Monthly State Let Construction Report For San Antonio District As Of Aug 12, 2014 Page 5 Of 5

Last Update: Tuesday, August 12, 2014
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyCOMAL
Highway FM 1101
From SH 46
To 0.5 MI N OF FM 306
CSJ 1272-01-016
Proj ID STP 2014(564)
Work Type BASE, GR, STR, SIDEWALK
 
2.797 6154722.50 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-02-14
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 354
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 1272-01-016
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04143002
Totals 6154722.50 0.00 0.00 0.0

CountyFRIO
Highway FM 1582
From SH 85
To LASALLE COUNTY LINE
CSJ 1500-01-019
Proj ID STP 1102(408)
Work Type GRAD, BASE, STRUCT, SURF, & PVT MK
 
12.870 4529432.30 0.00 4864380.12 99.9
CountyLASALLE
Highway FM 1582
From FRIO COUNTY LINE
To MCMULLEN COUNTY LINE
CSJ 1500-02-009
Proj ID STP 1102(395)
Work Type GRAD, BASE, STRUCT, SURF, & PVT MRK
 
2.181 823198.55 0.00 914878.48 99.9
CountyMCMULLEN
Highway FM 1582
From LASALLE COUNTY LINE
To SH 97
CSJ 1500-03-008
Proj ID STP 1102(408)
Work Type GRAD, BASE, STRUCT, SURF, & PAV MRK
 
1.167 503847.64 0.00 549693.20 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-11-11
Work Began 06-04-12
Work Completed  
Time Computed 00-00-00
Contract Working Days 375
Addl Days Granted 0
Working Days Charged 332
Percent Time Used 88
Contractor(s)
ANDERSON COLUMBIA CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 1500-01-019
INTERSTATE BARRICADES & MARKINGS, INC. (3.00%)
LANDS SOLUTION CONSTRUCTION(1.09%)
HIGHWAY TECHNOLOGIES, INC. (1.21%)
CABCOS CONTRACTORS LLC (1.35%)
D S TEXAS ICON CONSTRUCTION, LLC (4.25%)
HIGHWAY BARRICADES AND SERVICES, LLC (0.69%)
Contract # 07113250
Totals 5856478.49 0.00 6328951.80 99.9

CountyFRIO
Highway FM 1582
From SP 581
To SH 85
CSJ 1500-01-023
Proj ID STP 2013(717)
Work Type GRADE, BASE, SC, SURF, PAVMT MRK
 
9.939 8831027.89 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 338
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
SMC CONTRACTORS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1500-01-023
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06143245
Totals 8831027.89 0.00 0.00 0.0

CountyBEXAR
Highway PA 1502
From O'CONNER
To WETMORE
CSJ 1502-03-002
Proj ID NH 2014(625)
Work Type SURF, PAV'T MRKINGS
 
4.762 2894774.15 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-03-14
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 98
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DEAN WORD COMPANY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 1502-03-002
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04143235
Totals 2894774.15 0.00 0.00 0.0

CountyUVALDE
Highway FM 481
From AT NUECES RIVER
To .
CSJ 1590-01-021
Proj ID BR 2012(755)
Work Type GRAD, STRS, BASE & SURF
 
0.332 2663512.88 82280.00 1856911.33 71.1
Work Order 09-24-12
Work Began 05-15-13
Work Completed  
Time Computed 10-10-12
Contract Working Days 231
Addl Days Granted 21
Working Days Charged 300
Percent Time Used 119
Contractor(s)
RELMCO, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1590-01-021
W. W. FOUNDATION DRILLING, LTD.(2.16%)
FLASHER EQUIPMENT COMPANY(0.50%)
O & S TRAFFIC SUPPLIES (0.33%)
Contract # 08123039
Totals 2663512.88 82280.00 1856911.33 71.1

CountyCOMAL
Highway FM 306
From 0.5 MI NORTH OF HUNTER ROAD
To IH 35
CSJ 1728-02-037
Proj ID STP 2012(694)
Work Type GRAD, STR, BASE, SURF
 
2.046 6197894.34 59907.42 7258268.99 99.9
CountyCOMAL
Highway FM 306
From IN NEW BRAUNFELS AT UPRR CROSSING
To DOT 415536E
CSJ 1728-02-049
Proj ID STP 2012(695)RGS
Work Type CONSTRUCT RR GRADE SEPARATION STR &
 
0.500 7368312.94 196820.98 4446758.83 60.3
CountyCOMAL
Highway FM 306
From IN NEW BRAUNFELS AT UPRR CROSSING
To .
CSJ 1728-02-050
Proj ID STP 2012(695)RGS
Work Type CONSTRUCT RR GRADE SEPARATION STR &
 
0.530 9572658.52 279467.20 5162927.14 53.9
Work Order 10-24-12
Work Began 03-12-13
Work Completed  
Time Computed 04-22-13
Contract Working Days 587
Addl Days Granted 0
Working Days Charged 350
Percent Time Used 59
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 1728-02-037
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (1.91%)
ENVIRONMENTAL SAFETY SERVICES, INC.(1.10%)
GK CONSTRUCTION, LLC (0.35%)
PRIMATE CONSTRUCTION, INC. (0.05%)
THE LEVY COMPANY, L.P. (1.15%)
R K STEPHENS CONSTRUCTION, LLC (2.90%)
ROADWAY SPECIALTIES, INC.(0.18%)
SCOTT DERR PAINTING CO, LLC(0.17%)
VOGES DRILLING CO. (1.00%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(1.57%)
CATO DRILLING COMPANY(0.01%)
FLASHER EQUIPMENT COMPANY(0.88%)
Contract # 08123202
Totals 23138865.80 536195.60 16867954.96 72.8

CountyFRIO
Highway FM 462
From MOORE (STA 0+15)
To FM 472 IN BIG FOOT
CSJ 1729-01-015
Proj ID STP 2013(106)
Work Type GRAD, STR, BASE, SURF
 
8.382 4686835.06 0.00 2695372.97 57.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-15-13
Work Began 08-26-13
Work Completed  
Time Computed 00-00-00
Contract Working Days 360
Addl Days Granted 0
Working Days Charged 223
Percent Time Used 61
Contractor(s)
RAY FARIS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1729-01-015
ROADWAY SPECIALTIES, INC.(1.86%)
MURRAY CONSTRUCTION(1.11%)
FLASHER EQUIPMENT COMPANY(2.75%)
M.V. HENKE ENTERPRISES, INC. (0.73%)
RELMCO, INC. ( 12.71%)
W. W. FOUNDATION DRILLING, LTD.(0.97%)
VOGES DRILLING CO. (0.96%)
Contract # 10123218
Totals 4686835.06 0.00 2695372.97 57.5

CountyATASCOSA
Highway FM 2504
From SH 173
To 1.8 MI S OF FM 476
CSJ 1738-02-013
Proj ID C 1738-2-13
Work Type GRADE, BASE & SURF
 
7.750 3839024.80 0.00 3695217.69 97.5
CountyATASCOSA
Highway FM 2504
From 1.8 MI S OF FM 476
To FM 476
CSJ 1740-02-028
Proj ID C 1740-2-28
Work Type GRADE, BASE & SURF
 
1.841 1065719.82 0.00 1085442.28 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-01-12
Work Began 10-15-12
Work Completed  
Time Computed 00-00-00
Contract Working Days 186
Addl Days Granted 0
Working Days Charged 238
Percent Time Used 127
Contractor(s)
RAY FARIS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1738-02-013
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (0.21%)
M.V. HENKE ENTERPRISES, INC. (0.40%)
TEXAS ALTERNATIVE GRASSER, INC.(1.51%)
E-Z BEL CONSTRUCTION, LLC(0.53%)
FLASHER EQUIPMENT COMPANY(3.30%)
RICE ENVIRONMENTAL SERVICES(2.73%)
RELMCO, INC. (3.73%)
Contract # 06123204
Totals 4904744.62 0.00 4780659.97 98.4

CountyBEXAR
Highway SP 53
From EDWARD XIMENES AVENUE
To IH 10
CSJ 2230-02-004
Proj ID STP 2013(714)MM
Work Type GR, STRS, BASE, SURF, ILLUM & TRAF
 
1.532 6984125.75 0.00 0.00 0.0
CountyBEXAR
Highway SP 53
From EDWARD XIMENES AVENUE
To IH 10
CSJ 2230-02-006
Proj ID RW 2230-2-6
Work Type ROW ACQ. & UTILITIES
 
1.512 313245.19 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 534
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
SMC CONTRACTORS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 2230-02-004
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05143005
Totals 7297370.94 0.00 0.00 0.0

CountyBEXAR
Highway LP 1604
From AT SH 151
To .
CSJ 2452-01-043
Proj ID NH 2007(705)
Work Type CONSTR I / C
 
0.407 14882512.77 0.00 3956034.12 25.6
CountyBEXAR
Highway LP 1604
From AT SH 151
To .
CSJ 2452-01-048
Proj ID RW 2452-1-48
Work Type ROW UTL. ADJ.
 
0.407 244327.22 0.00 18481.21 7.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-12-12
Work Began 04-17-12
Work Completed  
Time Computed 00-00-00
Contract Working Days 382
Addl Days Granted 0
Working Days Charged 84
Percent Time Used 21
Contractor(s)
LIBERTY MUTUAL INSURANCE COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 2452-01-043
ROADWAY SPECIALTIES, INC.(0.74%)
MUNDO VERDE IRRIGATION & LANDSCAPING, INC. (0.64%)
Z & L CONCRETE CONTRACTORS, INC. (2.07%)
FUQUAY, INC. (0.22%)
FLASHER EQUIPMENT COMPANY(0.18%)
DU-MOR ENTERPRISES_INC.(1.09%)
BADECO, INC(1.35%)
BEAIRD DRILLING(0.31%)
F & W ELECTRICAL CONTRACTORS, INC. (3.18%)
AUSTIN WOOD RECYCLING(0.20%)
G.T. SIRIZZOTTI, LTD.(5.63%)
HIGHWAY TECHNOLOGIES, INC. (0.61%)
TEXAS STERLING CONSTRUCTION CO.(1.40%)
C & C ALCOSER TRUCKING (0.13%)
MUNDO VERDE IRRIGATION & LANDSCAPING, INC. (0.06%)
Contract # 01123001
Totals 15126839.99 0.00 3974515.33 25.3

CountyBEXAR
Highway LP 1604
From AT MARBACH ROAD
To .
CSJ 2452-01-051
Proj ID C 2452-1-51
Work Type GRAD, BASE, STR, SURF, PVT MRK, SIGN
 
1.281 11250793.65 1090120.79 10388872.08 93.2
Work Order 12-07-12
Work Began 01-21-13
Work Completed  
Time Computed 12-23-12
Contract Working Days 233
Addl Days Granted 39
Working Days Charged 354
Percent Time Used 130
Contractor(s)
CAPITAL EXCAVATION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 2452-01-051
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (1.40%)
ROADWAY SPECIALTIES, INC.(0.04%)
STAR OPERATIONS, INC.(2.93%)
M & M INDUSTRIAL PAINTING( 10.25%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.28%)
PRIMATE CONSTRUCTION, INC. (0.00%)
TEXAS HIGHWAY WALLS( 24.68%)
RAMMING PAVING COMPANY ( 20.52%)
VOGES DRILLING CO. (1.01%)
FLASHER EQUIPMENT COMPANY(0.92%)
C & C ALCOSER TRUCKING (0.00%)
HALL AND SONS TRANSPORT, INC.(0.00%)
ENVIRONMENTAL SAFETY SERVICES, INC.(0.01%)
S & S BRIDGE PAINTING, INC.(0.30%)
Contract # 09123005
Totals 11250793.65 1090120.79 10388872.08 93.2

CountyATASCOSA
Highway FM 2924
From FM 99
To FM 791
CSJ 2975-01-008
Proj ID STP 2013(349)
Work Type GRAD, BSE, SURF, PAVM'T MRK
 
4.136 2186637.48 0.00 2130345.41 98.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-10-13
Work Began 05-06-13
Work Completed  
Time Computed 00-00-00
Contract Working Days 214
Addl Days Granted 10
Working Days Charged 262
Percent Time Used 116
Contractor(s)
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 2975-01-008
F & W ELECTRICAL CONTRACTORS, INC._(SAN ANTONIO) (0.93%)
FUQUAY, INC. (1.03%)
FLASHER EQUIPMENT COMPANY(2.46%)
BLACKTOPPER TECHNOLOGY, INC. ( 16.22%)
Contract # 01133004
Totals 2186637.48 0.00 2130345.41 98.7

CountyBEXAR
Highway PS
From WURZBACH PARKWAY ON NEW LOCATION
To FROM JONES-MALTSBERGER TO WETMORE
CSJ 8000-15-012
Proj ID C 8000-15-12
Work Type GRAD, STRS, BASE & SURF
 
1.841 22696171.47 0.00 19796413.13 87.6
CountyBEXAR
Highway PS
From WURZBACH PARKWAY ON NEW LOCATION
To FROM JONES-MALTSBERGER TO WETMORE
CSJ 8000-15-016
Proj ID RW 8000-15-16
Work Type ROW UTL. ADJ.
 
1.841 1322268.07 0.00 1132558.26 85.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-20-10
Work Began 11-02-10
Work Completed  
Time Computed 00-00-00
Contract Working Days 791
Addl Days Granted 87
Working Days Charged 935
Percent Time Used 106
Contractor(s)
LIBERTY MUTUAL INSURANCE COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 8000-15-012
F & W ELECTRICAL CONTRACTORS, INC. (4.87%)
SOUTH TEXAS INDUSTRIAL COATINGS, L.L.C.(0.09%)
AUSTIN WOOD RECYCLING(0.37%)
ENVIRONMENTAL SAFETY SERVICES, INC.(1.37%)
LONE STAR TRAFFIC SERVICE, INC.(0.15%)
WEBBER-BALKE FOUNDATION COMPANY, INC.(1.50%)
LANDS SOLUTION CONSTRUCTION(3.08%)
BMP SPECIALIST, LLC(0.20%)
BEAIRD DRILLING(0.95%)
Z & L CONCRETE CONTRACTORS, INC. (1.88%)
HIGHWAY TECHNOLOGIES, INC. (0.65%)
SILVERDAO GROUP CONSTRUCTION, LLC(5.20%)
CP REBAR AND PT INSTALLATION (1.39%)
COLLECTIVE CONTRACTING (3.09%)
MONTELONGO"S CONCRETE(0.65%)
TEXAS STERLING CONSTRUCTION CO.( 48.96%)
GEOSOURCE, INC.(1.46%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.03%)
MUNDO VERDE IRRIGATION & LANDSCAPING, INC. (0.70%)
CERTIFIED PLACERS LLC(0.49%)
BEAIRD DRILLING(0.12%)
BMP SPECIALIST, LLC(0.56%)
HIGHWAY TECHNOLOGIES, INC. (0.62%)
F & W ELECTRICAL CONTRACTORS, INC. (4.58%)
COLLECTIVE CONTRACTING (1.57%)
K.L. DURHAM CONSTRUCTION, LLC(0.25%)
Contract # 08103001
Totals 24018439.54 0.00 20928971.39 87.5

CountyBEXAR
Highway MH
From WURZBACH PARKWAY ON NEW LOCATION
To WEST AVE TO JONES MALTSBERGER
CSJ 8000-15-015
Proj ID NH 2011(837)
Work Type GRAD, STRS, BASE & SURF
 
1.679 48594617.47 0.00 38016675.66 78.2
CountyBEXAR
Highway MH
From WURZBACH PARKWAY ON NEW LOCATION
To WEST AVE TO JONES MALTSBERGER
CSJ 8000-15-017
Proj ID RW 8000-15-17
Work Type ROW UTL. ADJ.
 
1.145 839700.13 0.00 782531.58 93.1
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-14-11
Work Began 07-06-11
Work Completed  
Time Computed 00-00-00
Contract Working Days 1,160
Addl Days Granted 0
Working Days Charged 852
Percent Time Used 73
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 8000-15-015
ID/GUERRA L.P. (5.86%)
BOSQUEZ ELECTRICAL, LLC. (3.79%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.12%)
INDUS CONSTRUCTION, L.P. (6.69%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.51%)
ROADWAY SPECIALTIES, INC.(0.64%)
CLARK CONSTRUCTION OF TEXAS, INC.(1.45%)
EGGEMEYER LAND CLEARING, LLC (0.17%)
SCOTT DERR PAINTING CO, LLC(0.00%)
BEST IN TOWN, INC. (1.49%)
INTERSTATE BARRICADES & MARKINGS, INC. (0.37%)
SAN ANTONIO TELEPHONE COMPANY INC. (0.02%)
ENVIRONMENTAL SAFETY SERVICES, INC.(1.57%)
F & W ELECTRICAL CONTRACTORS, INC. (2.66%)
RICE ENVIRONMENTAL SERVICES(1.36%)
Z & L CONCRETE CONTRACTORS, INC. (0.35%)
GUERRA UNDERGROUND, LLC(0.88%)
HEARN CO.(0.18%)
Contract # 04113004
Totals 49434317.60 0.00 38799207.24 78.4