0228-04-038 | Andrews/ Odessa |
US 385 | Actual | $675,315 | 11 | TRAFFIC SIGNALS |
1549-01-013 | Aransas/ Corpus Christi |
FM 1781 | Actual | $222,708 | 11 | INTERSECTION IMPROVEMENTS |
0271-02-050 | Austin/ Yoakum |
IH 10 | Actual | $1,582,409 | 1 | MICRO SEAL |
0914-18-056 | Bastrop/ Austin |
VA | Actual | $898,672 | 9 | CONSTRUCT PEDESTRIAN / BIKE FACILITIES |
0521-05-123 | Bexar/ San Antonio |
IH 410 | Actual | $12,499,558 | 12 | RECONSTRUCT INTERSECTION |
0915-00-091 | Bexar/ San Antonio |
VA | Actual | $708,739 | 1 | DISTRICTWIDE THERMOPLASTIC RE - STRIPING (FY2005) (CAT 10A) |
0915-00-092 | Bexar/ San Antonio |
VA | Actual | $251,139 | 1 | DISTRICTWIDE THERMOPLASTIC RE - STRIPING_ (FY 2005) (CAT 2) |
0915-00-093 | Bexar/ San Antonio |
VA | Actual | $178,753 | 1 | DISTRICTWIDE RAISED REFLECTIVE PAV MARK (FY 2005) |
0915-00-107 | Bexar/ San Antonio |
VA | Actual | $1,073,188 | 1 | DISTRICTWIDE TRAFFIC SIGNALS |
2020-02-025 | Bexar/ San Antonio |
LP 1604 | Actual | $7,974,650 | 12 | OPERATIONAL IMPROVEMEMNTS. PASSING LANES, MODIFY SH 16 |
0121-01-036 | Bosque/ Waco |
SH 22 | Actual | $1,418,773 | 1 | INTERSECTION REHABILITATION / RADIUS CAPACITY IMPROVEMENT |
0610-06-073 | Bowie/ Atlanta |
IH 30 | Actual | $963,414 | 1 | RESURFACE INTERSTATE TRAFFIC LANES |
0598-02-039 | Brazoria/ Houston |
SH 288 | Actual | $172,770 | 1 | SEAL COAT FRONTAGE ROADS |
0049-09-059 | Brazos/ Bryan |
BS 6-R | Actual | $729,544 | 1 | OVERLAY CONSISTING OF THE PLACEMENT OF MICROSURFACING AND |
0128-02-011 | Brown/ Brownwood |
FM 3064 | Actual | $2,641,281 | 11 | REHAB ROADWAY, CURB & GUTTER, AND SIDEWALK |
0151-02-016 | Burnet/ Austin |
SH 29 | Actual | $562,622 | 1 | INSTALL TRAFFIC SIGNAL & ADD LEFT TURN LANE |
0252-01-057 | Burnet/ Austin |
US 281 | Actual | $60,191 | 10 | CONSTRUCT RIGHT TURN LANE |
0914-24-007 | Burnet/ Austin |
CR | Actual | $366,951 | 6 | REPLACE BRIDGE AND APPROACHES |
0029-03-052 | Caldwell/ Austin |
US 90 | Actual | $2,364,852 | 6 | REPLACE BRIDGE AND APPROACHES |
0312-01-058 | Cooke/ Wichita Falls |
FM 51 | Actual | $1,597,598 | 11 | ADD SHOULDERS |
0823-01-025 | Cooke/ Wichita Falls |
FM 373 | Actual | $253,882 | 10 | MISCELLANEOUS WORK - LANDSCAPING, ADA RAMPS, RETAINING WALLS |
0907-16-003 | Crockett/ San Angelo |
VA | Actual | $1,133,000 | 9 | CONSTRUCT VISITOR CENTER |
0091-06-053 | Dallas/ Dallas |
SH 289 | Actual | $2,310,157 | 1 | CONCRETE PAVEMENT REPAIR |
0095-10-046 | Dallas/ Dallas |
US 80 | Actual | $5,000 | 10 | LANDSCAPE DEVELOPMENT |
0196-03-234 | Dallas/ Dallas |
IH 35E | Actual | $1,288,575 | 1 | NOVACHIP SEAL OF MAINLANES AND SHOULDERS |
0918-45-633 | Dallas/ Dallas |
CS | Actual | $19,887 | 5 | RIGHT OF WAY ACQUISITION |
0364-03-066 | Denton/ Dallas |
SH 121 | Actual | 103,412,852 | 2 | CONSTRUCT 6 LANE FREEWAY WITH 6 LANE FRONTAGE ROADS |
0918-46-092 | Denton/ Dallas |
CR | Actual | $188,867 | 6 | REPLACE BRIDGE AND APPROACHES |
0923-09-040 | Eastland/ Brownwood |
VA | Actual | $289,925 | 1 | REHABILITATE SIGNS |
0923-09-041 | Eastland/ Brownwood |
VA | Actual | $208,833 | 1 | RETROFIT RAIL AND STRUCTURAL CONCRETE REPAIR |
0005-01-097 | Ector/ Odessa |
BI 20-E | Actual | $198,613 | 11 | TRAFFIC SIGNALS |
0906-00-105 | Ector/ Odessa |
VA | Actual | $435,149 | 11 | PAVEMENT MARKINGS |
0924-06-212 | El Paso/ El Paso |
CS | Actual | $600,000 | 7 | VARIOUS PLANNING STUDIES & MPO OPERATIONS |
0924-06-224 | El Paso/ El Paso |
VA | Actual | $2,500,000 | 5 | ADVANCE TRAVEL CENTER ELECTRIFICATION |
2552-02-016 | El Paso/ El Paso |
LP 375 | Actual | $12,643,785 | 1 | REWORK & CEMENT TREAT BASE, HMAC, CPCR, SIGNING & STRIPING, |
0918-22-066 | Ellis/ Dallas |
VA | Actual | $4,999,499 | 1 | BASE REPAIR AND LEVEL - UP EXISTING ACP |
1159-02-028 | Ellis/ Dallas |
FM 879 | Actual | $141,300 | 11 | INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES |
1394-02-020 | Ellis/ Dallas |
FM 1387 | Actual | $144,254 | 11 | INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES |
0079-05-049 | Erath/ Fort Worth |
US 67 | Actual | $46,000 | 10 | INSTALL TRAFFIC SIGNAL ON WASHINGTON STREET |
0258-02-043 | Erath/ Fort Worth |
SH 6 | Actual | $929,516 | 6 | REPLACE BRIDGE |
0902-49-047 | Erath/ Fort Worth |
VA | Actual | $45,000 | ROW | ACQUISITION |
0188-02-037 | Fort Bend/ Houston |
SH 36 | Actual | $2,849,452 | 1 | ACP OVERLAY |
0912-34-118 | Fort Bend/ Houston |
VA | Actual | $3,271,573 | 1 | CONCRETE SPALL REPAIR |
0913-22-023 | Gonzales/ Yoakum |
CR | Actual | $154,753 | 6 | REPLACE BRIDGE AND APPROACHES |
0045-19-036 | Grayson/ Paris |
US 82 | Actual | $6,227,973 | 1 | ASPHALTIC CONCRETE PAVEMENT OVERLAY, BACKFILL AND PAVEMENT |
0047-18-054 | Grayson/ Paris |
US 75 | Actual | $250,108 | 1 | WIDEN EXIST ROADWAY |
2827-01-008 | Grimes/ Bryan |
FM 2 | Actual | $1,047,269 | 1 | RESTORATION OF EXISTING ROAD CONSISTING OF GRADING, |
0065-14-020 | Hardin/ Beaumont |
BU 96-F | Actual | $722,303 | 1 | MILL AND OVERLAY EXISTING ROADWAY |
0177-11-141 | Harris/ Houston |
US 59 | Actual | $1,638,641 | 1 | REHABILITATE PUMP STATION |
0271-07-258 | Harris/ Houston |
IH 10 | Actual | $413,000 | 11 | REPLACE, UPGRADE AND MAINTAIN COMPUTERS AT TRANSTAR |
0912-71-581 | Harris/ Houston |
VA | Actual | $30,000 | 1 | UPGRADE SATELLITE BUILDING SECURITY WITH TIE - IN TO DISTRICT |
0912-71-590 | Harris/ Houston |
VA | Actual | $108,000 | 1 | TIME PHASING ADAPTION FOR COMPUTERIZED TRAFFIC MANAGEMENT |
0912-71-640 | Harris/ Houston |
CS | Actual | $6,347,037 | 7 | RECONSTRUCT AND REHABILITATE 3 - LANE ROADWAY |
0912-71-853 | Harris/ Houston |
VA | Actual | $786,063 | 1 | LARGE SIGN REPLACEMENTS |
0981-01-094 | Harris/ Houston |
NASA 1 | Actual | $515,946 | 1 | ADD RIGHT - TURN LANE |
1685-03-083 | Harris/ Houston |
FM 1960 | Actual | $1,265,570 | 1 | BASE REPAIR, ULTRA THIN BONDED OVERLAY AND PAVEMENT MARKINGS |
0157-03-041 | Haskell/ Abilene |
US 277 | Actual | $3,163,552 | 11 | ACP OVERLAY & UNDERSEAL |
0285-03-038 | Hays/ Austin |
RM 12 | Actual | $1,750,758 | 11 | ADD CENTER TURN LANE AND SHOULDERS |
0164-03-035 | Henderson/ Tyler |
SH 31 | Actual | $754,273 | 1 | REHABILITATE BRIDGE JOINTS, RESURFACE ROADWAY |
0864-01-053 | Hidalgo/ Pharr |
FM 494 | Actual | $210,249 | 10 | LANDSCAPE DEVELOPMENT WITH IRRIGATION SYSTEM |
0921-02-101 | Hidalgo/ Pharr |
VA | Actual | $3,285,330 | 9 | CONSTRUCT CITY OF HIDALGO PEDESTRIAN AND BICYCLE ACCESS PROJ |
0902-51-017 | Hood/ Fort Worth |
VA | Actual | $645,775 | 10 | FEASIBILITY STUDY FOR EVACUATION ROUTES DUE TO CLOSE |
0005-06-105 | Howard/ Abilene |
IH 20 | Actual | $125,000 | 9 | RIGHT OF WAY ACQUISITION AND UTILITIES |
0200-14-065 | Jefferson/ Beaumont |
US 69 | Actual | $871,242 | 8 | INSTALL A CABLE SAFETY SYSTEM MEDIAN BARRIER AND MOW STRIP |
0451-02-023 | Kaufman/ Dallas |
SH 205 | Actual | $7,819,830 | 10 | BASE REPAIR, HOT MIX OVERLAY AND SHOULDER TEXTURING |
0157-02-023 | Knox/ Childress |
US 277 | Actual | $24,328,841 | 4 | WIDEN & RECONSTRUCT TO 4 LANE DIVIDED RURAL |
0370-01-029 | Lavaca/ Yoakum |
US 77 | Actual | $1,941,844 | 1 | ASPHALT CONCRETE PAVEMENT |
0211-02-021 | Lee/ Austin |
US 77 | Actual | $1,290,969 | 11 | REPLACE BRIDGE AND APPROACHES |
0053-01-098 | Lubbock/ Lubbock |
US 84 | Actual | $751,504 | 8 | HAZARD ELIMINATION AND SAFETY |
2933-01-005 | Lubbock/ Lubbock |
FM 2378 | Actual | $185,916 | 1 | MISCELLANEOUS CONSTRUCTION |
0604-01-038 | Matagorda/ Yoakum |
FM 2031 | Actual | $1,552,452 | 11 | RESTORE ROADWAY |
0333-01-028 | Mitchell/ Abilene |
SH 163 | Actual | $127,519 | 10 | LANDSCAPE DEVELOPMENT |
1259-02-014 | Montgomery/ Houston |
FM 1097 | Actual | $1,630,689 | 1 | REPLACE BRIDGE |
0176-01-087 | Nacogdoches/ Lufkin |
US 59 | Actual | $398,954 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS & SAFETY TREAT FIXED |
0122-02-026 | Navarro/ Dallas |
US 287 | Actual | $476,750 | 1 | REPAIR PAVEMENT STRUCTURE |
0719-01-016 | Navarro/ Dallas |
FM 633 | Actual | $143,400 | 11 | INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES |
0305-04-035 | Newton/ Beaumont |
SH 87 | Actual | $1,493,067 | 1 | OVERLAY EXISTING ROADWAY |
0305-05-036 | Newton/ Beaumont |
SH 87 | Actual | $1,703,957 | 1 | REPAIR AND OVERLAY EXISTING ROADWAY |
0101-06-096 | Nueces/ Corpus Christi |
US 181 | Actual | $7,911,000 | 10 | CLEAN AND PAINT HARBOR BRIDGE |
0916-35-046 | Nueces/ Corpus Christi |
VA | Actual | $37,698,518 | 12 | CONSTRUCT 2 - 12' TRAVEL LANES W / 10' SHLDS |
0028-11-186 | Orange/ Beaumont |
IH 10 | Actual | $852,607 | 1 | INSTALL A CABLE SAFETY SYSTEM MEDIAN BARRIER AND MOW STRIP |
2562-01-016 | Orange/ Beaumont |
FM 1442 | Actual | $1,473,007 | 1 | REPAIR AND OVERLAY EXISTING ROADWAY |
0063-02-028 | Panola/ Atlanta |
FM 1186 | Actual | $1,198,559 | 6 | REPLACE BRIDGE AND APPROACHES |
0902-38-041 | Parker/ Fort Worth |
CR | Actual | $289,781 | 6 | REPLACE BRIDGE AND APPROACHES |
0911-04-038 | Polk/ Lufkin |
CR | Actual | $354,408 | 6 | BRIDGE REPLACEMENT |
2388-01-008 | Polk/ Lufkin |
FM 2500 | Actual | $1,595,669 | 11 | WIDEN EACH SIDE, SEAL AND OVERLAY |
0904-02-025 | Potter/ Amarillo |
VA | Actual | $7,999,736 | 11 | REPLACE BRIDGE AND APPROACHES |
1015-01-020 | Rockwall/ Dallas |
FM 549 | Actual | $1,699,367 | 1 | BASE REPAIR, LEVEL UP, 12' AND 6' (WIDTH) |
0594-03-018 | Rusk/ Tyler |
FM 225 | Actual | $1,525,558 | 6 | REPLACE BRIDGE AND APPROACHES |
0911-30-015 | San Augustine/ Lufkin |
CR | Actual | $207,000 | 6 | REPLACE BRIDGE AND APPROACHES |
0914-04-174 | Travis/ Austin |
VA | Actual | $541,863 | 7 | CONST ROSS RD / PEARCE LN PEDESTRIAN WAY |
2100-01-041 | Travis/ Austin |
RM 2222 | Actual | $544,662 | 8 | CONSTRUCT PAVED SHOULDERS & ADD CTL |
8050-14-006 | Travis/ Austin |
MH | Actual | $3,813,072 | 2 | CONSTRUCT 2 - LN ROADWAY |
0920-13-019 | Tyler/ Beaumont |
CR | Actual | $408,509 | 6 | REPLACE BRIDGE AND APPROACHES |
0520-05-036 | Upshur/ Atlanta |
SH 155 | Actual | $1,996,627 | 8 | SAFETY TREAT FIXED OBJECTS |
0109-09-053 | Walker/ Bryan |
SH 19 | Actual | $73,759 | 1 | MISCELLANEOUS WORK CONSISTING OF THE INSTALLATION OF TRAFFIC |
0109-09-054 | Walker/ Bryan |
SH 19 | Actual | $7,618,755 | 11 | CONSTRUCTION OF A WIDEN NON - FREEWAY FACILITY CONSISTING OF |
2898-01-009 | Waller/ Houston |
FM 2855 | Actual | $698,222 | 1 | BASE REPAIR, PLANING, THIN BONDED PERMEABLE FRICTION COURSE |
0156-04-094 | Wichita/ Wichita Falls |
US 277 | Actual | $14,910,532 | 4 | UPGRADE TO 4 LANE DIVIDED FACILITY |
|
|