AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - SAN ANTONIO DISTRICT

Last Update: Friday, January 29, 2016
ITEMS 216 6001 TO 275 6019
Items Items Bid Code Range
0100 - 0193
0216 - 0275
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0730 - 0788
1002 - 1122
2316 - 2316
3014 - 3268
4018 - 4116
5001 - 5434
6001 - 6834
7011 - 7051
8020 - 8998
216 6001 - 275 6019
Item No Description Units January 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
216 6001 PROOF ROLLING HR     110.000 47.27273 2
247 2366 FL BS (CMP IN PLC) (TY A GR 5) (FNAL POS CY     4,370.000 45.00000 1
247 6041 FL BS (CMP IN PLC) (TYA GR1 - 2) (FNAL POS CY     6,499.000 82.94000 1
247 6053 FL BS (CMP IN PLC) (TYD GR1 - 2) (FNAL POS CY     21,658.000 38.32226 2
247 6073 FL BS (CMP IN PLC) (TY D GR 1 - 2) (6") SY     266,204.000 6.53000 1
247 6366 FL BS (CMP IN PLC) (TY A GR 5) (FNAL POS CY     1,636.000 88.06626 2
247 6392 FL BS (CMP IN PLC) (TY D GR 5) (FNAL POS) CY     41,084.000 37.00000 1
247 6466 FL BS (CIP) (TY A GR 1 - 2 OR 5) FINAL PO CY     158,569.000 49.71210 2
247 6467 FL BS (CMP IN PLC) (TY D GR 1 - 2 OR 5) 6 SY 7,317.000 22.00000 123,933.000 6.94464 2
247 6475 FL BS (CIP) (TY D GR 1 - 2, OR 5) FINAL PO CY     207,227.000 47.94262 3
260 6001 LIME (HYDRATED LIME (DRY) ) TON     2,161.000 166.15761 2
260 6005 LIME (QUICKLIME (SLURRY) ) TON     204.000 175.00000 1
260 6006 LIME TRT (EXST MATL) (6") SY     45,935.000 2.00730 2
260 6027 LIME TRT (EXST MATL) (8") SY     145,143.000 3.10000 1
275 6001 CEMENT TON     10,186.300 149.68536 11
275 6002 CEMENT TREAT (EXIST MATL) (6") SY     13,509.000 3.96126 7
275 6003 CEMENT TREAT (NEW BASE) (6") SY     1,245,688.000 1.68420 6
275 6019 CEMENT TREAT (SUBGRADE) (6") SY     29,506.000 2.52808 2