Item No Description Units June 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
1012 2002 TRANSPLANT PLANT MATERIAL (PALM) EA 10.000 799.16000 42.000 807.41905 2
1086 2001 DECOMPOSED GRANITE ROCK AND FILT FAB SY     12,280.000 20.00000 1
1122 2001 ROCK FILTER DAMS (INSTALL) (TY 1) LF     35.000 19.00000 1
1122 2002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     307.000 18.00000 1
1122 2003 ROCK FILTER DAMS (INSTALL) (TY 3) LF     30.000 100.00000 1
1122 2004 ROCK FILTER DAMS (INSTALL) (TY 4) LF     104.000 30.00000 1
1122 2009 ROCK FILTER DAMS (REMOVE) LF     446.000 7.19327 3
1122 2016 CONSTRUCTION EXITS (INSTALL) (TY 1) SY     312.000 12.00000 1
1122 2017 CONSTRUCTION EXITS (INSTALL) (TY 2) SY 624.000 14.00000 4,710.000 18.34180 9
1122 2019 CONSTRUCTION EXITS (REMOVE) SY 624.000 7.00000 5,022.000 7.02104 10
1122 2024 BACKHOE WORK (EROSION & SEDM CONT) HR 28.000 80.00000 220.000 73.05818 4
1122 2026 FRNT END LOADER WORK (ERSN & SEDM CONT HR     136.000 69.55059 2
1122 2037 TEMPORARY SEDIMENT CONTROL FENCE INSTL LF 600.000 5.00000 3,730.000 3.77158 7
1122 2047 BIOGRD EROSN CONT LOGS (8" DIA) INSTAL LF     2,200.000 9.18182 2
1122 2048 BIOGRD EROSN CONT LOGS (12" DIA) INSTAL LF 1,814.000 4.00000 35,244.000 4.79009 17
1122 2056 BIODEGRADBLE EROSION CONTROL LOGS REMO LF 1,814.000 2.00000 30,376.000 1.05678 16
1122 2057 TEMPORARY SEDIMENT CONTROL FENCE REMOV LF 600.000 3.50000 3,730.000 1.43328 7