Detail Letting Schedule for Maverick County (FY 2001)

Texas Department of Transportation Logo (Registered Trademark)
 
 
Last Update: Friday, August 31, 2001
 
Updated from Design & Construction Information System (DCIS) on: August 31, 2001
Maverick County (FY 2001)

CCSJ: 0299-13-014

District: Laredo Let Date: MAY 2001
Highway: SP 240 Let Status: Actual
Project ID: CSR 276-6-8 CSJ: 0276-06-008
Description: RECONSTRUCT ROADWAY Handling
Code:
 
Limits From: US 57 Fund Cat: 14
Limits To: FM 1021 Estimate: $115,507
Length: 0.1 Miles Actual: $158,255
 
District: Laredo Let Date: MAY 2001
Highway: BU 277N Let Status: Actual
Project ID: STP 2001(329)R CSJ: 0299-13-014
Description: RECONSTRUCT EXISTING ROADWAY Handling
Code:
 
Limits From: CEYLON Fund Cat: 4F
Limits To: US 57 Estimate: $2,026,759
Length: 1.6 Miles Actual: $2,230,781
 
District: Laredo Let Date: MAY 2001
Highway: BU 277N Let Status: Actual
Project ID: CD 299-13-15 CSJ: 0299-13-015
Description: RECONSTRUCT & REALIGN ROADBED TO FLATTEN OUT 90 DEGREE CURVE Handling
Code:
 
Limits From: CHURCH STREET Fund Cat: 11
Limits To: AVENUE B Estimate: $76,487
Length: 0.4 Miles Actual: $98,371
 
District: Laredo Let Date: MAY 2001
Highway: BU 277N Let Status: Actual
Project ID: C 299-13-16 CSJ: 0299-13-016
Description: INTERCONNECTION OF TRAFFIC SIGNALS Handling
Code:
 
Limits From: CEYLON STREET Fund Cat: 10A
Limits To: US 57 Estimate: $91,015
Length: 0.0 Miles Actual: $220,834
 
District: Laredo Let Date: MAY 2001
Highway: US 57 Let Status: Actual
Project ID: STP 2001(329)R CSJ: 0300-01-066
Description: RECONSTRUCT EXISTING ROADWAY Handling
Code:
 
Limits From: BUS 277 Fund Cat: 4F
Limits To: FM 3443 Estimate: $521,326
Length: 0.1 Miles Actual: $660,039
 
District: Laredo Let Date: MAY 2001
Highway: FM 1021 Let Status: Actual
Project ID: STP 2001(329)R CSJ: 1229-01-038
Description: RECONSTRUCT ROADWAY Handling
Code:
 
Limits From: US 57 Fund Cat: 4F
Limits To: WILSON STREET Estimate: $424,674
Length: 0.5 Miles Actual: $488,503
 
Back...

Totals for 0299-13-014
Length: 2.7 Miles
Estimate: $3,255,768
Actual: $3,856,783

CCSJ: 0300-01-069

District: Laredo Let Date: FEB 2001
Highway: US 83 Let Status: Actual
Project ID: CPM 37-6-68 CSJ: 0037-06-068
Description: FOR THE CONSTRUCTION OF ASPHALTIC CONCRETE OVERLAY Handling
Code:
 
Limits From: FM 1917 NORTH INTERSECTION Fund Cat: 7
Limits To: N. END OF EL MORO CREEK BRIDGE Estimate: $946,694
Length: 6.7 Miles Actual: $952,593
 
District: Laredo Let Date: FEB 2001
Highway: US 83 Let Status: Actual
Project ID: CPM 37-6-69 CSJ: 0037-06-069
Description: FOR THE CONSTRUCTION OF ASPHALTIC CONCRETE OVERLAY Handling
Code:
 
Limits From: S. END OF TOWN CREEK BRIDGE Fund Cat: 7
Limits To: FM 1557 Estimate: $132,945
Length: 0.9 Miles Actual: $135,928
 
District: Laredo Let Date: FEB 2001
Highway: US 277 Let Status: Actual
Project ID: CPM 300-1-69 CSJ: 0300-01-069
Description: FOR THE CONSTRUCTION OF ASPHALTIC CONCRETE OVERLAY Handling
Code:
 
Limits From: EAST END OF LAMPASITAS CREEK BRIDGE Fund Cat: 7
Limits To: 1.5 MI. EAST Estimate: $445,097
Length: 1.5 Miles Actual: $454,898
 
District: Laredo Let Date: FEB 2001
Highway: US 277 Let Status: Actual
Project ID: CPM 300-2-30 CSJ: 0300-02-030
Description: FOR THE CONSTRUCTION OF ASPHALTIC CONCRETE OVERLAY Handling
Code:
 
Limits From: 1.5 MI. EAST OF LAMPASITAS CREEK Fund Cat: 7
Limits To: 0.5 MI. EAST Estimate: $71,250
Length: 0.4 Miles Actual: $73,364
 
District: Laredo Let Date: FEB 2001
Highway: US 59 Let Status: Actual
Project ID: CPM 542-4-23 CSJ: 0542-04-023
Description: FOR THE CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT OVERLAY Handling
Code:
 
Limits From: SH 44 Fund Cat: 7
Limits To: 8.0 MI N OF INTERSECTION Estimate: $1,596,337
Length: 8.0 Miles Actual: $1,525,201
 
District: Laredo Let Date: FEB 2001
Highway: SH 44 Let Status: Actual
Project ID: CPM 2022-2-15 CSJ: 2022-02-015
Description: FOR THE CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT OVERLAY Handling
Code:
 
Limits From: WEBB/LA SALLE CO. LINE Fund Cat: 7
Limits To: 0.05 MI W OF BI 35-B Estimate: $259,498
Length: 2.2 Miles Actual: $265,872
 
Back...

Totals for 0300-01-069
Length: 19.7 Miles
Estimate: $3,451,821
Actual: $3,407,856

CCSJ: 0922-10-018

District: Laredo Let Date: FEB 2001
Highway: CR Let Status: Actual
Project ID: BR 2001(277)OX CSJ: 0922-10-018
Description: FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING Handling
Code:
 
Limits From: AT DRAINAGE DITCH ON MARINES RD. Fund Cat: 6B
Limits To: 0.248 MI EAST OF U.S. 277 Estimate: $122,500
Length: 0.1 Miles Actual: $109,640
 
Back...

Totals for 0922-10-018
Length: 0.1 Miles
Estimate: $122,500
Actual: $109,640

CCSJ: 1229-01-044

District: Laredo Let Date: JUL 2001
Highway: FM 1021 Let Status: Actual
Project ID: STP 2001(577)R CSJ: 1229-01-044
Description: RECONSTRUCT AND ADD CAPACITY Handling
Code:
 
Limits From: 1.939 MI S OF FM 3443 Fund Cat: 4F
Limits To: 1.045 MI S OF FM 2030 Estimate: $4,152,972
Length: 2.8 Miles Actual: $4,286,745
 
Bid Tabulations
Back...

Totals for 1229-01-044
Length: 2.8 Miles
Estimate: $4,152,972
Actual: $4,286,745

CCSJ: 1229-06-005

District: Laredo Let Date: FEB 2001
Highway: FM 2030 Let Status: Actual
Project ID: BR 2001(275) CSJ: 1229-06-005
Description: FOR CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING BRIDGE Handling
Code:
 
Limits From: AT ROSITA CREEK Fund Cat: 6A
Limits To: . Estimate: $250,670
Length: 0.1 Miles Actual: $258,064
 
Back...

Totals for 1229-06-005
Length: 0.1 Miles
Estimate: $250,670
Actual: $258,064


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract



Top...
Back...
 
Letting Schedule
 
Doing Business with TxDOT