Letting Schedule for Paris District (FY 2019)

Last Update: Monday, July 16, 2018
Paris District (FY 2019)
Fannin | Franklin | Grayson | Hopkins | Hunt | Lamar | Red River |

Fannin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0174-04-033FM 100TentativeMay 2019$1,483,8708TEXTURIZE SHOULDERS, PROFILE PAVEMENT MARKERS0.0
2139-03-021SH 11ApprovedNov 2018$3,362,9751OVERLAY0.0
0901-32-090CRTentativeJul 2019$241,3206REPLACE BRIDGE AND APPROACHES0.0
0901-32-087CRTentativeJul 2019$713,4406BRIDGE REPLACEMENT0.0
0901-32-089CRTentativeJul 2019$405,0006BRIDGE REPLACEMENT0.0
0045-05-048SH 56TentativeFeb 2019$228,7668IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS0.0

Franklin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1380-01-018FM 1448TentativeAug 2019$702,8938IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED0.0
1176-01-013SS 423TentativeDec 2018$250,0008INSTALL LIGHTS AND GATES0.0

Grayson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0901-19-193VATentativeJun 2019$999,906312-FOOT WIDE SHARED USE PATH ON AN ABANDONED UNION PACIFIC0.0
0081-10-040US 377TentativeOct 2018$30,066,7556BRIDGE REPLACEMENT0.0
2455-01-031FM 1417TentativeAug 2019$24,842,9591WIDEN FROM 2-LN TO 4-LN WITH A CONTINUOUS LEFT TURN LANE0.0
0047-03-089US 75ApprovedOct 2018$2,000,0003REVERSE EXISTING RAMP CONFIGURATION0.0
0901-19-192VATentativeJan 2019$1,500,0001FY 2019 CONCRETE PAVEMENT PROJECTS ON US 750.0
0729-01-039FM 121TentativeJul 2019$11,053,0251WIDEN FROM A 2-LANE TO A 4-LANE WITH A CONTINUOUS LEFT TURN0.0
0047-02-139SS 503TentativeMay 2019$474,4178MILLED EDGELINE RUMBLE STRIPS, MILLED CENTERLINE RUMBLE0.0
0047-02-147SH 91TentativeMay 2019$780,3848IMPROVE TRAFFIC SIGNALS0.0
0045-03-051SH 56TentativeJun 2019$1,341,7388IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS0.0
0901-19-194VATentativeJun 2019$1,332,67936-FOOT AND 10-FOOT SIDEWALK AND ADA RAMP CONSTRUCTION0.0
0045-18-038US 82TentativeApr 2019$8,000,0001MILL & INLAY0.0
0047-18-081US 75TentativeMar 2019$1,250,0001REPAIR SLOPE FAILURE AND ROADWAY0.0
0047-18-086US 75TentativeAug 2019$03RAMP LOCATION IMPROVEMENT0.0

Hopkins County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0083-02-051SH 11ApprovedSep 2018$4,822,8271REHAB WITH SHOULDERS0.0

Hunt County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0009-08-031SH 24TentativeDec 2018$9,574,6721SEAL COAT0.0
0901-22-114VATentativeAug 2019$1,200,0007UPDATE HUNT CO TRANS PLAN TO ID IMPROVEMENTS TO IH 30, SH 660.0
0009-13-171IH 30TentativeMay 2019$328,4768IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0009-06-051SH 66TentativeMay 2019$1,987,3678SFTY TREAT FIXED OBJ, WIDEN PVD SHLD TO 5FT OR LESS, INSTALL0.0

Lamar County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0901-29-081CRTentativeAug 2019$441,6006BRIDGE REPLACEMENT0.0
0901-29-090VATentativeAug 2019$1,304,000310-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDOR0.0
1690-01-120US 271TentativeMay 2019$140,8018CLOSE CROSSOVER, ADD LEFT TURN LANE0.0
0901-00-055VATentativeDec 2018$2,900,0001REPLACE CHEVRONS AND CURVE SIGNS0.0
0136-07-050BU 271BTentativeMar 2019$2,333,4531MILL AND OVERLAY0.0
0045-09-101US 82TentativeMay 2019$1,178,4888IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0

Red River County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0901-27-053VATentativeJul 2019$1,027,689310-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDOR0.0
0046-01-064US 82TentativeApr 2019$11,500,0001CONSTRUCT SUPER 20.0
0901-27-052VATentativeJul 2019$570,812310-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDOR0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract