Detail Letting Schedule for Williamson County (FY 2020)
Bid Tabulations Dashboard
This report will no longer be updated, please access links on the Contract Letting page. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Williamson County (FY 2020) |
CCSJ: 0015-08-147 |
|||
District: | AUSTIN | Let Date: | Aug 2020 |
Highway: | IH 35 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 0015-08-147 |
Description: | RECONSTRUCT INTERCHANGE | Handling Code: | |
Limits From: | AT WILLIAMS DR | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $40,871,843 |
Length: | 0.8 | Actual | $0 |
District: | AUSTIN | Let Date: | Aug 2020 |
Highway: | IH 35 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 0015-08-144 |
Description: | ADD NEW 3-LANE NORTHBOUND FRONTAGE ROAD | Handling Code: | |
Limits From: | SOUTH OF LAKEWAY DRIVE | Fund Cat: | 2M |
Limits To: | SOUTH OF WILLIAMS DRIVE | ESTIMATE: | $18,410,036 |
Length: | 1.9 | Actual | $0 |
Back... | Totals for 0015-08-147 | ||
---|---|---|---|
Length: | 2.7 | ||
Estimate: | $59,281,879 | ||
Actual: | |||
CCSJ: 0015-08-155 |
|||
District: | AUSTIN | Let Date: | Jan 2020 |
Highway: | IH 35 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 0015-08-155 |
Description: | MILL, SEAL AND OVERLAY NORTHBOUND MAIN LANES | Handling Code: | |
Limits From: | LAKEWAY DRIVE UNDERPASS | Fund Cat: | 1 |
Limits To: | BELL COUNTY LINE | ESTIMATE: | $6,531,274 |
Length: | 13.4 | Actual | $0 |
Back... | Totals for 0015-08-155 | ||
Length: | 13.4 | ||
Estimate: | $6,531,274 | ||
Actual: | |||
CCSJ: 0015-08-408 |
|||
District: | AUSTIN | Let Date: | Oct 2019 |
Highway: | IH 35 | Let Status: | Tentative |
Project ID: | CSJ: | 0015-08-408 | |
Description: | AIR QUALITY INITIATIVE | Handling Code: | |
Limits From: | 5:07PM | Fund Cat: | 2M |
Limits To: | 5:07PM | ESTIMATE: | $1 |
Length: | 1.5 | Actual | $0 |
Back... | Totals for 0015-08-408 | ||
Length: | 1.5 | ||
Estimate: | $1 | ||
Actual: | |||
CCSJ: 0015-09-177 |
|||
District: | AUSTIN | Let Date: | Mar 2020 |
Highway: | IH 35 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 0015-09-177 |
Description: | UPGRADE BRIDGE AND APPROACH RAILING | Handling Code: | |
Limits From: | AT WEST FORK SMITH BRANCH | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $50,000 |
Length: | 0.0 | Actual | $0 |
District: | AUSTIN | Let Date: | Mar 2020 |
Highway: | IH 35 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 0015-08-139 |
Description: | UPGRADE BRIDGE AND APPROACH RAILING | Handling Code: | |
Limits From: | 2064 FT SOUTH OF SS 158 | Fund Cat: | 6 |
Limits To: | 1911 FT SOUTH OF SS_158 | ESTIMATE: | $55,000 |
Length: | 0.0 | Actual | $0 |
District: | AUSTIN | Let Date: | Mar 2020 |
Highway: | SH 95 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 0320-03-096 |
Description: | UPGRADE BRIDGE AND APPROACH RAILING | Handling Code: | |
Limits From: | 0.75 MI N OF FM 397 | Fund Cat: | 6 |
Limits To: | 0.58 MI N OF BU 79B | ESTIMATE: | $100,000 |
Length: | 2.3 | Actual | $0 |
District: | AUSTIN | Let Date: | Mar 2020 |
Highway: | SH 29 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 0337-02-046 |
Description: | UPGRADE BRIDGE AND APPROACH RAILING | Handling Code: | |
Limits From: | AT SMITH BRANCH | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $100,000 |
Length: | 0.0 | Actual | $0 |
District: | AUSTIN | Let Date: | Mar 2020 |
Highway: | SH 45 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 0683-06-033 |
Description: | UPGRADE BRIDGE AND APPROACH RAILING | Handling Code: | |
Limits From: | LOOP 1 | Fund Cat: | 6 |
Limits To: | 0.1 MI EAST OF AW GRIMES | ESTIMATE: | $156,000 |
Length: | 7.4 | Actual | $0 |
Proposal Request Back... | Totals for 0015-09-177 | ||
Length: | 9.7 | ||
Estimate: | $461,000 | ||
Actual: | |||
CCSJ: 0151-05-115 |
|||
District: | AUSTIN | Let Date: | Oct 2019 |
Highway: | US 183 | Let Status: | Tentative |
Project ID: | CC 151-5-115 | CSJ: | 0151-05-115 |
Description: | REALIGNMENT OF EXISTING US 183 TO OLD HWY 183. OLD 183 TO BE | Handling Code: | LC |
Limits From: | CEDAR PARK DR | Fund Cat: | 3 |
Limits To: | SOUTH OF BUTTERCUP CREEK BLVD | ESTIMATE: | $15,200,000 |
Length: | 0.7 | Actual | $0 |
Back... | Totals for 0151-05-115 | ||
Length: | 0.7 | ||
Estimate: | $15,200,000 | ||
Actual: | |||
CCSJ: 0151-08-010 |
|||
District: | AUSTIN | Let Date: | Aug 2020 |
Highway: | SL 332 | Let Status: | Tentative |
Project ID: | CC 151-8-10 | CSJ: | 0151-08-010 |
Description: | Construct Pedestrian Infrastructure | Handling Code: | |
Limits From: | SH 29 | Fund Cat: | 3 |
Limits To: | CR 279 | ESTIMATE: | $1,348,482 |
Length: | 1.0 | Actual | $0 |
Back... | Totals for 0151-08-010 | ||
Length: | 1 | ||
Estimate: | $1,348,482 | ||
Actual: | |||
CCSJ: 0204-02-033 |
|||
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | US 79 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0204-02-033 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | AT LIMMER LOOP | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $82,755 |
Length: | 0.2 | Actual | $0 |
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | US 290 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0113-07-073 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | AT HENLY LOOP WEST | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $77,505 |
Length: | 0.2 | Actual | $0 |
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | US 281 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0252-02-061 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | AT RM 2147 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $84,439 |
Length: | 0.2 | Actual | $0 |
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | SH 71 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0265-02-044 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | AT GREENWOOD DRIVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $92,723 |
Length: | 0.2 | Actual | $0 |
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | SH 21 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0265-04-071 |
Description: | INSTALL SAFETY LIGHTING | Handling Code: | |
Limits From: | AT UNION CHAPEL ROAD EAST | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $60,704 |
Length: | 0.4 | Actual | $0 |
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | SH 16 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0290-01-047 |
Description: | INSTALL PEDESTRIAN SIGNAL AND CROSSWALK | Handling Code: | |
Limits From: | AT SH 29 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $48,857 |
Length: | 0.2 | Actual | $0 |
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | FM 672 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0384-04-033 |
Description: | INSTALL ADVANCE WARNING SIGNALS CURVE AND CHEVRONS CURVE | Handling Code: | |
Limits From: | AT DRY CREEK ROAD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $28,863 |
Length: | 0.5 | Actual | $0 |
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | SH 21 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0471-02-078 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | AT FM 2001 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $82,260 |
Length: | 0.2 | Actual | $0 |
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | SH 21 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0473-02-040 |
Description: | INSTALL ADVANCE WARNING SIGNALS CURVE AND CHEVRONS CURVE | Handling Code: | |
Limits From: | 2.658 MILES WEST OF FM 2440 | Fund Cat: | 8 |
Limits To: | 2.273 MILES WEST OF FM 2440 | ESTIMATE: | $23,163 |
Length: | 0.4 | Actual | $0 |
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | RM 150 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 1197-01-022 |
Description: | INSTALL ADVANCE WARNING SIGNALS CURVE AND CHEVRONS CURVE | Handling Code: | |
Limits From: | 3.0 MILES WEST OF GRANDE STREET | Fund Cat: | 8 |
Limits To: | GRANDE STREET | ESTIMATE: | $25,263 |
Length: | 3.0 | Actual | $0 |
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | FM 1626 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 1539-01-019 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | AT LEISUREWOOD DRIVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $80,674 |
Length: | 0.2 | Actual | $0 |
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | FM 2001 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 1776-03-011 |
Description: | INSTALL ADVANCE WARNING SIGNALS CURVE AND CHEVRONS CURVE | Handling Code: | |
Limits From: | 0.107 MI. N. OF HIDDEN PATH RD. N | Fund Cat: | 8 |
Limits To: | 0.242 MI. S. OF HIDDEN PATH RD. S | ESTIMATE: | $32,922 |
Length: | 0.6 | Actual | $0 |
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | RM 2243 | Let Status: | Tentative |
Project ID: | CSJ: | 2103-01-037 | |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | AT ESCALERA PARKWAY | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $63,763 |
Length: | 0.2 | Actual | $0 |
Proposal Request Back... | Totals for 0204-02-033 | ||
Length: | 6.5 | ||
Estimate: | $783,892 | ||
Actual: | |||
CCSJ: 0273-04-040 |
|||
District: | AUSTIN | Let Date: | May 2020 |
Highway: | US 183 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0273-04-040 |
Description: | INSTALL CONTINUOUS TURN LANE, CONSTRUCT PAVED SHOULDERS | Handling Code: | |
Limits From: | 0.230 MI N OF LIVE OAK DR | Fund Cat: | 8 |
Limits To: | 0.230 MI S OF CR 212 | ESTIMATE: | $1,383,059 |
Length: | 0.8 | Actual | $0 |
Back... | Totals for 0273-04-040 | ||
Length: | 0.8 | ||
Estimate: | $1,383,059 | ||
Actual: | |||
CCSJ: 0337-01-043 |
|||
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | SH 29 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 0337-01-043 |
Description: | RECONSTRUCT RDWY FROM EXIST 4-LANE RDWY WITH CLTL TO 4-LANE | Handling Code: | |
Limits From: | +/- 1500 FT W OF DB WOOD | Fund Cat: | 2M |
Limits To: | +/- 2500 FT E OF DB WOOD | ESTIMATE: | $5,292,309 |
Length: | 0.5 | Actual | $0 |
Back... | Totals for 0337-01-043 | ||
Length: | 0.5 | ||
Estimate: | $5,292,309 | ||
Actual: | |||
CCSJ: 0337-02-049 |
|||
District: | AUSTIN | Let Date: | Sep 2019 |
Highway: | SH 29 | Let Status: | Tentative |
Project ID: | CC 337-2-49 | CSJ: | 0337-02-049 |
Description: | CONSTRUCT RIGHT TURN DECELERATION LANE ON EASTBOUND SH 29 | Handling Code: | LC |
Limits From: | AT CR 366 | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $235,000 |
Length: | 0.1 | Actual | $0 |
Back... | Totals for 0337-02-049 | ||
Length: | 0.1 | ||
Estimate: | $235,000 | ||
Actual: | |||
CCSJ: 0440-01-044 |
|||
District: | AUSTIN | Let Date: | Jan 2020 |
Highway: | SH 195 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 0440-01-044 |
Description: | REHABILITATE BRIDGE | Handling Code: | |
Limits From: | AT SOUTH SALADO CREEK | Fund Cat: | 6 |
Limits To: | STR# 14-246-0-0440-01-005 | ESTIMATE: | $95,000 |
Length: | 0.0 | Actual | $0 |
District: | AUSTIN | Let Date: | Jan 2020 |
Highway: | FM 1466 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 1200-04-016 |
Description: | REHABILITATE BRIDGE | Handling Code: | |
Limits From: | AT LITTLE DRY BRUSHY CREEK | Fund Cat: | 6 |
Limits To: | STR# 14-246-0-1200-04-007 | ESTIMATE: | $85,000 |
Length: | 0.0 | Actual | $0 |
District: | AUSTIN | Let Date: | Jan 2020 |
Highway: | FM 970 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 1201-01-015 |
Description: | REHABILITATE BRIDGE | Handling Code: | |
Limits From: | AT BERRY CREEK | Fund Cat: | 6 |
Limits To: | STR# 14-246-0-1201-01-015 | ESTIMATE: | $120,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0440-01-044 | ||
Length: | 0 | ||
Estimate: | $300,000 | ||
Actual: | |||
CCSJ: 0440-02-019 |
|||
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | SH 195 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0440-02-019 |
Description: | CLOSE CROSSOVER | Handling Code: | |
Limits From: | AT BERRY CREEK DR. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $827,868 |
Length: | 0.5 | Actual | $0 |
Award Status Back... | Totals for 0440-02-019 | ||
Length: | 0.5 | ||
Estimate: | $827,868 | ||
Actual: | |||
CCSJ: 0683-01-098 |
|||
District: | AUSTIN | Let Date: | Apr 2020 |
Highway: | RM 620 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 0683-01-098 |
Description: | INSTALL ITS SIGNS AND DEVICES | Handling Code: | |
Limits From: | PECAN PARK BLVD. | Fund Cat: | 2M |
Limits To: | ANDERSON MILL ROAD TRAVIS C/L | ESTIMATE: | $635,704 |
Length: | 1.5 | Actual | $0 |
Back... | Totals for 0683-01-098 | ||
Length: | 1.5 | ||
Estimate: | $635,704 | ||
Actual: | |||
CCSJ: 0683-01-099 |
|||
District: | AUSTIN | Let Date: | Jan 2020 |
Highway: | RM 620 | Let Status: | Tentative |
Project ID: | CC 683-1-99 | CSJ: | 0683-01-099 |
Description: | CONSTRUCT LEFT & RIGHT TURN LANES AND REMOVE EXISTING U-TURN | Handling Code: | |
Limits From: | 0.232 MILES EAST OF O'CONNOR DRIVE | Fund Cat: | 3 |
Limits To: | 0.568 MILES EAST OF O'CONNOR DRIVE | ESTIMATE: | $131,518 |
Length: | 0.3 | Actual | $0 |
Back... | Totals for 0683-01-099 | ||
Length: | 0.3 | ||
Estimate: | $131,518 | ||
Actual: | |||
CCSJ: 0914-05-192 |
|||
District: | AUSTIN | Let Date: | Mar 2020 |
Highway: | 183A | Let Status: | Tentative |
Project ID: | CC 914-5-192 | CSJ: | 0914-05-192 |
Description: | CONSTRUCT 4-LANE TOLLED EXPRESSWAY | Handling Code: | LC |
Limits From: | HERO WAY | Fund Cat: | 3 |
Limits To: | NORTH OF SH 29 | ESTIMATE: | 139,000,000 |
Length: | 5.6 | Actual | $0 |
Back... | Totals for 0914-05-192 | ||
Length: | 5.6 | ||
Estimate: | $139,000,000 | ||
Actual: | |||
CCSJ: 1378-02-058 |
|||
District: | AUSTIN | Let Date: | Jun 2020 |
Highway: | RM 1431 | Let Status: | Tentative |
Project ID: | CC 1378-2-58 | CSJ: | 1378-02-058 |
Description: | RIGHT TURN LANE ON WB RM 1431 AT WALTON WAY, RAILYARD DRIVE- | Handling Code: | LC |
Limits From: | DISCOVERY BLVD. | Fund Cat: | 3 |
Limits To: | WALTON WAY | ESTIMATE: | $400,000 |
Length: | 0.2 | Actual | $0 |
Back... | Totals for 1378-02-058 | ||
Length: | 0.2 | ||
Estimate: | $400,000 | ||
Actual: | |||
CCSJ: 1755-01-019 |
|||
District: | AUSTIN | Let Date: | Oct 2019 |
Highway: | RM 1869 | Let Status: | Tentative |
Project ID: | CC 1755-1-19 | CSJ: | 1755-01-019 |
Description: | ADD RIGHT TURN LANES | Handling Code: | |
Limits From: | AT SH 29 | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $294,673 |
Length: | 0.3 | Actual | $0 |
Back... | Totals for 1755-01-019 | ||
Length: | 0.3 | ||
Estimate: | $294,673 | ||
Actual: | |||
CCSJ: 2211-02-028 |
|||
District: | AUSTIN | Let Date: | Dec 2019 |
Highway: | FM 1460 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 2211-02-028 |
Description: | MILL, SEAL & OVERLAY | Handling Code: | |
Limits From: | UNIVERSITY DR. | Fund Cat: | 1 |
Limits To: | OLD SETTLERS BLVD | ESTIMATE: | $1,998,865 |
Length: | 2.2 | Actual | $0 |
Award Status Back... | Totals for 2211-02-028 | ||
Length: | 2.2 | ||
Estimate: | $1,998,865 | ||
Actual: | |||
CCSJ: 2690-01-037 |
|||
District: | AUSTIN | Let Date: | Dec 2019 |
Highway: | FM 971 | Let Status: | Tentative |
Project ID: | CC 2690-1-37 | CSJ: | 2690-01-037 |
Description: | UPGRADE TO 4-LANE URBAN SECTION | Handling Code: | |
Limits From: | SS 158 | Fund Cat: | 3 |
Limits To: | GANN STREET/RIVER HAVEN DRIVE | ESTIMATE: | $2,589,484 |
Length: | 0.3 | Actual | $0 |
Back... | Totals for 2690-01-037 | ||
Length: | 0.3 | ||
Estimate: | $2,589,484 | ||
Actual: | |||
CCSJ: 3417-02-033 |
|||
District: | AUSTIN | Let Date: | Feb 2020 |
Highway: | FM 734 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 3417-02-033 |
Description: | ITS DEPLOYMENT | Handling Code: | |
Limits From: | NORTH SH 45 | Fund Cat: | 2M |
Limits To: | TRAVIS/WILLIAMSON COUNTY LINE | ESTIMATE: | $1,791,625 |
Length: | 2.2 | Actual | $0 |
Back... | Totals for 3417-02-033 | ||
Length: | 2.2 | ||
Estimate: | $1,791,625 | ||
Actual: |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |