Detail Letting Schedule for Navarro County (FY 2013)

Last Update: Thursday, November 14, 2013
Navarro County (FY 2013)

CCSJ: 0093-02-015

District: Dallas Let Date: AUG 2013
Highway: SH 14 Let Status: Actual
Project ID: C 93-2-15 CSJ: 0093-02-015
Description: REPLACE RAILROAD UNDERPASS Handling
Code:
 
Limits From: AT UP RR Fund Cat: 3
Limits To: SOUTH OF RICHLAND Estimate: $8,310,838
Length: 0.9 Miles Actual: $6,571,060
 
Back...

Totals for 0093-02-015
Length: 0.9 Miles
Estimate: $8,310,838
Actual: $6,571,060

CCSJ: 0162-09-035

District: Dallas Let Date: JUL 2013
Highway: FM 709 Let Status: Actual
Project ID: STP 2013(828)HES CSJ: 0162-09-035
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: WACO ST. NEAR DAWSON Fund Cat: 8
Limits To: 0.7 MILE NORTH OF FM 2555 Estimate: $5,096,501
Length: 21.4 Miles Actual: $4,787,588
 
Back...

Totals for 0162-09-035
Length: 21.4 Miles
Estimate: $5,096,501
Actual: $4,787,588

CCSJ: 0163-01-061

District: Dallas Let Date: JUN 2013
Highway: SH 31 Let Status: Actual
Project ID: STP 2013(778) CSJ: 0163-01-061
Description: FULL DEPTH CONCRETE REPAIR, LEVEL - UP AND OVERLAY Handling
Code:
 
Limits From: IH 45 Fund Cat: 1
Limits To: FM 1393 Estimate: $7,412,054
Length: 8.7 Miles Actual: $5,379,648
 
District: Dallas Let Date: JUN 2013
Highway: SH 31 Let Status: Actual
Project ID: STP 2013(778) CSJ: 0163-02-035
Description: FULL DEPTH CONCRETE REPAIR, LEVEL - UP AND OVERLAY Handling
Code:
 
Limits From: FM 1393 Fund Cat: 1
Limits To: 1.6 MILES EAST OF FM 3096 Estimate: $8,704,547
Length: 11.0 Miles Actual: $6,185,196
 
Back...

Totals for 0163-01-061
Length: 19.7 Miles
Estimate: $16,116,601
Actual: $11,564,844

CCSJ: 0166-01-047

District: Dallas Let Date: APR 2013
Highway: IH 45 Let Status: Actual
Project ID: IM 0453(133) CSJ: 0166-01-047
Description: OVERLAY FRONTAGE ROADS Handling
Code:
 
Limits From: FREESTONE COUNTY LINE Fund Cat: 1
Limits To: CR 507 Estimate: $2,530,044
Length: 3.4 Miles Actual: $2,218,765
 
Back...

Totals for 0166-01-047
Length: 3.4 Miles
Estimate: $2,530,044
Actual: $2,218,765


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract