Letting Schedule for Paris District (FY 2019)

Last Update: Monday, September 16, 2019

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Paris District (FY 2019)
Delta | Fannin | Franklin | Grayson | Hopkins | Hunt | Lamar | Red River |

Delta County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0136-03-065SH 24ActualJul 2019$1,494,0111HAZARD ELIMINATION & SAFETY6.5

Fannin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0510-04-013FM 898ActualJan 2019$15,429,8791REHABILITATION OF EXISTING ROAD6.5
2139-03-021SH 11ActualNov 2018$3,494,6041OVERLAY0.0
2874-01-006FM 2815ActualAug 2019$2,879,2891REHABILITATE EXISTING ROADWAY0.0
0045-05-048SH 56ActualFeb 2019$230,4598IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS0.0
0279-02-040SH 78ActualMay 2019$6,922,2476BRIDGE REPLACEMENT0.0
0901-32-085CRActualJul 2019$1,383,8796BRIDGE REPLACEMENT3.0
0174-04-033FM 100ActualMay 2019$1,465,3748HAZARD ELIMINATION & SAFETY0.0

Franklin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1380-01-018FM 1448ActualAug 2019$830,5651HAZARD ELIMINATION & SAFETY6.5

Grayson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0081-10-040US 377ActualNov 2018$30,066,7556BRIDGE REPLACEMENT0.0
0045-03-050SH 56ActualJan 2019$30,0153SH 56 AND RUSK STREET PEDESTRIAN CURB RAMP IMPROVEMENT0.0
0047-03-089US 75ActualOct 2018$2,069,5203REVERSE EXISTING RAMP CONFIGURATION0.0
0045-03-051SH 56ActualJun 2019$1,045,2131TRAFFIC SIGNAL IMPROVEMENTS0.0
0047-02-147SH 91ActualMay 2019$236,5538HAZARD ELIMINATION & SAFETY0.0
0047-18-086US 75ActualApr 2019$4,493,6252URAMP LOCATION IMPROVEMENT4.5
0901-19-179CRActualJul 2019$1,159,2026BRIDGE REPLACEMENT0.0
0729-01-039FM 121ActualJul 2019$12,158,0091WIDEN ROAD - ADD LANES6.0
0901-19-180CRActualJun 2019$480,1426BRIDGE REPLACEMENT0.0
0045-18-038US 82ActualApr 2019$7,670,6851MILL & INLAY0.0
0047-18-081US 75ActualMar 2019$1,838,6531REPAIR SLOPE FAILURE AND ROADWAY4.0
0901-19-192VAActualJan 2019$1,567,2711FY 2019 CONCRETE PAVEMENT PROJECTS ON US 750.0
0047-03-084SH 5ActualApr 2019$682,6223CONSTRUCT SHARED USE PATH0.0

Hopkins County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0400-02-053SH 19ActualFeb 2019$780,38711CREATING A LEFT TURN LANE AND CONTINUES TURN LANE FOR4.0
0009-09-106IH 30ActualJun 2019$4,268,1221HAZARD ELIMINATION & SAFETY0.0
0083-02-051SH 11ActualSep 2018$5,002,0411REHAB WITH SHOULDERS6.5

Hunt County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0009-06-051SH 66ActualFeb 2019$2,329,8381SFTY TREAT FIXED OBJ, WIDEN PVD SHLD TO 5FT OR LESS, INSTALL5.0
0009-08-031SH 24ActualDec 2018$9,081,9561SEAL COAT0.0
0009-13-171IH 30ActualMay 2019$554,9611HAZARD ELIMINATION & SAFETY0.0

Lamar County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0045-09-101US 82ActualMay 2019$1,205,6338HAZARD ELIMINATION & SAFETY0.0
0136-07-050BU 271BActualJan 2019$1,791,5061MILL AND OVERLAY0.0
0435-01-079FM 137ActualMay 2019$1,016,74211BRIDGE REPLACEMENT4.0
1690-01-120US 271ActualMay 2019$290,2748HAZARD ELIMINATION & SAFETY0.0
0901-00-055VAActualJan 2019$2,460,2321REPLACE CHEVRONS AND CURVE SIGNS0.0
0901-29-081CRActualAug 2019$779,3296BRIDGE REPLACEMENT0.0

Red River County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0046-01-064US 82ActualApr 2019$12,724,8751CONSTRUCT SUPER 24.5
0901-27-045CRActualJun 2019$733,8816BRIDGE REPLACEMENT0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract