | CSJ: | 0849-01-040 |
Description: | MICRO - SURFACING & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | LP 1604 | Fund Cat: | 1 |
Limits To: | SH 16 | Estimate: | $649,552 |
Length: | 6.0 Miles | Actual: | $791,087 |
Back... |
Totals for 0849-01-040 | ||
Length: | 6.0 Miles | ||
Estimate: | $649,552 | ||
Actual: | $791,087 | ||
CCSJ: 0915-00-082 | |||
District: | San Antonio | Let Date: | OCT 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2003(76) | CSJ: | 0915-00-082 |
Description: | THERMOPLASTIC RE - STRIPING (FY 2002) - CAT 10A | Handling Code: |
|
Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $199,525 |
Length: | 40.1 Miles | Actual: | $155,273 |
Back... |
Totals for 0915-00-082 | ||
Length: | 40.1 Miles | ||
Estimate: | $199,525 | ||
Actual: | $155,273 | ||
CCSJ: 0915-00-098 | |||
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | SH 27 | Let Status: | Actual |
Project ID: | MG 2002(902) | CSJ: | 0142-04-042 |
Description: | INSTALLING VIDEO IMAGING VEHICLE DETECTION SYSTEM (VARIOUS | Handling Code: |
|
Limits From: | 0.06 MI E OF FM 1338 (PLAZA DR) | Fund Cat: | 1 |
Limits To: | FM 394 (LEMOS ST) | Estimate: | $60,920 |
Length: | 1.1 Miles | Actual: | $45,150 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | SH 27 | Let Status: | Actual |
Project ID: | MG 2002(902) | CSJ: | 0142-05-065 |
Description: | INSTALLING VIDEO IMAGING VEHICLE DETECTION SYSTEM (VARIOUS | Handling Code: |
|
Limits From: | 0.19 MI E OF SH 16 (WASHINGTON ST) | Fund Cat: | 1 |
Limits To: | 0.37 MI E OF SH 16 (TIVY ST) | Estimate: | $70,390 |
Length: | 1.3 Miles | Actual: | $51,740 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | MG 2002(902) | CSJ: | 0291-02-029 |
Description: | INSTALLING VIDEO IMAGING VEHICLE DETECTION SYSTEM | Handling Code: |
|
Limits From: | AT THE INTERSECTION OF HILL COUNTY DR | Fund Cat: | 1 |
Limits To: | AND SH 16 | Estimate: | $18,640 |
Length: | 0.0 Miles | Actual: | $12,960 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | MG 2002(902) | CSJ: | 0915-00-098 |
Description: | DISTRICTWIDE TRAFFIC SIGNALS (2001) | Handling Code: |
|
Limits From: | DISTRICTWIDE NON-SITE SPECIFIC (2001) | Fund Cat: | 1 |
Limits To: | . | Estimate: | $748,425 |
Length: | 0.0 Miles | Actual: | $649,635 |
Back... |
Totals for 0915-00-098 | ||
Length: | 2.4 Miles | ||
Estimate: | $898,375 | ||
Actual: | $759,485 | ||
CCSJ: 0915-12-172 | |||
District: | San Antonio | Let Date: | DEC 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2003(344)MM | CSJ: | 0915-12-172 |
Description: | RECONSTRUCT EXISTING STREET | Handling Code: |
|
Limits From: | IN SAN ANTONIO ON HOUSTON ST FROM BOWIE | Fund Cat: | 7 |
Limits To: | PINE | Estimate: | $3,074,039 |
Length: | 0.8 Miles | Actual: | $2,872,060 |
Back... |
Totals for 0915-12-172 | ||
Length: | 0.8 Miles | ||
Estimate: | $3,074,039 | ||
Actual: | $2,872,060 | ||
CCSJ: 0915-12-231 | |||
District: | San Antonio | Let Date: | JUN 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 98(272)MM | CSJ: | 0915-12-231 |
Description: | WIDEN NARROW PAVEMENT FOR TURN LANES (SIGNALS) | Handling Code: |
|
Limits From: | IN SAN ANTONIO ON BITTERS FROM WEST AVE | Fund Cat: | 7 |
Limits To: | E OF HEIMER RD (VIC US281) | Estimate: | $1,924,896 |
Length: | 0.6 Miles | Actual: | $2,017,658 |
Bid Tabulations Back... |
Totals for 0915-12-231 | ||
Length: | 0.6 Miles | ||
Estimate: | $1,924,896 | ||
Actual: | $2,017,658 | ||
CCSJ: 0915-12-257 | |||
District: | San Antonio | Let Date: | JUL 2003 |
Highway: | SP 536 | Let Status: | Actual |
Project ID: | NH 2003(552) | CSJ: | 0253-06-030 |
Description: | ENHANCE ROADWAYS, TRAILS, MARKERS THAT LEAD TO THE MISSIONS | Handling Code: |
|
Limits From: | MISSION TRAILS ('ESPADA' TO THE 'ALAMO') | Fund Cat: | 11 |
Limits To: | PHASE 2A - WOODHULL ST TO SAN JOSE ST | Estimate: | $993,633 |
Length: | 0.4 Miles | Actual: | $987,268 |
District: | San Antonio | Let Date: | JUL 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 94(329)TE | CSJ: | 0915-12-257 |
Description: | ENHANCE ROADWAYS, TRAILS, MARKERS THAT LEAD TO THE MISSIONS | Handling Code: |
|
Limits From: | LOOP 13 | Fund Cat: | 9 |
Limits To: | E. SOUTHCROSS | Estimate: | $9,204,124 |
Length: | 0.0 Miles | Actual: | $8,962,770 |
Bid Tabulations Back... |
Totals for 0915-12-257 | ||
Length: | 0.4 Miles | ||
Estimate: | $10,197,757 | ||
Actual: | $9,950,038 | ||
CCSJ: 0915-12-281 | |||
District: | San Antonio | Let Date: | JUL 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(904)MM | CSJ: | 0915-12-281 |
Description: | RECONSTRUCT & EXPAND 2 TO 4 LANE (CURBS, SIDEWALK, SIGNAL) | Handling Code: |
|
Limits From: | ON SOUTHCROSS BLVD FROM S PRESA ST | Fund Cat: | 7 |
Limits To: | S NEW BRAUNFELS AVE | Estimate: | $3,865,822 |
Length: | 0.8 Miles | Actual: | $3,983,045 |
Bid Tabulations Back... |
Totals for 0915-12-281 | ||
Length: | 0.8 Miles | ||
Estimate: | $3,865,822 | ||
Actual: | $3,983,045 | ||
CCSJ: 0915-12-328 | |||
District: | San Antonio | Let Date: | DEC 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(147)MM | CSJ: | 0915-12-328 |
Description: | REHAB & WIDEN NARROW PAVEMENT W / CLTL (SIDEWALKS, DRAINAGE, | Handling Code: |
|
Limits From: | ON ISOM FROM RAMSEY | Fund Cat: | 7 |
Limits To: | US 281 | Estimate: | $2,049,874 |
Length: | 0.4 Miles | Actual: | $2,056,203 |
Back... |
Totals for 0915-12-328 | ||
Length: | 0.4 Miles | ||
Estimate: | $2,049,874 | ||
Actual: | $2,056,203 | ||
CCSJ: 1437-01-028 | |||
District: | San Antonio | Let Date: | MAY 2003 |
Highway: | FM 1346 | Let Status: | Actual |
Project ID: | STP 2003(460) | CSJ: | 1437-01-028 |
Description: | REHAB & WIDEN NARROW PAVEMENT & SHOULDER | Handling Code: |
|
Limits From: | FM 1516 | Fund Cat: | 1 |
Limits To: | LP 1604 | Estimate: | $5,030,963 |
Length: | 4.7 Miles | Actual: | $3,575,072 |
Back... |
Totals for 1437-01-028 | ||
Length: | 4.7 Miles | ||
Estimate: | $5,030,963 | ||
Actual: | $3,575,072 | ||
CCSJ: 2452-03-091 | |||
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | SH 46 | Let Status: | Actual |
Project ID: | CPM 215-1-32 | CSJ: | 0215-01-032 |
Description: | OVERLAYING ACP | Handling Code: |
|
Limits From: | 0.401 MI EAST OF FM 3159 | Fund Cat: | 1 |
Limits To: | US 281 | Estimate: | $609,359 |
Length: | 4.7 Miles | Actual: | $544,346 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | FM 1863 | Let Status: | Actual |
Project ID: | CPM 470-1-23 | CSJ: | 0470-01-023 |
Description: | ACP OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | BEXAR COUNTY LINE | Fund Cat: | 1 |
Limits To: | 2.7 MI WEST OF SH 46 | Estimate: | $420,397 |
Length: | 8.7 Miles | Actual: | $360,270 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | FM 1863 | Let Status: | Actual |
Project ID: | CPM 470-2-10 | CSJ: | 0470-02-010 |
Description: | ACP OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | COMAL COUNTY LINE | Fund Cat: | 1 |
Limits To: | COMAL COUNTY LINE | Estimate: | $25,450 |
Length: | 0.5 Miles | Actual: | $22,150 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | FM 1863 | Let Status: | Actual |
Project ID: | CPM 470-3-14 | CSJ: | 0470-03-014 |
Description: | ACP OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.2 MI EAST OF US 281 | Fund Cat: | 1 |
Limits To: | BEXAR COUNTY LINE | Estimate: | $228,635 |
Length: | 5.0 Miles | Actual: | $196,287 |
District: | San Antonio | Let Date: | SEP 2002 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | CPM 2452-3-91 | CSJ: | 2452-03-091 |
Description: | SPOT BASE REPAIR, SEAL COAT & OVERLAY | Handling Code: |
|
Limits From: | 0.6 MI S OF SH 218 | Fund Cat: | 1 |
Limits To: | IH 10 | Estimate: | $1,813,995 |
Length: | 5.0 Miles | Actual: | $1,527,049 |
Back... |
Totals for 2452-03-091 | ||
Length: | 23.9 Miles | ||
Estimate: | $3,097,836 | ||
Actual: | $2,650,102 | ||
CCSJ: 2452-04-009 | |||
District: | San Antonio | Let Date: | JAN 2003 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | NH 2003(205) | CSJ: | 2452-04-009 |
Description: | REHAB & WIDEN NARROW PAVEMENT & SHOULDER | Handling Code: |
|
Limits From: | FM 1518 | Fund Cat: | 1 |
Limits To: | US 87 | Estimate: | $1,044,700 |
Length: | 1.5 Miles | Actual: | $878,348 |
Back... |
Totals for 2452-04-009 | ||
Length: | 1.5 Miles | ||
Estimate: | $1,044,700 | ||
Actual: | $878,348 |
|
|