Detail Letting Schedule for El Paso County (FY 2003)
Detail Letting Schedule for El Paso County (FY 2003) | ||||
Last Update: Thursday, August 28, 2003 |
El Paso County (FY 2003) |
CCSJ: 0001-04-073 | |||
District: | El Paso | Let Date: | JUN 2003 |
Highway: | US 85 | Let Status: | Actual |
Project ID: | STP 2000(118)MM | CSJ: | 0001-04-073 |
Description: | REPLACE EXISTING ASPH CONC PAVE WITH CPCR, ASPH CONC PAVE, | Handling Code: |
|
Limits From: | ON PAISANO DR,0.121 KM W OF SANTA FE | Fund Cat: | 7 |
Limits To: | 0.298 KM E OF CAMPBELL ST | Estimate: | $5,057,805 |
Length: | 0.6 Miles | Actual: | $5,925,190 |
Bid Tabulations Back... |
Totals for 0001-04-073 | ||
---|---|---|---|
Length: | 0.6 Miles | ||
Estimate: | $5,057,805 | ||
Actual: | $5,925,190 | ||
CCSJ: 0001-04-080 | |||
District: | El Paso | Let Date: | FEB 2003 |
Highway: | US 62 | Let Status: | Actual |
Project ID: | CPM 1-4-80 | CSJ: | 0001-04-080 |
Description: | MILL 2.0" AND OVERLAY | Handling Code: |
|
Limits From: | CONCEPCION STREET | Fund Cat: | 1 |
Limits To: | SH 20 | Estimate: | $632,132 |
Length: | 0.3 Miles | Actual: | $130,574 |
District: | El Paso | Let Date: | FEB 2003 |
Highway: | FM 1905 | Let Status: | Actual |
Project ID: | CPM 1-7-9 | CSJ: | 0001-07-009 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | TEXAS/NEW MEXICO STATE LINE | Fund Cat: | 1 |
Limits To: | 150' WEST OF SH 20 | Estimate: | $100,005 |
Length: | 0.7 Miles | Actual: | $66,803 |
District: | El Paso | Let Date: | FEB 2003 |
Highway: | SH 20 | Let Status: | Actual |
Project ID: | CPM 2-1-73 | CSJ: | 0002-01-073 |
Description: | MILL 2.0" AND OVERLAY | Handling Code: |
|
Limits From: | BOONE STREET | Fund Cat: | 1 |
Limits To: | BUENA VISTA STREET | Estimate: | $398,421 |
Length: | 1.3 Miles | Actual: | $347,564 |
District: | El Paso | Let Date: | FEB 2003 |
Highway: | US 62 | Let Status: | Actual |
Project ID: | CPM 374-2-81 | CSJ: | 0374-02-081 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | 1.23 MI EAST OF INTERSECTION WITH SL 375 | Fund Cat: | 1 |
Limits To: | 2.802 MI EAST OF LP 375 | Estimate: | $425,596 |
Length: | 1.6 Miles | Actual: | $316,707 |
District: | El Paso | Let Date: | FEB 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | CPM 924-0-47 | CSJ: | 0924-00-047 |
Description: | STRIPING | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $5,127,863 |
Length: | 100.0 Miles | Actual: | $1,324,155 |
District: | El Paso | Let Date: | FEB 2003 |
Highway: | RM 1111 | Let Status: | Actual |
Project ID: | CPM 1282-2-22 | CSJ: | 1282-02-022 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | 0.284 MI NORTH OF BI 10C | Fund Cat: | 1 |
Limits To: | BI 10C | Estimate: | $35,868 |
Length: | 0.3 Miles | Actual: | $25,397 |
District: | El Paso | Let Date: | FEB 2003 |
Highway: | RM 1111 | Let Status: | Actual |
Project ID: | CPM 1282-3-4 | CSJ: | 1282-03-004 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | BI 10C | Fund Cat: | 1 |
Limits To: | 0.534 MI SOUTH OF BI 10C | Estimate: | $52,082 |
Length: | 0.5 Miles | Actual: | $34,691 |
District: | El Paso | Let Date: | FEB 2003 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | CPM 2121-1-65 | CSJ: | 2121-01-065 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | TEXAS/NEW MEXICO STATE LINE | Fund Cat: | 1 |
Limits To: | FM 1905 ON IH 10 FRONTAGE ROAD | Estimate: | $25,246 |
Length: | 0.3 Miles | Actual: | $16,987 |
District: | El Paso | Let Date: | FEB 2003 |
Highway: | FM 2529 | Let Status: | Actual |
Project ID: | CPM 2326-1-17 | CSJ: | 2326-01-017 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | INTERSECTION | Fund Cat: | 1 |
Limits To: | @ FM 2529 AND STAN ROBERTS SR | Estimate: | $23,544 |
Length: | 0.2 Miles | Actual: | $15,896 |
District: | El Paso | Let Date: | FEB 2003 |
Highway: | FM 1905 | Let Status: | Actual |
Project ID: | CPM 2551-1-7 | CSJ: | 2551-01-007 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | SH 20 (EAST) | Fund Cat: | 1 |
Limits To: | 1.098 MI NORTH OF SH 20 (EAST) | Estimate: | $133,090 |
Length: | 1.1 Miles | Actual: | $88,915 |
District: | El Paso | Let Date: | FEB 2003 |
Highway: | LP 375 | Let Status: | Actual |
Project ID: | CPM 2552-1-43 | CSJ: | 2552-01-043 |
Description: | MILL AND OVERLAY | Handling Code: |
|
Limits From: | 0.4 MI EAST OF RUSHING | Fund Cat: | 1 |
Limits To: | RAILROAD AND LOOP 375 | Estimate: | $333,876 |
Length: | 1.4 Miles | Actual: | $228,266 |
District: | El Paso | Let Date: | FEB 2003 |
Highway: | RM 2775 | Let Status: | Actual |
Project ID: | CPM 3137-1-5 | CSJ: | 3137-01-005 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | 0.022 MI NORTH OF US 62/180 | Fund Cat: | 1 |
Limits To: | 5.481 MI NORTH OF US 62/180 | Estimate: | $574,163 |
Length: | 5.5 Miles | Actual: | $382,350 |
Back... |
Totals for 0001-04-080 | ||
Length: | 113.2 Miles | ||
Estimate: | $7,861,886 | ||
Actual: | $2,978,305 | ||
CCSJ: 0002-03-017 | |||
District: | El Paso | Let Date: | DEC 2002 |
Highway: | SH 20 | Let Status: | Actual |
Project ID: | STP 2002(867)HES | CSJ: | 0002-03-017 |
Description: | SAFETY LIGHTING AT INTERSECTION | Handling Code: |
|
Limits From: | INTERSECTION OF SH 20 & FM 1109 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $41,028 |
Length: | 0.1 Miles | Actual: | $44,317 |
District: | El Paso | Let Date: | DEC 2002 |
Highway: | US 62 | Let Status: | Actual |
Project ID: | STP 2002(867)HES | CSJ: | 0374-02-078 |
Description: | INSTALL TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | INTERSECTION OF US 62/180 & FM 659 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $123,609 |
Length: | 0.1 Miles | Actual: | $171,903 |
District: | El Paso | Let Date: | DEC 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2001(420) | CSJ: | 0924-06-189 |
Description: | TRANSPORTATION MANAGEMENT SYSTEM, PHASE VII & X | Handling Code: |
|
Limits From: | CITY OF EL PASO | Fund Cat: | 5 |
Limits To: | . | Estimate: | $2,468,694 |
Length: | 0.6 Miles | Actual: | $1,687,600 |
District: | El Paso | Let Date: | DEC 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2002(867)HES | CSJ: | 0924-06-200 |
Description: | SAFETY LIGHTING AT INTERSECTION | Handling Code: |
|
Limits From: | INTERSECTION OF MONTWOOD & TRAWOOD | Fund Cat: | 8 |
Limits To: | . | Estimate: | $34,008 |
Length: | 0.1 Miles | Actual: | $33,574 |
District: | El Paso | Let Date: | DEC 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2002(867)HES | CSJ: | 0924-06-201 |
Description: | SAFETY LIGHTING AT INTERSECTION | Handling Code: |
|
Limits From: | INTERSECTION OF MONTWOOD & SAUL KEINFEL | Fund Cat: | 8 |
Limits To: | . | Estimate: | $31,868 |
Length: | 0.1 Miles | Actual: | $35,336 |
District: | El Paso | Let Date: | DEC 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2002(403) | CSJ: | 0924-06-206 |
Description: | TRAFFIC LIGHT SYNCHRONIZATION_ (PHASE II) | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 5 |
Limits To: | . | Estimate: | $2,181,619 |
Length: | 1.0 Miles | Actual: | $1,464,806 |
Back... |
Totals for 0002-03-017 | ||
Length: | 2.0 Miles | ||
Estimate: | $4,880,826 | ||
Actual: | $3,437,536 | ||
CCSJ: 0167-01-083 | |||
District: | El Paso | Let Date: | AUG 2003 |
Highway: | US 54 | Let Status: | Actual |
Project ID: | MG 2003(564) | CSJ: | 0167-01-083 |
Description: | CONSTRUCTION OF MAIN LANES AND INTERCHANGES | Handling Code: |
|
Limits From: | 0.90 MI S OF LP 375 (TRANSMOUNTAIN RD) | Fund Cat: | 2 |
Limits To: | 1.22 MI S OF FM 2529 (MC COMBS ST) | Estimate: | $27,783,677 |
Length: | 3.6 Miles | Actual: | $26,834,513 |
Bid Tabulations Award Status Back... |
Totals for 0167-01-083 | ||
Length: | 3.6 Miles | ||
Estimate: | $27,783,677 | ||
Actual: | $26,834,513 | ||
CCSJ: 0167-01-089 | |||
District: | El Paso | Let Date: | MAR 2003 |
Highway: | US 54 | Let Status: | Actual |
Project ID: | C 167-1-89 | CSJ: | 0167-01-089 |
Description: | UPGRADE OF VIDEO CAMERAS | Handling Code: |
|
Limits From: | PAISANO | Fund Cat: | 1 |
Limits To: | PERSHING | Estimate: | $488,782 |
Length: | 7.0 Miles | Actual: | $507,537 |
District: | El Paso | Let Date: | MAR 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 924-6-196 | CSJ: | 0924-06-196 |
Description: | INTERCONNECT UPGRADE | Handling Code: |
|
Limits From: | CITYWIDE | Fund Cat: | 1 |
Limits To: | VARIOUS LOCATIONS | Estimate: | $323,950 |
Length: | 0.1 Miles | Actual: | $300,200 |
District: | El Paso | Let Date: | MAR 2003 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 2121-2-112 | CSJ: | 2121-02-112 |
Description: | UPGRADE VIDEO CAMERAS | Handling Code: |
|
Limits From: | MESA (SH 20) | Fund Cat: | 1 |
Limits To: | PAISANO_(US 62/180) | Estimate: | $121,617 |
Length: | 13.3 Miles | Actual: | $121,077 |
District: | El Paso | Let Date: | MAR 2003 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 2121-2-113 | CSJ: | 2121-02-113 |
Description: | REPLACE EXISTING ANALOG TRANSMISSION EQUIPMENT & | Handling Code: |
|
Limits From: | MESA ST (SH 20) | Fund Cat: | 1 |
Limits To: | PAISANO DR (US 62) | Estimate: | $304,840 |
Length: | 13.3 Miles | Actual: | $283,900 |
District: | El Paso | Let Date: | MAR 2003 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 2121-3-125 | CSJ: | 2121-03-125 |
Description: | UPGRADE VIDEO CAMERAS | Handling Code: |
|
Limits From: | PAISANO (US 62/180) | Fund Cat: | 1 |
Limits To: | ZARAGOZA (LOOP 375) | Estimate: | $1,920 |
Length: | 10.3 Miles | Actual: | $6,400 |
District: | El Paso | Let Date: | MAR 2003 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 2121-3-126 | CSJ: | 2121-03-126 |
Description: | REPLACE EXISTING ANALOG TRANSMISSION EQUIPMENT & | Handling Code: |
|
Limits From: | PAISANO DR (US 62) | Fund Cat: | 1 |
Limits To: | ZARAGOSA RD (FM 659) | Estimate: | $1,920 |
Length: | 8.5 Miles | Actual: | $6,400 |
District: | El Paso | Let Date: | MAR 2003 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 2121-4-70 | CSJ: | 2121-04-070 |
Description: | REPLACE EXISTING ANALOG TRANSMISSION EQUIPMENT & | Handling Code: |
|
Limits From: | ZARAGOSA RD (FM 659) | Fund Cat: | 1 |
Limits To: | HORIZON BLVD (FM 1281) | Estimate: | $571,136 |
Length: | 5.7 Miles | Actual: | $502,636 |
Back... |
Totals for 0167-01-089 | ||
Length: | 58.2 Miles | ||
Estimate: | $1,814,165 | ||
Actual: | $1,728,150 | ||
CCSJ: 0674-01-046 | |||
District: | El Paso | Let Date: | JUL 2003 |
Highway: | FM 76 | Let Status: | Actual |
Project ID: | STP 2003(507)MM | CSJ: | 0674-01-046 |
Description: | WIDEN 4 LANE TO 6 LANE DIVIDED URBAN | Handling Code: |
|
Limits From: | 0.042 KM WEST OF HAWKINS BLVD | Fund Cat: | 7 |
Limits To: | 0.341 KM EAST OF CAROLINA DRIVE | Estimate: | $12,014,473 |
Length: | 1.4 Miles | Actual: | $10,853,746 |
Bid Tabulations Back... |
Totals for 0674-01-046 | ||
Length: | 1.4 Miles | ||
Estimate: | $12,014,473 | ||
Actual: | $10,853,746 | ||
CCSJ: 0924-00-041 | |||
District: | El Paso | Let Date: | OCT 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2003(31) | CSJ: | 0924-00-041 |
Description: | RURAL SIGN UPGRADE | Handling Code: |
|
Limits From: | DISTRICTWIDE | Fund Cat: | 11 |
Limits To: | . | Estimate: | $724,124 |
Length: | 100.0 Miles | Actual: | $620,275 |
Back... |
Totals for 0924-00-041 | ||
Length: | 100.0 Miles | ||
Estimate: | $724,124 | ||
Actual: | $620,275 | ||
CCSJ: 0924-06-141 | |||
District: | El Paso | Let Date: | MAY 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 99(614) | CSJ: | 0924-06-141 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | COURCHESNE (ANAPRA) BRIDGE | Fund Cat: | 6 |
Limits To: | OVER THE RIO GRANDE | Estimate: | $1,293,659 |
Length: | 0.1 Miles | Actual: | $1,125,867 |
Back... |
Totals for 0924-06-141 | ||
Length: | 0.1 Miles | ||
Estimate: | $1,293,659 | ||
Actual: | $1,125,867 | ||
CCSJ: 0924-06-147 | |||
District: | El Paso | Let Date: | APR 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 98(352)G | CSJ: | 0924-06-147 |
Description: | INSTALLATION OF INTERNATIONAL BRIDGE COUNTERS | Handling Code: |
|
Limits From: | INTERNATIONAL BRIDGES | Fund Cat: | 5 |
Limits To: | . | Estimate: | $1,097,277 |
Length: | 0.6 Miles | Actual: | $912,808 |
District: | El Paso | Let Date: | APR 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2002(766) | CSJ: | 0924-06-209 |
Description: | TRAFFIC MANAGEMENT SYSTEM - PHASE III, ITS EXTENSION PHASE II | Handling Code: |
|
Limits From: | ON STATE SYSTEM | Fund Cat: | 5 |
Limits To: | CITYWIDE | Estimate: | $5,873,378 |
Length: | 1.0 Miles | Actual: | $4,723,506 |
Back... |
Totals for 0924-06-147 | ||
Length: | 1.6 Miles | ||
Estimate: | $6,970,655 | ||
Actual: | $5,636,314 | ||
CCSJ: 0924-06-169 | |||
District: | El Paso | Let Date: | AUG 2003 |
Highway: | FM 258 | Let Status: | Actual |
Project ID: | C 2-14-27 | CSJ: | 0002-14-027 |
Description: | HISTORICAL ARCHITECTURAL MEDALLION MARKERS, NATIVE | Handling Code: |
|
Limits From: | CITY OF SOCORRO | Fund Cat: | 10 |
Limits To: | CITY LIMITS TO CITY LIMITS | Estimate: | $10,300 |
Length: | 4.4 Miles | Actual: | $33,500 |
District: | El Paso | Let Date: | AUG 2003 |
Highway: | US 62 | Let Status: | Actual |
Project ID: | C 374-2-75 | CSJ: | 0374-02-075 |
Description: | LANDSCAPING WORK | Handling Code: |
|
Limits From: | ON MONTANA DR; FROM TROWBRIDGE | Fund Cat: | 10 |
Limits To: | WEDGEWOOD DR | Estimate: | $237,209 |
Length: | 1.0 Miles | Actual: | $255,912 |
District: | El Paso | Let Date: | AUG 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(567)TE | CSJ: | 0924-06-169 |
Description: | KEYSTONE HERITAGE PROJECT | Handling Code: |
|
Limits From: | ADJACENT TO US 85 (DONIPHAN DR) | Fund Cat: | 9 |
Limits To: | AND BETWEEN SUNLAND PARK DR & SH20(MESA) | Estimate: | $110,172 |
Length: | 1.0 Miles | Actual: | $152,042 |
District: | El Paso | Let Date: | AUG 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2003(547)TE | CSJ: | 0924-06-218 |
Description: | MISSION TRAILS ENHANCEMENT PROJECT, PHASE III | Handling Code: |
|
Limits From: | INTERSECTION OF LOOP 375 & FM 258 | Fund Cat: | 9 |
Limits To: | . | Estimate: | $40,000 |
Length: | 0.0 Miles | Actual: | $52,000 |
District: | El Paso | Let Date: | AUG 2003 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 924-6-219 | CSJ: | 0924-06-219 |
Description: | EL PASO PRIDE PROJECT | Handling Code: |
|
Limits From: | CONCORDIA CEMETERY | Fund Cat: | 10 |
Limits To: | . | Estimate: | $149,739 |
Length: | 1.0 Miles | Actual: | $144,698 |
District: | El Paso | Let Date: | AUG 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2003(608)MM | CSJ: | 0924-06-225 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | AT FRED WILSON & ALABAMA | Fund Cat: | 7 |
Limits To: | . | Estimate: | $221,930 |
Length: | 5.2 Miles | Actual: | $231,881 |
District: | El Paso | Let Date: | AUG 2003 |
Highway: | LP 375 | Let Status: | Actual |
Project ID: | C 2552-4-32 | CSJ: | 2552-04-032 |
Description: | DECORATIVE PAINTING OF BRIDGE RAILING AND ROADWAY RAILING | Handling Code: |
|
Limits From: | LOOP 375 / ZARAGOSA BRIDGE OVERPASS | Fund Cat: | 10 |
Limits To: | . | Estimate: | $25,000 |
Length: | 0.1 Miles | Actual: | $16,000 |
Bid Tabulations Award Status Back... |
Totals for 0924-06-169 | ||
Length: | 12.7 Miles | ||
Estimate: | $794,350 | ||
Actual: | $886,033 | ||
CCSJ: 0924-06-171 | |||
District: | El Paso | Let Date: | NOV 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(947)MM | CSJ: | 0924-06-171 |
Description: | PAVE STREET / BUILD 4 - LANES UNDIVIDED | Handling Code: |
|
Limits From: | LEE BLVD;FROM MONTANA AVE | Fund Cat: | 7 |
Limits To: | PRATT AVE | Estimate: | $5,928,217 |
Length: | 1.6 Miles | Actual: | $3,059,755 |
Back... |
Totals for 0924-06-171 | ||
Length: | 1.6 Miles | ||
Estimate: | $5,928,217 | ||
Actual: | $3,059,755 | ||
CCSJ: 0924-06-180 | |||
District: | El Paso | Let Date: | JUN 2003 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2001(92)MM | CSJ: | 0924-06-180 |
Description: | WIDEN TO 4 LANES DIVIDED | Handling Code: |
|
Limits From: | 0.30 MILES NORTH OF FM 1281 | Fund Cat: | 7 |
Limits To: | 1.23 MILES SOUTH OF FM 1281 | Estimate: | $1,315,683 |
Length: | 1.5 Miles | Actual: | $1,192,005 |
District: | El Paso | Let Date: | JUN 2003 |
Highway: | FM 1281 | Let Status: | Actual |
Project ID: | STP 2002(342) | CSJ: | 3451-01-019 |
Description: | RECONSTRUCT INTERSECTION | Handling Code: |
|
Limits From: | 0.08 MILES WEST OF DARRINGTON RD | Fund Cat: | 1 |
Limits To: | 0.07 MILES EAST OF DARRINGTON RD | Estimate: | $280,185 |
Length: | 0.2 Miles | Actual: | $265,938 |
Bid Tabulations Back... |
Totals for 0924-06-180 | ||
Length: | 1.7 Miles | ||
Estimate: | $1,595,868 | ||
Actual: | $1,457,943 | ||
CCSJ: 0924-06-195 | |||
District: | El Paso | Let Date: | DEC 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2003(133) | CSJ: | 0924-06-195 |
Description: | REPLACING SMALL ROADSIDE AND STREET NAME SIGNS | Handling Code: |
|
Limits From: | COUNTYWIDE (EL PASO) | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,718,797 |
Length: | 1.0 Miles | Actual: | $1,036,898 |
Back... |
Totals for 0924-06-195 | ||
Length: | 1.0 Miles | ||
Estimate: | $1,718,797 | ||
Actual: | $1,036,898 | ||
CCSJ: 2121-04-050 | |||
District: | El Paso | Let Date: | MAR 2003 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2003(247) | CSJ: | 2121-04-050 |
Description: | CONST 2 MAIN LANE STRUCTURES OVER IH 10 | Handling Code: |
|
Limits From: | 1.245 MILES SOUTH OF IH-10 | Fund Cat: | 11 |
Limits To: | 1.931 MILES NORTH IH-10 ALONG LOOP 375 | Estimate: | $10,301,703 |
Length: | 0.9 Miles | Actual: | $14,592,778 |
District: | El Paso | Let Date: | MAR 2003 |
Highway: | LP 375 | Let Status: | Actual |
Project ID: | NH 2003(247) | CSJ: | 2552-03-040 |
Description: | CONSTRUCT INTERCHANGE | Handling Code: |
|
Limits From: | 0.15 MI N OF NORTH LOOP_DRIVE | Fund Cat: | 1 |
Limits To: | 0.44 MI N OF BOB HOPE DRIVE | Estimate: | $24,759,920 |
Length: | 2.3 Miles | Actual: | $22,473,420 |
Back... |
Totals for 2121-04-050 | ||
Length: | 3.2 Miles | ||
Estimate: | $35,061,623 | ||
Actual: | $37,066,198 | ||
CCSJ: 2552-01-029 | |||
District: | El Paso | Let Date: | JUN 2003 |
Highway: | LP 375 | Let Status: | Actual |
Project ID: | NH 2003(509) | CSJ: | 2552-01-029 |
Description: | WIDEN 2 LANE TO 4 LANE HIGHWAY | Handling Code: |
|
Limits From: | 0.23 MI W. OF IH 10 | Fund Cat: | 11 |
Limits To: | 0.39 MI E OF IH 10 | Estimate: | $11,958,162 |
Length: | 0.6 Miles | Actual: | $13,133,925 |
Bid Tabulations Back... |
Totals for 2552-01-029 | ||
Length: | 0.6 Miles | ||
Estimate: | $11,958,162 | ||
Actual: | $13,133,925 |
|
|