0047-05-051 SH 5 Actual MAR 2013 $1,311,304 1 BASE REPAIR AND OVERLAY
0047-05-052 SH 5 Actual MAY 2013 $1,345,138 1 FULL DEPTH REPAIR AND OVERLAY
0091-03-024 SH 289 Actual MAR 2013 $771,988 1 BASE REPAIR, UNDERSEAL AND 2" OVERLAY
0091-05-057 SH 289 Approved JUN 2013 $4,468,391 3 CONSTRUCT DUAL LEFT TURN LANES AND RIGHT LANES AT FIVE
0281-02-069 SH 78 Actual APR 2013 $595,395 1 FULL DEPTH REPAIR
0816-04-044 FM 455 Actual MAR 2013 $12,399,737 3 WIDEN FACILITY TO 4 LANE URBAN DIVIDED, ULTIMATE 6 LANE
0816-04-048 FM 455 Actual NOV 2012 $2,971,235 1 SHOULDER WIDENING, BASE REPAIR, UNDERSEAL AND LEVEL - UP
1973-01-012 FM 1461 Actual MAR 2013 $1,313,430 1 BASE REPAIR AND LEVEL - UP
2351-01-019 FM 2478 Actual SEP 2012 $170,000 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING

Dallas County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-02-059 SH 78 Actual JAN 2013 $1,361,188 1 FDR, MILL, ACP OVERLAY AND PVMNT MARKINGS
0009-02-060 SH 78 Actual MAY 2013 $715,014 1 FULL DEPTH CONC PAVMNT REPAIR.
0009-11-228 IH 30 Actual JUN 2013 $226,790 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING,
0048-01-060 SH 342 Actual MAY 2013 $548,845 1 FULL DEPTH CONCRETE PAVEMENT REPAIR
0091-06-049 SH 289 Actual MAY 2013 $719,249 ROW NB / SB DUAL LEFT TURN LANES
0094-07-041 SH 183 Actual APR 2013 $2,164,097 1 MILL AND INLAY MAIN LANES, SHOULDERS, AND RAMPS, FULL DEPTH
0095-02-109 US 80 Actual FEB 2013 $256,468 1 REPAIR SLOPE WITH HEADWALL
0196-03-257 IH 35E Actual SEP 2012 $402,996 1 FULL DEPTH REPAIR OF SOUTHBOUND FRONTAGE ROAD
0196-03-259 IH 35E Actual OCT 2012 $1,743,691 1 FULL DEPTH REPAIR AND ACP OVERLAY OF FRONTAGE ROADS
0197-01-011 SH 352 Actual OCT 2012 $170,414 1 FULL DEPTH CONCRETE PAVEMENT REPAIR
0197-02-106 US 175 Actual JAN 2013 $2,490,573 1 FDR, ACP OVERLAY AND PAVEMENT MARKING
0261-02-072 US 67 Actual OCT 2012 $541,245 1 FULL DEPTH REPAIR CONCRETE PAVEMENT AND HMAC OVERLAY
0281-03-045 SH 78 Actual APR 2013 $739,924 1 CONCRETE FULL DEPTH REPAIR AND PAVEMENT MARKINGS
0353-04-093 SP 348 Actual SEP 2012 $114,284 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING
0442-02-152 IH 35E Actual APR 2013 $1,332,102 1 FULL DEPTH REPAIR OF MAINLANES
0581-01-134 LP 12 Actual DEC 2012 $1,070,331 1 FULL DEPTH REPAIR , MILL & ACP OVERLAY
0581-01-135 LP 12 Actual MAR 2013 $655,042 1 REPAIR SLOPE WITH RETAINING WALL
0581-01-136 LP 12 Actual JUN 2013 $114,722 1 CONCRETE FULL DEPTH REPAIR & PVMT MKGS
0581-02-134 LP 12 Actual DEC 2012 $1,270,329 1 INSTALL HIGH MAST ILLUMINATION
0918-00-162 VA Actual MAR 2013 $336,140 1 NON - SITE SPECIFIC INSTALLATION OF GUIDE SIGNS (ON - SYSTEM)
0918-00-165 VA Actual MAR 2013 $300,000 1 UPGRADE AND REPAIR ITS EQUIPMENT
0918-00-186 VA Actual APR 2013 $1,598,000 1 NON - SITE SPECIFIC SIGNAL CONTRACT ON NEW LOCATIONS
0918-00-200 VA Actual APR 2013 $278,458 1 UPGRADE VIDEO DETECTION FOR HIGH SPEED APPROACHES
0918-00-204 VA Actual JUN 2013 $1,250,000 5 REGIONAL EMISSIONS REDUCTION PROGRAM IMPLEMENTATION
0918-00-223 VA Actual DEC 2012 $3,000,000 7 PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY
0918-00-230 VA Actual JAN 2013 $1,250,000 5 FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2013 FUNDING;
0918-45-843 CS Actual MAR 2013 $917,943 3 STREET CLOSURES AT MACON & SUNDAY STREETS; INSTALL FENCING
0918-45-844 CS Actual DEC 2012 $7,719,832 7 WIDEN 2 TO 4 LANE DIV (ULTIMATE 6) WITH GRADE SEPARATION AND
0918-45-897 CS Actual OCT 2012 $3,147,651 3 LAKERIDGE PKWY IMPROVEMENTS IN CITY OF CEDAR HILL INCL.
0918-47-083 VA Actual MAY 2013 $3,502,294 7 LIGHT RAIL BED, TRACK, VEHICLES, OVERHEADS, AND FACILITIES
1047-03-064 FM 1382 Actual SEP 2012 $407,131 1 FULL DEPTH REPAIR AND PAVEMENT MARKINGS
1068-04-116 IH 30 Actual MAR 2013 715,273,351 10 WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV /
1068-04-153 IH 30 Actual OCT 2012 $2,655,000 3 RELOCATE EXISTING EASTBOUND EXIT RAMP & CONSTRUCT TWO LANE
2374-01-170 IH 635 Actual APR 2013 $417,260 1 FULL DEPTH CONCRETE PAVEMENT REPAIR

Denton County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0081-03-052 US 377 Actual NOV 2012 $4,479,767 1 BASE REPAIR AND OVERLAY
0081-13-052 IH 35W Actual APR 2013 $1,297,695 1 INSTALL PAVEMENT MARKINGS
0134-09-034 US 380 Actual NOV 2012 $15,088,446 12 RECONSTRUCT AND WIDEN FROM FOUR LANES DIVIDED TO SIX LANES
0195-02-067 IH 35 Actual OCT 2012 $10,957,189 1 SEAL COAT, PVMT MKGS, & MAILBOXES ON FRONTAGE ROADS;
0196-02-122 IH 35E Actual FEB 2013 $158,400 1 INSTALL SAFETY LIGHTING
0364-03-095 SH 121 Approved MAY 2013 $21,491,450 3 CONSTRUCT GRADE SEPARATION OVER MAINLANES; ADJUST RAMPS;
0918-46-263 VA Actual FEB 2013 $1,930,244 10 SEGMENTS 4 & 5 CURB RAMP IMPROVEMENT FOR ADA UPGRADES
1311-01-034 FM 1171 Actual MAR 2013 $45,721,253 3 WIDEN TWO LANE RURAL TO SIX LANE DIVIDED URBAN HIGHWAY
1567-01-035 FM 720 Actual MAY 2013 $524,001 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING
2054-02-016 FM 2181 Actual MAY 2013 $23,602,199 ROW WIDEN 2 LANE RURAL ROADWAY TO 6 LANES DIVIDED URBAN

Ellis County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0048-03-080 US 77 Actual APR 2013 $1,755,232 1 INSTALL RAISED MEDIAN
0048-04-083 IH 35E Actual OCT 2012 $7,458,515 1 REHABILITATE EXISTING SB AND NB FRONTAGE ROADS
0092-05-049 IH 45 Actual APR 2013 $439,634 1 IH 45 TRUCK LANE RESTRICTIONS EXPANSION (FY 2013)
0596-02-041 FM 66 Actual MAR 2013 $2,429,911 1 BASE REPAIR, HMAC OVERLAY, OVERFLOW SLAB RECONSTRUCTION
0815-08-027 FM 663 Actual MAR 2013 $4,728,944 3 WIDEN EXISTING OVERPASS AND APPROACHES
0918-22-142 CS Actual MAR 2013 $804,599 6 REPLACE BRIDGE AND APPROACHES
1394-02-023 FM 1387 Actual APR 2013 $4,091,255 3 REALIGN EXISTING HIGHWAY IN CITY OF MIDLOTHIAN

Kaufman County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0095-03-086 US 80 Actual FEB 2013 $247,839 1 REHABILITATION OF TRAFFIC SIGNALS
0095-05-056 US 80 Actual MAY 2013 $184,862 1 REHABILITATION OF TRAFFIC SIGNALS
0173-05-032 SH 34 Actual MAY 2013 $1,979,271 1 REHABILITATION OF EXISTING ROAD
0495-01-056 SP 557 Actual JAN 2013 $3,520,884 3 CONSTRUCT ACCESS RAMPS
0642-05-023 FM 986 Actual JUN 2013 $3,869,443 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0918-11-075 CS Actual MAY 2013 $609,932 3 CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS AND INSTALL SCHOOL
1091-01-015 FM 740 Actual JAN 2013 $5,785,172 3 WIDEN 2 TO 4 LANES UNDIVIDED
1091-01-019 FM 740 Actual APR 2013 $5,599,999 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1092-01-018 FM 741 Actual MAR 2013 $298,103 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING

Navarro County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0163-01-061 SH 31 Actual JUN 2013 $11,564,844 1 FULL DEPTH CONCRETE REPAIR, LEVEL - UP AND OVERLAY
0166-01-047 IH 45 Actual APR 2013 $2,218,765 1 OVERLAY FRONTAGE ROADS