Letting Schedule for November, 2003 (FY 2004)
Letting Schedule for November, 2003 (FY 2004) | ||||
Last Update: Tuesday, August 17, 2004 |
November, 2003 (FY 2004) | (see Links) |
SEP 2003 | OCT 2003 | NOV 2003 | DEC 2003 | JAN 2004 | FEB 2004 | MAR 2004 | APR 2004 | MAY 2004 | JUN 2004 | JUL 2004 | AUG 2004 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0125-01-037 | Baylor/ Wichita Falls |
US 183 | Actual | $182,369 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS |
0915-12-360 | Bexar/ San Antonio |
CS | Actual | $4,790,545 | 7 | REHAB & WIDEN NARROW PAVEMENT (CURB, SDWK, DRAINAGE) |
0046-06-058 | Bowie/ Atlanta |
US 82 | Actual | $423,044 | 1 | UPGRADE TRAFFIC SIGNALS |
0192-03-016 | Brazoria/ Houston |
SH 6 | Actual | $1,666,209 | 1 | CLTL AND SHOULDER AND OVERLAY |
0847-02-014 | Brazoria/ Houston |
FM 521 | Actual | $748,165 | 1 | SPOT REPAIR, ACP OVERLAY AND PAVEMENT MARKINGS |
0475-02-047 | Brazos/ Bryan |
OSR | Actual | $421,029 | 1 | SEAL COAT CONSISTING OF A ONE COURSE SURFACE TREATMENT, |
1137-02-030 | Cameron/ Pharr |
LP 499 | Actual | $6,340,230 | 1 | RECONSTRUCT AND WIDEN TO 4 - LANE DIVIDED |
1140-02-031 | Cameron/ Pharr |
FM 802 | Actual | $134,843 | 10 | LANDSCAPE DEVELOPMENT WITH IRRIGATION SYSTEM |
0047-14-056 | Collin/ Dallas |
US 75 | Actual | $1,015,907 | 1 | BASE REPAIR & LEVEL UP OF FRONTAGE ROADS |
0918-24-041 | Collin/ Dallas |
VA | Actual | $509,009 | 9 | CONSTRUCT A TRAIL IN RICHARDSON |
1689-01-009 | Colorado/ Yoakum |
FM 1693 | Actual | $601,902 | 1 | REPLACE BRIDGE AND APPROACHES |
0581-01-115 | Dallas/ Dallas |
LP 12 | Actual | $314,660 | 8 | INCREASE TURNING RADIUS |
0918-00-067 | Dallas/ Dallas |
VA | Actual | $1,334,391 | 1 | UPGRADE GUARDRAIL END TREATMENTS |
0918-00-074 | Dallas/ Dallas |
VA | Actual | $705,600 | 1 | NON - SITE SPECIFIC TRAFFIC SIGNAL CONTRACT |
0918-45-495 | Dallas/ Dallas |
CS | Actual | $5,933,000 | 10 | REHABILITATE CITY STREET |
0195-03-065 | Denton/ Dallas |
IH 35 | Actual | $79,248 | 5 | INSTALL RIGHT HAND TURN LANE ON IH35 SBFR @ US 380 |
0301-01-063 | Dimmit/ Laredo |
SH 85 | Actual | $458,299 | 10 | BRIDGE REHABILITATION |
0002-02-047 | El Paso/ El Paso |
SH 20 | Actual | $963,303 | 7 | SAFETY LIGHTING |
0027-12-120 | Fort Bend/ Houston |
US 59 | Actual | $428,784 | 10 | LANDSCAPE DEVELOPMENT |
0192-01-082 | Fort Bend/ Houston |
SH 6 | Actual | $7,185,122 | 2 | CONSTRUCT GRADE SEPARATION |
0294-01-033 | Gaines/ Lubbock |
US 180 | Actual | $4,345,889 | 1 | SEAL COAT |
0367-02-070 | Galveston/ Houston |
SH 124 | Actual | $914,359 | 1 | WIDEN SHOULDERS, BASE REPAIR, SEAL COAT AND EXTEND EXISTING |
0500-01-127 | Galveston/ Houston |
IH 45 | Actual | $153,394 | 1 | REPLACE ILLUMINATION POLES |
0916-26-014 | Goliad/ Corpus Christi |
CR | Actual | $196,507 | 6 | REPLACE BRIDGE AND APPROACHES |
0055-02-021 | Hamilton/ Waco |
US 84 | Actual | $5,340,690 | 1 | SEAL COAT |
0028-01-091 | Harris/ Houston |
BU 90-U | Actual | $2,334,060 | 1 | TREAT FLEX BASE SHOULDERS AND ACP OVERLAY |
0028-02-077 | Harris/ Houston |
US 90 | Actual | $108,597 | 1 | RAISE APPROACH SLABS |
0051-02-083 | Harris/ Houston |
SH 3 | Actual | $2,492,520 | 1 | ACP OVERLAY, MILLING, AND STRIPING |
0111-01-084 | Harris/ Houston |
FM 521 | Actual | $592,932 | 1 | MICROSURFACING |
0177-11-131 | Harris/ Houston |
US 59 | Actual | $1,397,921 | 5 | INSTALL COMPUTERIZED TRAFFIC MANAGEMENT SYSTEM |
0178-01-032 | Harris/ Houston |
SH 35 | Actual | $420,427 | 1 | FULL DEPTH CONCRETE REPAIR AND JOINT / CRACK SEAL |
0271-15-074 | Harris/ Houston |
IH 610 | Actual | $21,367,859 | 1 | CONCRETE OVERLAY OF MAINLANES AND RECONSTRUCT |
0500-03-520 | Harris/ Houston |
IH 45 | Actual | $138,951 | 1 | CONSTRUCT CONCRETE RIPRAP EXTENSION AT CHANNEL, CLEAN |
0912-71-764 | Harris/ Houston |
VA | Actual | $3,955,376 | 1 | SHOULDER EDGE REPAIR AND LONGITUDINAL JOINT REPAIR, JOINT |
1685-05-084 | Harris/ Houston |
SH 6 | Actual | $251,744 | 8 | IMPROVE TRAFFIC SIGNALS |
0417-01-027 | Hemphill/ Amarillo |
SH 33 | Actual | $5,207,046 | 1 | WIDEN & REHAB ROADWAY |
0921-02-104 | Hidalgo/ Pharr |
CS | Actual | $411,393 | 10 | UPGRADE PHARR BRIDGE TOLL SYSTEM |
0130-07-029 | Hockley/ Lubbock |
US 385 | Actual | $4,498,821 | 1 | SEAL COAT |
0730-02-035 | Lamar/ Paris |
FM 195 | Actual | $1,163,539 | 1 | REPLACE BR & APPR |
0074-01-043 | Live Oak/ Corpus Christi |
IH 37 | Actual | $5,620,146 | 1 | MICRO SEAL / PFC |
0055-08-082 | McLennan/ Waco |
SP 298 | Actual | $3,319,437 | 11 | REMOVE CROSSOVERS AND RECONSTRUCT EXISTING ROADWAY_ PHASE 1 |
0909-22-110 | McLennan/ Waco |
CS | Actual | $2,843,030 | 9 | CONSTRUCT AN ALTERNATE TRANSPORTATION ROUTE LINKING THE |
0005-15-071 | Midland/ Odessa |
IH 20 | Actual | $209,928 | 10 | LANDSCAPE GCAA |
0006-01-087 | Mitchell/ Abilene |
IH 20 | Actual | $8,098,810 | 1 | SEAL COAT |
0074-06-197 | Nueces/ Corpus Christi |
IH 37 | Actual | $9,584,489 | 1 | OVERLAY |
0074-06-205 | Nueces/ Corpus Christi |
IH 37 | Actual | $3,928,021 | 1 | SEAL COAT (LOW CSJ FOR SOUTH SEAL COAT 2004 PROGRAM) |
0394-03-030 | Panola/ Atlanta |
FM 699 | Actual | $1,282,553 | 11 | REHABILITATE EXISTING 2 - LANE RURAL HIGHWAY |
0213-03-088 | Polk/ Lufkin |
US 190 | Actual | $111,729 | 1 | INSTALL TRAFFIC SIGNALS |
0042-01-027 | Potter/ Amarillo |
US 287 | Actual | $4,348,125 | 6 | REHAB EXISTING ROADWAY |
0722-02-031 | Red River/ Paris |
SH 37 | Actual | $3,513,059 | 1 | REHABILITATE EXISTING ROADWAY |
0772-03-015 | Red River/ Paris |
SH 37 | Actual | $2,272,189 | 1 | REHAB EXISTING ROAD |
0003-08-056 | Reeves/ Odessa |
BI 20-B | Actual | $7,431,562 | 1 | SEAL COAT |
0049-06-071 | Robertson/ Bryan |
SH 6 | Actual | $1,100,021 | 1 | SEAL COAT CONSISTING OF A ONE COURSE SURFACE TREATMENT AND |
0034-03-015 | Runnels/ San Angelo |
US 83 | Actual | $3,014,362 | 1 | RETRACE PAVEMENT MARKINGS |
0069-04-038 | Sterling/ San Angelo |
US 87 | Actual | $3,206,426 | 1 | RETRACE PAVEMENT MARKINGS |
0106-04-031 | Stonewall/ Abilene |
US 380 | Actual | $578,829 | 6 | REPLACE BRIDGE AND APPROACHES |
0013-10-065 | Tarrant/ Fort Worth |
BU 287P | Actual | $49,100 | 10 | INSTALL TRAFFIC SIGNAL |
0747-04-055 | Tarrant/ Fort Worth |
FM 157 | Actual | $64,921 | 1 | INSTALL TRAFFIC SIGNAL |
0902-48-533 | Tarrant/ Fort Worth |
CS | Actual | $3,078,383 | 7 | WIDEN / ADD BRIDGE ON COLLINS ST AT IH 20 TO MATCH APPROACHING |
0908-00-058 | Taylor/ Abilene |
VA | Actual | $460,275 | 1 | BRIDGE AND GUARDRAIL UPGRADE |
0914-00-186 | Travis/ Austin |
VA | Actual | $803,358 | 1 | NON - SITE SPECIFIC SIGNALS |
3136-01-096 | Travis/ Austin |
LP 1 | Actual | $2,047,703 | 2 | INSTALL CONDUIT & DETECTION AND FREEWAY TRAFFIC MGMT SYSTEM |
0022-09-045 | Val Verde/ Laredo |
US 90 | Actual | $1,142,841 | 11 | MISCELLANEOUS CONTRUCTION |
0095-06-058 | Van Zandt/ Tyler |
US 80 | Actual | $9,709,886 | 1 | SEAL COAT AND PAVEMENT MARKINGS |
0144-02-040 | Victoria/ Yoakum |
US 87 | Actual | $4,811,320 | 4 | ADD 2 LANES FOR 4 - LANE DIVIDED HIGHWAY |
0497-05-031 | Victoria/ Yoakum |
FM 616 | Actual | $2,603,286 | 1 | RESTORE ROADWAY |
0921-33-040 | Webb/ Laredo |
PW | Actual | $397,954 | 10 | RECONSTRUCT DRIVEWAYS (EAST SIDE) AND PARKING (WEST SIDE) |
0903-03-074 | Wichita/ Wichita Falls |
VA | Actual | $303,280 | 1 | REPLACE SIGNS |
0151-05-081 | Williamson/ Austin |
US 183 | Actual | $31,108,513 | 2 | CONSTRUCT TURNPIKE FACILITY WITH INTERMITTENT FRONTAGE |
1590-02-006 | Zavala/ Laredo |
FM 481 | Actual | $1,881,792 | 1 | FOR THE CONSTRUCTION AND REHABILITATION OF AN EXISTING |
|
|