Detail Letting Schedule for Dallas County (FY 2003)
Detail Letting Schedule for Dallas County (FY 2003) | ||||
Last Update: Thursday, August 28, 2003 |
Dallas County (FY 2003) |
CCSJ: 0009-11-190 | |||
District: | Dallas | Let Date: | NOV 2002 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | STP 2002(944)MM | CSJ: | 0009-11-190 |
Description: | INSTALLATION OF INCIDENT DETECTION AND RESPONSE SYSTEM | Handling Code: |
|
Limits From: | IH 35E | Fund Cat: | 7 |
Limits To: | US 80 | Estimate: | $4,802,582 |
Length: | 8.4 Miles | Actual: | $3,460,460 |
Back... |
Totals for 0009-11-190 | ||
---|---|---|---|
Length: | 8.4 Miles | ||
Estimate: | $4,802,582 | ||
Actual: | $3,460,460 | ||
CCSJ: 0009-11-193 | |||
District: | Dallas | Let Date: | JUN 2003 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | IM 30-5(73) | CSJ: | 0009-11-193 |
Description: | REPLACE EXISTING MOVABLE HOV BARRIER | Handling Code: |
XX |
Limits From: | US 75, CENTRAL EXPRESSWAY | Fund Cat: | 7 |
Limits To: | JIM MILLER ROAD | Estimate: | $8,173,033 |
Length: | 5.3 Miles | Actual: | $8,173,033 |
Back... |
Totals for 0009-11-193 | ||
Length: | 5.3 Miles | ||
Estimate: | $8,173,033 | ||
Actual: | $8,173,033 | ||
CCSJ: 0009-11-195 | |||
District: | Dallas | Let Date: | AUG 2003 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | C 9-11-195 | CSJ: | 0009-11-195 |
Description: | FULL DEPTH CONCRETE PAVEMENT REPAIR | Handling Code: |
|
Limits From: | LOOP 12 | Fund Cat: | 1 |
Limits To: | ROCKWALL COUNTY LINE | Estimate: | $585,468 |
Length: | 11.0 Miles | Actual: | $449,237 |
District: | Dallas | Let Date: | AUG 2003 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | C 9-12-202 | CSJ: | 0009-12-202 |
Description: | FULL DEPTH CONCRETE PAVEMENT REPAIR | Handling Code: |
|
Limits From: | DALLAS C/L | Fund Cat: | 1 |
Limits To: | HUNT C/L | Estimate: | $137,347 |
Length: | 15.0 Miles | Actual: | $177,409 |
Bid Tabulations Award Status Back... |
Totals for 0009-11-195 | ||
Length: | 26.0 Miles | ||
Estimate: | $722,815 | ||
Actual: | $626,646 | ||
CCSJ: 0009-11-197 | |||
District: | Dallas | Let Date: | OCT 2002 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | NH 2002(917) | CSJ: | 0009-11-197 |
Description: | SURFACE TEXTURING PAVEMENT TO IMPROVE SKID SCORES | Handling Code: |
|
Limits From: | TRINITY RIVER | Fund Cat: | 1 |
Limits To: | LOOP 12 | Estimate: | $664,043 |
Length: | 8.4 Miles | Actual: | $690,393 |
District: | Dallas | Let Date: | OCT 2002 |
Highway: | SH 342 | Let Status: | Actual |
Project ID: | NH 2002(917) | CSJ: | 0048-01-058 |
Description: | SURFACE TERTURING PAVEMENT TO IMPROVE SKID SCORES | Handling Code: |
|
Limits From: | BELTLINE RD IN LANCASTER | Fund Cat: | 1 |
Limits To: | FIVE MILE CREEK IN DALLAS | Estimate: | $530,967 |
Length: | 6.4 Miles | Actual: | $514,571 |
District: | Dallas | Let Date: | OCT 2002 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | NH 2002(917) | CSJ: | 0092-01-053 |
Description: | SURFACE TEXTURING PAVEMENT TO IMPROVE SKID SCORES | Handling Code: |
|
Limits From: | IH 45 | Fund Cat: | 1 |
Limits To: | SH 310 | Estimate: | $101,991 |
Length: | 1.6 Miles | Actual: | $105,597 |
District: | Dallas | Let Date: | OCT 2002 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | NH 2002(917) | CSJ: | 0197-02-093 |
Description: | RE - SURFACING PAVEMENT TO IMPROVE SKID SCORES | Handling Code: |
|
Limits From: | SH 310 | Fund Cat: | 1 |
Limits To: | WOODY RD | Estimate: | $769,805 |
Length: | 11.1 Miles | Actual: | $735,446 |
District: | Dallas | Let Date: | OCT 2002 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | NH 2002(917) | CSJ: | 0581-01-121 |
Description: | SURFACE TEXTURING PAVEMENT TO IMPROVE SKID SCORES | Handling Code: |
|
Limits From: | ELAM RD | Fund Cat: | 1 |
Limits To: | IH 30 | Estimate: | $190,621 |
Length: | 5.6 Miles | Actual: | $187,128 |
Back... |
Totals for 0009-11-197 | ||
Length: | 33.1 Miles | ||
Estimate: | $2,257,427 | ||
Actual: | $2,233,135 | ||
CCSJ: 0009-11-199 | |||
District: | Dallas | Let Date: | MAY 2003 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | IM 30-1(42) | CSJ: | 0009-11-199 |
Description: | REPAIR CRACKS AND SPALLS | Handling Code: |
|
Limits From: | AT SAMUELS ST OVERPASS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $745,813 |
Length: | 0.2 Miles | Actual: | $150,524 |
District: | Dallas | Let Date: | MAY 2003 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 45-3(117) | CSJ: | 0092-02-108 |
Description: | REPAIR CRACKS AND SPALLS | Handling Code: |
|
Limits From: | AT UP RR OVERPASSS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $152,890 |
Length: | 0.1 Miles | Actual: | $32,891 |
District: | Dallas | Let Date: | MAY 2003 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 45-3(117) | CSJ: | 0092-14-073 |
Description: | REPAIR CRACKS AND SPALLS | Handling Code: |
|
Limits From: | PINE ST AND HICKORY ST OVERPASSES | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,203,131 |
Length: | 2.1 Miles | Actual: | $244,215 |
Back... |
Totals for 0009-11-199 | ||
Length: | 2.4 Miles | ||
Estimate: | $2,101,834 | ||
Actual: | $427,630 | ||
CCSJ: 0047-07-194 | |||
District: | Dallas | Let Date: | JAN 2003 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | CPM 47-6-121 | CSJ: | 0047-06-121 |
Description: | UPGRADE PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 190/ US 75 I/C | Fund Cat: | 1 |
Limits To: | DALLAS C/L | Estimate: | $135,974 |
Length: | 1.3 Miles | Actual: | $103,775 |
District: | Dallas | Let Date: | JAN 2003 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | CPM 47-7-194 | CSJ: | 0047-07-194 |
Description: | UPGRADE PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | COLLIN C/L | Fund Cat: | 1 |
Limits To: | SPUR 366 | Estimate: | $1,874,677 |
Length: | 15.1 Miles | Actual: | $2,107,906 |
Back... |
Totals for 0047-07-194 | ||
Length: | 16.4 Miles | ||
Estimate: | $2,010,651 | ||
Actual: | $2,211,681 | ||
CCSJ: 0047-07-196 | |||
District: | Dallas | Let Date: | JUN 2003 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | STP 2002(610)MM | CSJ: | 0047-07-196 |
Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
Limits From: | AT CHURCHILL WAY | Fund Cat: | 7 |
Limits To: | . | Estimate: | |
Length: | 0.0 Miles | Actual: | $3,650,000 |
Back... |
Totals for 0047-07-196 | ||
Length: | 0.0 Miles | ||
Estimate: | |||
Actual: | $3,650,000 | ||
CCSJ: 0047-07-197 | |||
District: | Dallas | Let Date: | JAN 2003 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | C 47-7-197 | CSJ: | 0047-07-197 |
Description: | LANDSCAPE ESTABLISHMENT | Handling Code: |
|
Limits From: | DALLAS CITY LIMITS | Fund Cat: | 10 |
Limits To: | SPUR 366 (WOODALL ROGERS FREEWAY) | Estimate: | $818,030 |
Length: | 10.6 Miles | Actual: | $638,070 |
Back... |
Totals for 0047-07-197 | ||
Length: | 10.6 Miles | ||
Estimate: | $818,030 | ||
Actual: | $638,070 | ||
CCSJ: 0091-06-046 | |||
District: | Dallas | Let Date: | APR 2003 |
Highway: | SH 289 | Let Status: | Actual |
Project ID: | CM 2001(913) | CSJ: | 0091-06-046 |
Description: | RIGHT OF WAY ACQUISITION AND UTILITIES | Handling Code: |
XX |
Limits From: | ON SH 289 (PRESTON ROAD) | Fund Cat: | 5 |
Limits To: | AT FOREST LANE | Estimate: | |
Length: | 0.0 Miles | Actual: | $776,021 |
Back... |
Totals for 0091-06-046 | ||
Length: | 0.0 Miles | ||
Estimate: | |||
Actual: | $776,021 | ||
CCSJ: 0091-06-047 | |||
District: | Dallas | Let Date: | MAR 2003 |
Highway: | SH 289 | Let Status: | Actual |
Project ID: | CM 2002(539) | CSJ: | 0091-06-047 |
Description: | RIGHT OF WAY ACQUISITION AND UTILITIES | Handling Code: |
XX |
Limits From: | ALPHA ROAD | Fund Cat: | 5 |
Limits To: | AT SH 289 | Estimate: | $1 |
Length: | 0.0 Miles | Actual: | $705,142 |
Back... |
Totals for 0091-06-047 | ||
Length: | 0.0 Miles | ||
Estimate: | $1 | ||
Actual: | $705,142 | ||
CCSJ: 0092-07-051 | |||
District: | Dallas | Let Date: | DEC 2002 |
Highway: | SH 356 | Let Status: | Actual |
Project ID: | NH 2003(155) | CSJ: | 0092-07-051 |
Description: | TRAFFIC SIGNAL INSTALLATION | Handling Code: |
|
Limits From: | INTERSECT. OF LP12 FR IN CITY OF IRVING | Fund Cat: | 1 |
Limits To: | . | Estimate: | $127,955 |
Length: | 0.0 Miles | Actual: | $106,920 |
Back... |
Totals for 0092-07-051 | ||
Length: | 0.0 Miles | ||
Estimate: | $127,955 | ||
Actual: | $106,920 | ||
CCSJ: 0092-14-070 | |||
District: | Dallas | Let Date: | MAY 2003 |
Highway: | IH 345 | Let Status: | Actual |
Project ID: | BR 2003(261) | CSJ: | 0092-14-070 |
Description: | REPAIR BENT CAPS AND GIRDERS | Handling Code: |
|
Limits From: | NB AT IH 30, US 75 | Fund Cat: | 11 |
Limits To: | . | Estimate: | $451,000 |
Length: | 1.4 Miles | Actual: | $1,099,800 |
District: | Dallas | Let Date: | MAY 2003 |
Highway: | IH 345 | Let Status: | Actual |
Project ID: | BR 2003(261) | CSJ: | 0092-14-071 |
Description: | REPAIR BENT CAPS AND GIRDERS | Handling Code: |
|
Limits From: | SB AT IH 30, US 75 | Fund Cat: | 11 |
Limits To: | . | Estimate: | $368,000 |
Length: | 1.4 Miles | Actual: | $900,000 |
Back... |
Totals for 0092-14-070 | ||
Length: | 2.8 Miles | ||
Estimate: | $819,000 | ||
Actual: | $1,999,800 | ||
CCSJ: 0094-03-088 | |||
District: | Dallas | Let Date: | MAY 2003 |
Highway: | SH 183 | Let Status: | Actual |
Project ID: | NH 2003(446) | CSJ: | 0094-03-088 |
Description: | RAMP IMPROVEMENTS | Handling Code: |
|
Limits From: | EAST OF CARL ROAD | Fund Cat: | 11 |
Limits To: | LOOP 12 | Estimate: | $1,303,871 |
Length: | 1.1 Miles | Actual: | $974,162 |
Back... |
Totals for 0094-03-088 | ||
Length: | 1.1 Miles | ||
Estimate: | $1,303,871 | ||
Actual: | $974,162 | ||
CCSJ: 0094-03-092 | |||
District: | Dallas | Let Date: | APR 2003 |
Highway: | SH 183 | Let Status: | Actual |
Project ID: | NH 2003(401) | CSJ: | 0094-03-092 |
Description: | BRIDGE REPAIR | Handling Code: |
|
Limits From: | TRINITY RAILWAY EXPRESS @ SH 183 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $318,230 |
Length: | 0.3 Miles | Actual: | $397,401 |
Back... |
Totals for 0094-03-092 | ||
Length: | 0.3 Miles | ||
Estimate: | $318,230 | ||
Actual: | $397,401 | ||
CCSJ: 0196-03-221 | |||
District: | Dallas | Let Date: | APR 2003 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | STP 2003(403)MM | CSJ: | 0196-03-221 |
Description: | INSTALLATION OF INCIDENT DETECTION AND RESPONSE SYSTEM | Handling Code: |
|
Limits From: | LOOP 12 | Fund Cat: | 7 |
Limits To: | SH 183 | Estimate: | $1,899,617 |
Length: | 4.5 Miles | Actual: | $1,990,011 |
Back... |
Totals for 0196-03-221 | ||
Length: | 4.5 Miles | ||
Estimate: | $1,899,617 | ||
Actual: | $1,990,011 | ||
CCSJ: 0197-02-063 | |||
District: | Dallas | Let Date: | OCT 2002 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | NH 2003(13) | CSJ: | 0197-02-063 |
Description: | REPLACE EXISTING MBGF IN MEDIAN WITH CTB | Handling Code: |
|
Limits From: | SH 310 | Fund Cat: | 1 |
Limits To: | MALLOY BRIDGE ROAD | Estimate: | $6,281,013 |
Length: | 15.1 Miles | Actual: | $5,158,556 |
Back... |
Totals for 0197-02-063 | ||
Length: | 15.1 Miles | ||
Estimate: | $6,281,013 | ||
Actual: | $5,158,556 | ||
CCSJ: 0261-02-047 | |||
District: | Dallas | Let Date: | OCT 2002 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | CM 97(502) | CSJ: | 0261-02-047 |
Description: | 1 INTERSECTION IMPROVEMENT | Handling Code: |
|
Limits From: | COCKRELL HILL RD IN DALLAS, ETC. | Fund Cat: | 5 |
Limits To: | . | Estimate: | $86,798 |
Length: | 0.1 Miles | Actual: | $82,174 |
District: | Dallas | Let Date: | OCT 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 96(64) | CSJ: | 0918-45-291 |
Description: | 8 INTERSECTION IMPROVEMENTS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN DUNCANVILLE | Fund Cat: | 5 |
Limits To: | (OFF-SYSTEM) | Estimate: | $1,122,037 |
Length: | 0.8 Miles | Actual: | $1,074,293 |
Back... |
Totals for 0261-02-047 | ||
Length: | 0.9 Miles | ||
Estimate: | $1,208,835 | ||
Actual: | $1,156,467 | ||
CCSJ: 0261-03-047 | |||
District: | Dallas | Let Date: | JUL 2003 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | C 261-3-47 | CSJ: | 0261-03-047 |
Description: | SURFACE TEXTURING | Handling Code: |
|
Limits From: | IH 35 | Fund Cat: | 1 |
Limits To: | IH 20 | Estimate: | $490,276 |
Length: | 3.1 Miles | Actual: | $487,760 |
District: | Dallas | Let Date: | JUL 2003 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | C 442-2-134 | CSJ: | 0442-02-134 |
Description: | SURFACE TEXTURING | Handling Code: |
|
Limits From: | IH 20 | Fund Cat: | 1 |
Limits To: | CLARENDON DR | Estimate: | $656,218 |
Length: | 6.6 Miles | Actual: | $637,956 |
District: | Dallas | Let Date: | JUL 2003 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | C 2374-4-57 | CSJ: | 2374-04-057 |
Description: | SURFACING TEXTURING FOR IH 20 | Handling Code: |
|
Limits From: | TARRANT COUNTY LINE | Fund Cat: | 1 |
Limits To: | 0.5 MI W OF IH 35E | Estimate: | $1,362,306 |
Length: | 13.3 Miles | Actual: | $1,324,882 |
Bid Tabulations Back... |
Totals for 0261-03-047 | ||
Length: | 23.0 Miles | ||
Estimate: | $2,508,800 | ||
Actual: | $2,450,598 | ||
CCSJ: 0353-06-046 | |||
District: | Dallas | Let Date: | FEB 2003 |
Highway: | SH 114 | Let Status: | Actual |
Project ID: | CPM 353-6-46 | CSJ: | 0353-06-046 |
Description: | PLANING AND OVERLAY FRONTAGE ROADS | Handling Code: |
|
Limits From: | SPUR 348 | Fund Cat: | 1 |
Limits To: | LOOP 12 | Estimate: | $2,459,440 |
Length: | 3.3 Miles | Actual: | $2,227,057 |
Back... |
Totals for 0353-06-046 | ||
Length: | 3.3 Miles | ||
Estimate: | $2,459,440 | ||
Actual: | $2,227,057 | ||
CCSJ: 0918-00-068 | |||
District: | Dallas | Let Date: | DEC 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | CPM 918-00-68 | CSJ: | 0918-00-068 |
Description: | SEALCOAT | Handling Code: |
|
Limits From: | DALLAS DISTRICTWIDE NORTHERN SECTIONS | Fund Cat: | 1 |
Limits To: | IN DENTON, COLLIN, ROCKWALL & DALLAS CO. | Estimate: | $3,422,768 |
Length: | 176.9 Miles | Actual: | $3,441,479 |
Back... |
Totals for 0918-00-068 | ||
Length: | 176.9 Miles | ||
Estimate: | $3,422,768 | ||
Actual: | $3,441,479 | ||
CCSJ: 0918-00-069 | |||
District: | Dallas | Let Date: | JAN 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | CPM 918-00-69 | CSJ: | 0918-00-069 |
Description: | SEALCOAT | Handling Code: |
|
Limits From: | DALLAS DISTRICTWIDE SOUTHERN SECTIONS | Fund Cat: | 1 |
Limits To: | IN NAVARRO,KAUFMAN ELLIS & DALLAS CO.'S | Estimate: | $4,480,429 |
Length: | 203.5 Miles | Actual: | $4,598,637 |
Back... |
Totals for 0918-00-069 | ||
Length: | 203.5 Miles | ||
Estimate: | $4,480,429 | ||
Actual: | $4,598,637 | ||
CCSJ: 0918-00-082 | |||
District: | Dallas | Let Date: | DEC 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2003(146) | CSJ: | 0918-00-082 |
Description: | MILLED SHOULDER TEXTURING - ACP AND CONCRETE | Handling Code: |
|
Limits From: | VARIOUS DIVIDED HIGHWAYS IN DALLAS DIST | Fund Cat: | 1 |
Limits To: | . | Estimate: | $894,200 |
Length: | 439.7 Miles | Actual: | $511,962 |
Back... |
Totals for 0918-00-082 | ||
Length: | 439.7 Miles | ||
Estimate: | $894,200 | ||
Actual: | $511,962 | ||
CCSJ: 0918-00-084 | |||
District: | Dallas | Let Date: | FEB 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2003(380)MM | CSJ: | 0918-00-084 |
Description: | HIGH EMITTING VEHICLE TRADE PROGRAM / TRANSIT PASSES PLUS | Handling Code: |
XX |
Limits From: | HIGH-EMITTING VEHICLE TRADE PROGRAM | Fund Cat: | 7 |
Limits To: | NCTCOG | Estimate: | $3,737,009 |
Length: | 0.0 Miles | Actual: | $3,739,009 |
Back... |
Totals for 0918-00-084 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,737,009 | ||
Actual: | $3,739,009 | ||
CCSJ: 0918-00-085 | |||
District: | Dallas | Let Date: | JUL 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 918-0-85 | CSJ: | 0918-00-085 |
Description: | RAILROAD CROSSING PAVEMENT MARKINGS AND SIGNING | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $102,182 |
Length: | 0.0 Miles | Actual: | $81,605 |
Bid Tabulations Back... |
Totals for 0918-00-085 | ||
Length: | 0.0 Miles | ||
Estimate: | $102,182 | ||
Actual: | $81,605 | ||
CCSJ: 0918-00-090 | |||
District: | Dallas | Let Date: | APR 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2003(492)MM | CSJ: | 0918-00-090 |
Description: | AERIAL PHOTOGRAPHY AND CONTOURS, PHASE II | Handling Code: |
XX |
Limits From: | NCTCOG - COOPERATIVE DIGITAL AERIAL | Fund Cat: | 7 |
Limits To: | PHOTOGRAPHY AND ELEVATION CONTOUR PROJ | Estimate: | $259,375 |
Length: | 0.0 Miles | Actual: | $841,375 |
Back... |
Totals for 0918-00-090 | ||
Length: | 0.0 Miles | ||
Estimate: | $259,375 | ||
Actual: | $841,375 | ||
CCSJ: 0918-45-035 | |||
District: | Dallas | Let Date: | DEC 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2000(556)TE | CSJ: | 0918-45-035 |
Description: | CONSTRUCT A NEW MUSEUM BUILDING / HANGAR ON THE EAST SIDE OF | Handling Code: |
|
Limits From: | FRONTIERS OF FLIGHT MUSEUM AT LOVE FIELD | Fund Cat: | 9 |
Limits To: | . | Estimate: | $7,205,680 |
Length: | 0.0 Miles | Actual: | $6,725,000 |
Back... |
Totals for 0918-45-035 | ||
Length: | 0.0 Miles | ||
Estimate: | $7,205,680 | ||
Actual: | $6,725,000 | ||
CCSJ: 0918-45-198 | |||
District: | Dallas | Let Date: | JUL 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 94(186)TE | CSJ: | 0918-45-198 |
Description: | CONSTRUCT HIKE AND BIKE TRAIL TO PARALLEL ALONG BERNAL | Handling Code: |
NC |
Limits From: | NORWICH LANE ALONG BERNAL ROAD | Fund Cat: | 9 |
Limits To: | WESTMORLAND | Estimate: | $257,978 |
Length: | 0.7 Miles | Actual: | $232,606 |
Bid Tabulations Back... |
Totals for 0918-45-198 | ||
Length: | 0.7 Miles | ||
Estimate: | $257,978 | ||
Actual: | $232,606 | ||
CCSJ: 0918-45-311 | |||
District: | Dallas | Let Date: | AUG 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | C 918-45-311 | CSJ: | 0918-45-311 |
Description: | RECONSTRUCT CITY STREET | Handling Code: |
|
Limits From: | ON NORTHWEST HIGHWAY FROM SHILOH ROAD | Fund Cat: | 10 |
Limits To: | TO IH 635 IN THE CITY OF DALLAS | Estimate: | $840,418 |
Length: | 0.3 Miles | Actual: | $826,881 |
Bid Tabulations Award Status Back... |
Totals for 0918-45-311 | ||
Length: | 0.3 Miles | ||
Estimate: | $840,418 | ||
Actual: | $826,881 | ||
CCSJ: 0918-45-347 | |||
District: | Dallas | Let Date: | SEP 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 97(108) | CSJ: | 0918-45-347 |
Description: | INTERSECTION IMPROVEMENTS | Handling Code: |
|
Limits From: | AT MOCKINGBIRD LANE, AT GREENVILLE AVE | Fund Cat: | 5 |
Limits To: | . | Estimate: | $385,735 |
Length: | 0.3 Miles | Actual: | $314,652 |
Back... |
Totals for 0918-45-347 | ||
Length: | 0.3 Miles | ||
Estimate: | $385,735 | ||
Actual: | $314,652 | ||
CCSJ: 0918-45-373 | |||
District: | Dallas | Let Date: | MAR 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 97(440)MM | CSJ: | 0918-45-373 |
Description: | WIDEN 3 - LANE FACILITY TO 4 - LANE FACILITY | Handling Code: |
LC |
Limits From: | ON ROCHELLE BOULEVARD, O'CONNOR | Fund Cat: | 7 |
Limits To: | TELEPORT BLVD | Estimate: | $1,811,010 |
Length: | 1.0 Miles | Actual: | $1,151,033 |
Back... |
Totals for 0918-45-373 | ||
Length: | 1.0 Miles | ||
Estimate: | $1,811,010 | ||
Actual: | $1,151,033 | ||
CCSJ: 0918-45-433 | |||
District: | Dallas | Let Date: | DEC 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2003(270)HES | CSJ: | 0918-45-433 |
Description: | TRAFFIC SIGNAL UPGRADE | Handling Code: |
|
Limits From: | INTERSECTION OF GASTON AVE. & HALL ST. | Fund Cat: | 8 |
Limits To: | . | Estimate: | $73,475 |
Length: | 0.0 Miles | Actual: | $52,835 |
Back... |
Totals for 0918-45-433 | ||
Length: | 0.0 Miles | ||
Estimate: | $73,475 | ||
Actual: | $52,835 | ||
CCSJ: 0918-45-458 | |||
District: | Dallas | Let Date: | JAN 2003 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2000(329)OX | CSJ: | 0918-45-458 |
Description: | REPLACE BR & APPRS | Handling Code: |
|
Limits From: | TOWN EAST BLVD AT DUCK CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $1,111,521 |
Length: | 0.2 Miles | Actual: | $789,572 |
Back... |
Totals for 0918-45-458 | ||
Length: | 0.2 Miles | ||
Estimate: | $1,111,521 | ||
Actual: | $789,572 | ||
CCSJ: 0918-45-462 | |||
District: | Dallas | Let Date: | NOV 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2000(965) | CSJ: | 0918-45-462 |
Description: | 1 OFF SYSTEM INTERSECTION IMPROVEMENT | Handling Code: |
LC |
Limits From: | JEFFERSON AT IDLEWILD IN DALLAS COUNTY | Fund Cat: | 5 |
Limits To: | . | Estimate: | $391,630 |
Length: | 0.3 Miles | Actual: | $484,484 |
Back... |
Totals for 0918-45-462 | ||
Length: | 0.3 Miles | ||
Estimate: | $391,630 | ||
Actual: | $484,484 | ||
CCSJ: 0918-45-524 | |||
District: | Dallas | Let Date: | FEB 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2000(551)TE | CSJ: | 0918-45-524 |
Description: | CONTRUCT PEDESTRIAN / BICYCLE MULTI - MODAL USE TRAIL AS PART OF | Handling Code: |
LC |
Limits From: | MOCKINGBIRD LANE PEDESTRIAN/BICYCLE | Fund Cat: | 9 |
Limits To: | LINKAGE PROJECT | Estimate: | $558,784 |
Length: | 0.8 Miles | Actual: | $557,759 |
Back... |
Totals for 0918-45-524 | ||
Length: | 0.8 Miles | ||
Estimate: | $558,784 | ||
Actual: | $557,759 | ||
CCSJ: 0918-45-542 | |||
District: | Dallas | Let Date: | NOV 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | ITS 2000(988) | CSJ: | 0918-45-542 |
Description: | ITS DEPLOYMENT | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN DALLAS | Fund Cat: | 10 |
Limits To: | . | Estimate: | $1,149,184 |
Length: | 0.0 Miles | Actual: | $908,200 |
Back... |
Totals for 0918-45-542 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,149,184 | ||
Actual: | $908,200 | ||
CCSJ: 0918-45-551 | |||
District: | Dallas | Let Date: | NOV 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | CUS 918-45-551 | CSJ: | 0918-45-551 |
Description: | MILLING AND ASPHALT OVERLAY | Handling Code: |
XX |
Limits From: | ON MARSH LANE FROM WALNUT HILL LANE | Fund Cat: | 10 |
Limits To: | ROYAL LANE | Estimate: | $1,380,000 |
Length: | 1.1 Miles | Actual: | $1,207,000 |
Back... |
Totals for 0918-45-551 | ||
Length: | 1.1 Miles | ||
Estimate: | $1,380,000 | ||
Actual: | $1,207,000 | ||
CCSJ: 0918-45-552 | |||
District: | Dallas | Let Date: | NOV 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | CUS 918-45-552 | CSJ: | 0918-45-552 |
Description: | PAVEMENT REPAIR | Handling Code: |
XX |
Limits From: | ON FERGUSON FROM OATES | Fund Cat: | 10 |
Limits To: | GUS THOMASSON | Estimate: | $805,000 |
Length: | 1.1 Miles | Actual: | $564,000 |
Back... |
Totals for 0918-45-552 | ||
Length: | 1.1 Miles | ||
Estimate: | $805,000 | ||
Actual: | $564,000 | ||
CCSJ: 0918-45-553 | |||
District: | Dallas | Let Date: | NOV 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | CUS 918-45-553 | CSJ: | 0918-45-553 |
Description: | MILLING AND ASPHALT OVERLAY | Handling Code: |
XX |
Limits From: | ON MOCKINGBIRD (W) FROM HARRY HINES | Fund Cat: | 10 |
Limits To: | TO ELMBROOK | Estimate: | $915,843 |
Length: | 0.6 Miles | Actual: | $281,750 |
Back... |
Totals for 0918-45-553 | ||
Length: | 0.6 Miles | ||
Estimate: | $915,843 | ||
Actual: | $281,750 | ||
CCSJ: 0918-45-554 | |||
District: | Dallas | Let Date: | NOV 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | CUS 918-45-554 | CSJ: | 0918-45-554 |
Description: | MILLING AND ASPHALT OVERLAY | Handling Code: |
XX |
Limits From: | ON KIEST BLVD. FROM ALABAMA | Fund Cat: | 10 |
Limits To: | MARSALIS | Estimate: | $283,186 |
Length: | 0.4 Miles | Actual: | $107,800 |
Back... |
Totals for 0918-45-554 | ||
Length: | 0.4 Miles | ||
Estimate: | $283,186 | ||
Actual: | $107,800 | ||
CCSJ: 0918-45-597 | |||
District: | Dallas | Let Date: | AUG 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | C 918-45-597 | CSJ: | 0918-45-597 |
Description: | PAVEMENT REPAIR | Handling Code: |
|
Limits From: | ON LAKE JUNE RD. FROM BALCH SPRINGS | Fund Cat: | 10 |
Limits To: | WEST CITY LIMITS TO IH 635 | Estimate: | $122,048 |
Length: | 1.8 Miles | Actual: | $94,814 |
District: | Dallas | Let Date: | AUG 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | C 918-45-598 | CSJ: | 0918-45-598 |
Description: | PAVEMENT REPAIR | Handling Code: |
|
Limits From: | ON ELAM RD. FROM BALCH SPRINGS C/L(WEST) | Fund Cat: | 10 |
Limits To: | PIONEER | Estimate: | $131,819 |
Length: | 2.0 Miles | Actual: | $108,213 |
Bid Tabulations Award Status Back... |
Totals for 0918-45-597 | ||
Length: | 3.8 Miles | ||
Estimate: | $253,867 | ||
Actual: | $203,027 | ||
CCSJ: 0918-45-604 | |||
District: | Dallas | Let Date: | MAY 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | CUS 918-45-604 | CSJ: | 0918-45-604 |
Description: | RECONSTRUCT CITY STREET | Handling Code: |
LC |
Limits From: | ON SATURN RD. FROM MILLER RD. | Fund Cat: | 10 |
Limits To: | KINGSLEY ROAD | Estimate: | $1,350,000 |
Length: | 1.0 Miles | Actual: | $248,000 |
Back... |
Totals for 0918-45-604 | ||
Length: | 1.0 Miles | ||
Estimate: | $1,350,000 | ||
Actual: | $248,000 | ||
CCSJ: 0918-45-606 | |||
District: | Dallas | Let Date: | OCT 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2003(179) | CSJ: | 0918-45-606 |
Description: | PURCHASE 3 PASSENGER CARS | Handling Code: |
TR |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 5 |
Limits To: | FWTA/DART-TRINITY RAILWAY EXPRESS TRAINS | Estimate: | $4,480,000 |
Length: | 0.0 Miles | Actual: | $4,480,000 |
Back... |
Totals for 0918-45-606 | ||
Length: | 0.0 Miles | ||
Estimate: | $4,480,000 | ||
Actual: | $4,480,000 | ||
CCSJ: 0918-45-620 | |||
District: | Dallas | Let Date: | SEP 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2002(450) | CSJ: | 0918-45-620 |
Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
Limits From: | BELTLINE ROAD AT COIT ROAD | Fund Cat: | 5 |
Limits To: | . | Estimate: | |
Length: | 0.0 Miles | Actual: | $154,415 |
Back... |
Totals for 0918-45-620 | ||
Length: | 0.0 Miles | ||
Estimate: | |||
Actual: | $154,415 | ||
CCSJ: 0918-45-621 | |||
District: | Dallas | Let Date: | SEP 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2002(451) | CSJ: | 0918-45-621 |
Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
Limits From: | ARAPAHO ROAD AT COIT ROAD | Fund Cat: | 5 |
Limits To: | . | Estimate: | |
Length: | 0.0 Miles | Actual: | $1,224,586 |
Back... |
Totals for 0918-45-621 | ||
Length: | 0.0 Miles | ||
Estimate: | |||
Actual: | $1,224,586 | ||
CCSJ: 0918-45-622 | |||
District: | Dallas | Let Date: | SEP 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2002(452) | CSJ: | 0918-45-622 |
Description: | RIGHT OF WAY ACQUISITION | Handling Code: |
XX |
Limits From: | CAMPBELL ROAD AT COITROAD | Fund Cat: | 5 |
Limits To: | . | Estimate: | |
Length: | 0.0 Miles | Actual: | $618,858 |
Back... |
Totals for 0918-45-622 | ||
Length: | 0.0 Miles | ||
Estimate: | |||
Actual: | $618,858 | ||
CCSJ: 0918-45-648 | |||
District: | Dallas | Let Date: | JUN 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2002(236) | CSJ: | 0918-45-648 |
Description: | RIGHT OF WAY ACQUISITION AND RELOCATION | Handling Code: |
XX |
Limits From: | WEBB CHAPEL ROAD AT MAYBROOK DRIVE | Fund Cat: | 5 |
Limits To: | . | Estimate: | |
Length: | 0.0 Miles | Actual: | $133,926 |
Back... |
Totals for 0918-45-648 | ||
Length: | 0.0 Miles | ||
Estimate: | |||
Actual: | $133,926 | ||
CCSJ: 0918-45-661 | |||
District: | Dallas | Let Date: | JUL 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | C 918-45-661 | CSJ: | 0918-45-661 |
Description: | RECONSTRUCT CITY STREET | Handling Code: |
LC |
Limits From: | ON COMMERCE ST FROM INDUSTRIAL BLVD | Fund Cat: | 10 |
Limits To: | US 75 CENTRAL EXPRESSWAY | Estimate: | $563,500 |
Length: | 0.0 Miles | Actual: | $838,053 |
District: | Dallas | Let Date: | JUL 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | C 918-45-662 | CSJ: | 0918-45-662 |
Description: | RECONSTRUCT CITY STREET | Handling Code: |
LC |
Limits From: | ON ELM ST FROM INDUSTRIAL BLVD. | Fund Cat: | 10 |
Limits To: | AKARD & FROM PEARL EXPWY TO HAWKINS ST | Estimate: | $1,880,250 |
Length: | 1.3 Miles | Actual: | $674,124 |
Back... |
Totals for 0918-45-661 | ||
Length: | 1.3 Miles | ||
Estimate: | $2,443,750 | ||
Actual: | $1,512,177 | ||
CCSJ: 0918-45-664 | |||
District: | Dallas | Let Date: | JUN 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2003(549) | CSJ: | 0918-45-664 |
Description: | RIGHT OF WAY ACQUISITION AND RELOCATION | Handling Code: |
XX |
Limits From: | HARVEST HILL RD AT INWOOD RD (DNT) | Fund Cat: | 5 |
Limits To: | . | Estimate: | $1 |
Length: | 0.0 Miles | Actual: | $20,236 |
Back... |
Totals for 0918-45-664 | ||
Length: | 0.0 Miles | ||
Estimate: | $1 | ||
Actual: | $20,236 | ||
CCSJ: 0918-45-665 | |||
District: | Dallas | Let Date: | JUN 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2003(550) | CSJ: | 0918-45-665 |
Description: | RIGHT OF WAY ACQUISITION AND RELOCATION | Handling Code: |
XX |
Limits From: | HARVEST HILL RD AT MONTFORT ROAD | Fund Cat: | 5 |
Limits To: | . | Estimate: | $1 |
Length: | 0.0 Miles | Actual: | $1,868 |
Back... |
Totals for 0918-45-665 | ||
Length: | 0.0 Miles | ||
Estimate: | $1 | ||
Actual: | $1,868 | ||
CCSJ: 0918-45-666 | |||
District: | Dallas | Let Date: | JUN 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2003(551) | CSJ: | 0918-45-666 |
Description: | RIGHT OF WAY ACQUISITION AND RELOCATION | Handling Code: |
XX |
Limits From: | HARVEST HILL RD AT NOEL RD | Fund Cat: | 5 |
Limits To: | . | Estimate: | $1 |
Length: | 0.0 Miles | Actual: | $75,532 |
Back... |
Totals for 0918-45-666 | ||
Length: | 0.0 Miles | ||
Estimate: | $1 | ||
Actual: | $75,532 | ||
CCSJ: 0918-45-668 | |||
District: | Dallas | Let Date: | MAR 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2003(437)MM | CSJ: | 0918-45-668 |
Description: | CBD JOINT TRANSPORTATION STUDY | Handling Code: |
XX |
Limits From: | VARIOUS LOCATION IN THE CITY OF DALLAS | Fund Cat: | 7 |
Limits To: | . | Estimate: | $775,000 |
Length: | 0.0 Miles | Actual: | $775,000 |
Back... |
Totals for 0918-45-668 | ||
Length: | 0.0 Miles | ||
Estimate: | $775,000 | ||
Actual: | $775,000 | ||
CCSJ: 0918-45-683 | |||
District: | Dallas | Let Date: | AUG 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 918-45-683 | CSJ: | 0918-45-683 |
Description: | CONCRETE PAVEMENT REPAIR | Handling Code: |
|
Limits From: | COUNTY WIDE | Fund Cat: | 1 |
Limits To: | COUNTY WIDE | Estimate: | $2,383,992 |
Length: | 89.0 Miles | Actual: | $2,193,474 |
Bid Tabulations Award Status Back... |
Totals for 0918-45-683 | ||
Length: | 89.0 Miles | ||
Estimate: | $2,383,992 | ||
Actual: | $2,193,474 | ||
CCSJ: 1047-03-053 | |||
District: | Dallas | Let Date: | NOV 2002 |
Highway: | FM 1382 | Let Status: | Actual |
Project ID: | NH 2002(941) | CSJ: | 1047-03-053 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | SPUR 303 | Fund Cat: | 10 |
Limits To: | IH 20 | Estimate: | $200,558 |
Length: | 2.9 Miles | Actual: | $146,215 |
Back... |
Totals for 1047-03-053 | ||
Length: | 2.9 Miles | ||
Estimate: | $200,558 | ||
Actual: | $146,215 | ||
CCSJ: 2374-01-104 | |||
District: | Dallas | Let Date: | NOV 2002 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | CM 2001(292) | CSJ: | 2374-01-104 |
Description: | 4 ON SYSTEM INTERSECTION IMPROVEMENTS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS AT IH 635 | Fund Cat: | 5 |
Limits To: | IN THE CITIES OF DALLAS AND FARMERS BRAN | Estimate: | $2,535,930 |
Length: | 0.6 Miles | Actual: | $2,182,890 |
Back... |
Totals for 2374-01-104 | ||
Length: | 0.6 Miles | ||
Estimate: | $2,535,930 | ||
Actual: | $2,182,890 | ||
CCSJ: 2374-01-141 | |||
District: | Dallas | Let Date: | JUL 2003 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | C 2374-1-141 | CSJ: | 2374-01-141 |
Description: | GRADING, BASE AND PAVING, DRAINAGE, RETAINING WALL, SIGNING, | Handling Code: |
|
Limits From: | AT JUPITER ROAD | Fund Cat: | 11 |
Limits To: | . | Estimate: | $821,988 |
Length: | 0.0 Miles | Actual: | $823,008 |
Bid Tabulations Back... |
Totals for 2374-01-141 | ||
Length: | 0.0 Miles | ||
Estimate: | $821,988 | ||
Actual: | $823,008 | ||
CCSJ: 2374-01-145 | |||
District: | Dallas | Let Date: | AUG 2003 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | C 2374-1-145 | CSJ: | 2374-01-145 |
Description: | TEXTURE EXISTING PAVEMENT SURFACE | Handling Code: |
|
Limits From: | W. ABUT. BNSF RR OVERPASS | Fund Cat: | 1 |
Limits To: | W. ABUT. GC & KCS RR OVERPASS | Estimate: | $4,959,757 |
Length: | 15.3 Miles | Actual: | $3,016,055 |
District: | Dallas | Let Date: | AUG 2003 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | C 2374-2-111 | CSJ: | 2374-02-111 |
Description: | TEXTURE EXISTING PAVEMENT SURFACE | Handling Code: |
|
Limits From: | W. ABUT. GC & KCS RR OVERPASS | Fund Cat: | 1 |
Limits To: | IH 30 | Estimate: | $307,458 |
Length: | 4.3 Miles | Actual: | $485,784 |
District: | Dallas | Let Date: | AUG 2003 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | C 2374-7-51 | CSJ: | 2374-07-051 |
Description: | TEXTURE EXISTING PAVEMENT SURFACE | Handling Code: |
|
Limits From: | W. ABUT. ELM FORK OF TRINITY RIVER | Fund Cat: | 1 |
Limits To: | W. ABUT. BNSF RR OVERPASS | Estimate: | $422,891 |
Length: | 1.7 Miles | Actual: | $243,784 |
Bid Tabulations Award Status Back... |
Totals for 2374-01-145 | ||
Length: | 21.3 Miles | ||
Estimate: | $5,690,106 | ||
Actual: | $3,745,623 | ||
CCSJ: 2374-02-098 | |||
District: | Dallas | Let Date: | NOV 2002 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | NH 2002(815) | CSJ: | 2374-02-098 |
Description: | CONSTRUCT INTERCHANGE @ TOWN CENTRE DRIVE, REPLACE BRIDGES, | Handling Code: |
|
Limits From: | NORTH OF TOWN EAST BLVD | Fund Cat: | 7 |
Limits To: | US 80 | Estimate: | $9,664,284 |
Length: | 1.0 Miles | Actual: | $10,135,795 |
Back... |
Totals for 2374-02-098 | ||
Length: | 1.0 Miles | ||
Estimate: | $9,664,284 | ||
Actual: | $10,135,795 | ||
CCSJ: 2374-02-114 | |||
District: | Dallas | Let Date: | JUL 2003 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | C 2374-2-114 | CSJ: | 2374-02-114 |
Description: | MILL AND INLAY | Handling Code: |
|
Limits From: | SEAGOVILLE ROAD | Fund Cat: | 1 |
Limits To: | IH 30 | Estimate: | $6,319,033 |
Length: | 6.1 Miles | Actual: | $5,896,255 |
Bid Tabulations Back... |
Totals for 2374-02-114 | ||
Length: | 6.1 Miles | ||
Estimate: | $6,319,033 | ||
Actual: | $5,896,255 | ||
CCSJ: 2374-03-054 | |||
District: | Dallas | Let Date: | AUG 2003 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | NH 2003(524) | CSJ: | 2374-03-054 |
Description: | CONSTRUCT EB FRONTAGE ROAD | Handling Code: |
|
Limits From: | BONNIEVIEW ROAD | Fund Cat: | 12 |
Limits To: | LANCASTER BLVD. | Estimate: | $2,606,883 |
Length: | 1.9 Miles | Actual: | $2,309,092 |
District: | Dallas | Let Date: | AUG 2003 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | NH 2001(780) | CSJ: | 2374-03-062 |
Description: | RIGHT OF WAY UTILITIES | Handling Code: |
|
Limits From: | BONNIEVIEW ROAD | Fund Cat: | 7 |
Limits To: | LANCASTER BLVD | Estimate: | $47,960 |
Length: | 0.0 Miles | Actual: | $47,511 |
Bid Tabulations Award Status Back... |
Totals for 2374-03-054 | ||
Length: | 1.9 Miles | ||
Estimate: | $2,654,843 | ||
Actual: | $2,356,603 | ||
CCSJ: 2374-04-041 | |||
District: | Dallas | Let Date: | AUG 2003 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | STP 2003(570)MM | CSJ: | 2374-04-041 |
Description: | CONSTRUCT FRONTAGE ROAD SEGMENTS | Handling Code: |
|
Limits From: | DUNCANVILLE ROAD | Fund Cat: | 7 |
Limits To: | WINDING TRAIL | Estimate: | $1,390,918 |
Length: | 0.3 Miles | Actual: | $1,051,302 |
Bid Tabulations Award Status Back... |
Totals for 2374-04-041 | ||
Length: | 0.3 Miles | ||
Estimate: | $1,390,918 | ||
Actual: | $1,051,302 | ||
CCSJ: 2374-04-048 | |||
District: | Dallas | Let Date: | DEC 2002 |
Highway: | SH 342 | Let Status: | Actual |
Project ID: | IM 20-5(129) | CSJ: | 0048-01-054 |
Description: | TRAFFIC SIGNAL EQUIPMENT UPGRADE | Handling Code: |
|
Limits From: | INTERSECTIONS OF CEDARDALE, MAIN ST. | Fund Cat: | 1 |
Limits To: | AND PLEASANT RUN ROAD | Estimate: | $309,949 |
Length: | 2.8 Miles | Actual: | $120,630 |
District: | Dallas | Let Date: | DEC 2002 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | IM 20-5(129) | CSJ: | 0197-02-086 |
Description: | TRAFFIC SIGNAL EQUIPMENT UPGRADE | Handling Code: |
|
Limits From: | INTERSECTIONS OF HALL ROAD | Fund Cat: | 1 |
Limits To: | ' | Estimate: | $26,103 |
Length: | 0.0 Miles | Actual: | $27,780 |
District: | Dallas | Let Date: | DEC 2002 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | IM 20-5(129) | CSJ: | 0261-02-053 |
Description: | TRAFFIC SIGNAL EQUIPMENT UPGRADE | Handling Code: |
|
Limits From: | INTERSECTIONS OF COCKRELL HILL, | Fund Cat: | 1 |
Limits To: | DANIELDALE RD, MAIN ST & BELTLINE RD | Estimate: | $137,833 |
Length: | 0.7 Miles | Actual: | $136,965 |
District: | Dallas | Let Date: | DEC 2002 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | IM 20-5(129) | CSJ: | 2374-04-048 |
Description: | TRAFFIC SIGNAL EQUIPMENT UPGRADE | Handling Code: |
|
Limits From: | INTERSECTIONS OF CAMP WISDOM,CEDAR RIDG, | Fund Cat: | 1 |
Limits To: | DUNCANVILLE RD AND NORTH MAIN STREET | Estimate: | $146,505 |
Length: | 0.0 Miles | Actual: | $130,676 |
Back... |
Totals for 2374-04-048 | ||
Length: | 3.5 Miles | ||
Estimate: | $620,390 | ||
Actual: | $416,051 | ||
CCSJ: 8050-18-027 | |||
District: | Dallas | Let Date: | JAN 2003 |
Highway: | MH | Let Status: | Actual |
Project ID: | C 8050-18-27 | CSJ: | 8050-18-027 |
Description: | RECONSTRUCT EXISTING 4 - LANE DIVIDED RURAL ROADWAY TO | Handling Code: |
|
Limits From: | IN GRAND PRAIRE ON BELT LINE ROAD | Fund Cat: | 2 |
Limits To: | FROM: IH 30 TO N. OF HUNTER FERRELL ROAD | Estimate: | $12,947,873 |
Length: | 1.4 Miles | Actual: | $11,360,620 |
Back... |
Totals for 8050-18-027 | ||
Length: | 1.4 Miles | ||
Estimate: | $12,947,873 | ||
Actual: | $11,360,620 | ||
CCSJ: 8050-18-028 | |||
District: | Dallas | Let Date: | OCT 2002 |
Highway: | MH | Let Status: | Actual |
Project ID: | C 8050-18-28 | CSJ: | 8050-18-028 |
Description: | RECONSTRUCT EXISTING 2 - LANE RURAL ROADWAY TO 4 - LANE | Handling Code: |
|
Limits From: | IN LANCASTER ON BELTLINE ROAD | Fund Cat: | 2 |
Limits To: | FROM IH 35E TO BLUE GROVE ROAD | Estimate: | $6,894,091 |
Length: | 2.1 Miles | Actual: | $6,883,812 |
Back... |
Totals for 8050-18-028 | ||
Length: | 2.1 Miles | ||
Estimate: | $6,894,091 | ||
Actual: | $6,883,812 | ||
CCSJ: 8050-18-032 | |||
District: | Dallas | Let Date: | OCT 2002 |
Highway: | MH | Let Status: | Actual |
Project ID: | C 8050-18-32 | CSJ: | 8050-18-032 |
Description: | RECONSTRUCT EXISTING 2 - LANE RURAL ROADWAY TO 6 - LANE | Handling Code: |
|
Limits From: | IN BALCH SPRINGS & MESQUITE ON BELT | Fund Cat: | 2 |
Limits To: | LINE RD FR LAKE JUNE RD TO BRUTON RD | Estimate: | $5,297,935 |
Length: | 0.5 Miles | Actual: | $4,399,971 |
District: | Dallas | Let Date: | OCT 2002 |
Highway: | MH | Let Status: | Actual |
Project ID: | C 8245-18-1 | CSJ: | 8245-18-001 |
Description: | RECONSTRUCT EXISTING 2 - LANE RURAL ROADWAY TO 6 - LANE | Handling Code: |
|
Limits From: | IN BALCH SPRINGS & DALLAS CO. ON LAKE JU | Fund Cat: | 10 |
Limits To: | NE RD FROM BALCH SPRINGS RD TO BELT LINE | Estimate: | $2,913,974 |
Length: | 0.7 Miles | Actual: | $2,494,318 |
Back... |
Totals for 8050-18-032 | ||
Length: | 1.2 Miles | ||
Estimate: | $8,211,909 | ||
Actual: | $6,894,289 |
|
|