Letting Schedule for February, 2001 (FY 2001)

Texas Department of Transportation Logo (Registered Trademark)
 
 
Last Update: Friday, August 31, 2001
 
Updated from Design & Construction Information System (DCIS) on: August 31, 2001
February, 2001 (FY 2001) (see Links)
SEP 2000 | OCT 2000 | NOV 2000 | DEC 2000 | JAN 2001 | FEB 2001 | MAR 2001 | APR 2001 | MAY 2001 | JUN 2001 | JUL 2001 | AUG 2001
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0894-01-017 Angelina/
Lufkin
SH 7 Actual $498,326 16B HOT MIX OVERLAY
0283-02-025 Archer/
Wichita Falls
SH 79 Actual $1,017,243 7 ACP OVERLAY
0915-12-274 Bexar/
San Antonio
CS Actual $790,881 4C SCHOOL SAFETY PROGRAM ON FUNCT CLASS ROADWAYS
2938-02-019 Brazoria/
Houston
FM 2917 Actual $2,755,165 14 ACP OVERLAY, WIDEN SHOULDERS, WIDEN BRIDGES AND REPLACE CMP
0039-06-034 Cameron/
Pharr
BU 83-S Actual $749,716 4A INSTALL INTERSECTION FLASHING BEACON
0039-07-185 Cameron/
Pharr
US 77 Actual $61,347,034 13B WIDEN ROAD AND STRUCTURES TO 6-LANES
3496-01-007 Clay/
Wichita Falls
FM 1954 Actual $782,515 8A REHABILITATION OF EXISTING ROAD
0047-04-019 Collin/
Dallas
SH 5 Actual $3,784,491 7 ACP OVERLAY
0047-14-049 Collin/
Dallas
US 75 Actual $7,441,610 3C CONCRETE PAVEMENT REPAIR AND ACP OVERLAY
0782-01-027 Cooke/
Wichita Falls
FM 678 Actual $34,520 4A INSTALL REFLECTIVE PAVEMENT MARKERS
0581-01-114 Dallas/
Dallas
LP 12 Actual $116,962 16S LANDSCAPE DEVELOPMENT
0918-45-302 Dallas/
Dallas
VA Actual $286,117 5 37 ON SYSTEM TRAFFIC SIGNAL UPGRADES
0918-45-360 Dallas/
Dallas
VA Actual $27,500 5 7 ON SYSTEM TRAFFIC SIGNAL UPGRADES
0918-45-361 Dallas/
Dallas
VA Actual $60,996 5 PE FOR 18 ON SYSTEM TRAFFIC SIGNAL UPGRADES
0918-45-384 Dallas/
Dallas
VA Actual $10,000 10B UPGRADE PORTABLE CHANGEABLE MESSAGE SIGN
0918-45-523 Dallas/
Dallas
VA Actual $3,522,702 5 TRANSIT VEHICLES FOR DART - ALTERNATIVE FUEL
0918-45-544 Dallas/
Dallas
VA Actual $500,000 4C ARCHITECTUAL DESIGN OF THE DALLAS AREA TMC
0918-45-545 Dallas/
Dallas
VA Actual $7,000,000 4C IMPLEMENTATION OF SYSTEM REQUIREMENTSBY A SYSTEMS INTEGRATOR
0918-45-546 Dallas/
Dallas
VA Actual $125,000 4C DEVELOPMENT OF SYSTEM REQUIREMENTS
0081-06-025 Denton/
Dallas
US 377 Actual $73,422 10A TRAFFIC SIGNAL INSTALLATION
2054-01-013 Denton/
Dallas
FM 2164 Actual $837,763 8A OVERLAY BASE REPAIR., SEAL COAT & PAV
0325-01-022 Dewitt/
Yoakum
SH 111 Actual $382,049 14 RESURFACING ROADWAY AND RECONSTRUCT C & G
0840-02-020 Dewitt/
Yoakum
FM 682 Actual $1,928,068 14 RESTORE ROADWAY
0913-00-055 Dewitt/
Yoakum
VA Actual $682,600 7 PAINT BRIDGES
0037-07-014 Dimmit/
Laredo
LP 225 Actual $1,707,392 14 RECONSTRUCT ROADWAY
0922-49-002 Dimmit/
Laredo
CR Actual $463,757 6B FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING
0042-08-049 Donley/
Childress
US 287 Actual $170,280 7 MICROSURFACE
0572-01-051 Ector/
Odessa
SP 450 Actual $249,258 4A INSTALL TRAFFIC SIGNAL
0080-01-046 Erath/
Fort Worth
US 377 Actual $1,363,233 7 ROTOMILL EXISTING PLANT MIX SEAL AND OVERLAY
0188-09-027 Fort Bend/
Houston
FM 723 Actual $3,182,299 4G RAILROAD GRADE SEPARATION AND APPROACHES
0017-16-003 Frio/
San Antonio
BI 35-D Actual $2,173,599 7 SEAL COAT & OVERLAY
0367-06-053 Galveston/
Houston
SH 87 Actual $213,585 11 PROVIDE CCTV SURVEILLANCE
0912-73-062 Galveston/
Houston
CS Actual $320,997 13D RECONSTRUCT ROADWAY
0912-73-068 Galveston/
Houston
VA Actual $500,000 5 PURCHASE 5 MID-SIZE LOW EMMISSION DIESEL TRANSIT VEHICLES
0912-73-075 Galveston/
Houston
VA Actual $486,757 14 REPLACE LIGHTING SYSTEM
0912-73-095 Galveston/
Houston
VA Actual $187,500 5 FY 2000 - ELECTRIC BUS DEMO: OPERATING ASSISTANCE FOR 2 BUSES
0978-02-045 Galveston/
Houston
FM 517 Actual $5,718,760 15 WIDEN FROM TWO LANES TO 4-LANE DIVIDED, CURB & GUTTER
1562-04-011 Grimes/
Bryan
FM 2620 Actual $230,335 7 CONSTRUCTION OF A SEAL COAT CONSISTING OF A ONE COURSE
0042-09-105 Hall/
Childress
US 287 Actual $620,851 7 MILL & IN-LAY
0043-04-061 Hardeman/
Childress
US 287 Actual $9,269,000 4B CONSTRUCT NEW SAFETY REST AREA
0050-06-058 Harris/
Houston
US 290 Actual $8,721,051 11 CONSTRUCT INTERIM GRADE SEPARATION
0178-01-028 Harris/
Houston
SH 35 Actual $650,871 11 JOINT AND CRACK SEAL FULL DEPTH PVMT REPAIR
0271-14-199 Harris/
Houston
IH 610 Actual $255,689 10A INSTALLATION OF A TRAFFIC SIGNAL AT EACH FRONTAGE ROAD
0271-17-139 Harris/
Houston
IH 610 Actual $475,986 12 INSTALL HIGH MAST LIGHTING
0912-00-196 Harris/
Houston
VA Actual $1,514,634 11 STRIPING
0912-71-585 Harris/
Houston
VA Actual $75,000 10B INVENTORY OF EXISTING COMMUNICATIONS CABLE
0912-71-729 Harris/
Houston
VA Actual $669,330 11 SMALL SIGN UPGRADE
0912-71-730 Harris/
Houston
VA Actual $1,548,459 11 STRIPING
0980-02-016 Harris/
Houston
FM 526 Actual $1,048,386 7 SPOT BASE REPAIR, ACP O /L & PAVEMENT MARKINGS
1062-04-048 Harris/
Houston
FM 2100 Actual $2,106,042 7 BASE REPAIR, MILLING, ACP OVERLAY AND PAVEMENT MARKS
1685-01-079 Harris/
Houston
FM 1960 Actual $75,000 14 INSTALLATION OF CHANGEABLE LANE ASSIGNMENT SYSTEM
0495-08-074 Harrison/
Atlanta
IH 20 Actual $3,187,242 2 REHABILITATE INTERSTATE MAINLANES AND RAMPS
0108-04-030 Henderson/
Tyler
SH 19 Actual $645,729 7 RESURFACE ROADWAY WITH ASPHALTIC CONCRETE
0861-05-016 Hidalgo/
Pharr
FM 491 Actual $3,868,326 4C RECONSTRUCT AND ADD SHOULDERS
0921-02-085 Hidalgo/
Pharr
VA Actual $534,790 15 CONSTRUCT ALTERNATE COMMERCIAL TRUCK BYPASS, ENLARGE CUSTOMS
2831-01-006 Hidalgo/
Pharr
FM 2812 Actual $2,816,515 14 RECONSTRUCT AND ADD SHOULDERS
0080-04-073 Hood/
Fort Worth
US 377 Actual $389,580 4A ADD LEFT TURN SIGNAL PHASE AND LEFT TURN LANE
0385-04-027 Hood/
Fort Worth
SH 144 Actual $8,797,269 4F WIDEN FROM 2 LANE TO 4 LANE DIVIDED
0379-01-038 Hutchinson/
Amarillo
SH 136 Actual $679,953 6A REPLACE EXISTING BRIDGE AND APPROACHES
0391-06-019 Jack/
Fort Worth
SH 148 Actual $3,214,788 14 ADDING SHOULDERS AND ESTENDING CULVERT STRUCTURES
0173-02-033 Kaufman/
Dallas
SH 34 Actual $327,925 14 HOT MIX, BASE WORK, SHOULDER WORK, AND PAVEMENT MARKINGS
0495-01-048 Kaufman/
Dallas
IH 20 Actual $359,452 2 GUIDE SIGN REFURBISHING
0751-01-032 Kaufman/
Dallas
FM 148 Actual $457,212 4A RECONSTRUCT INTERSECTION
1690-01-097 Lamar/
Paris
US 82 Actual $230,337 4A SAFETY LIGHTING
0251-04-020 Lampasas/
Brownwood
US 281 Actual $325,463 7 MICROSURFACE
0601-04-010 Liberty/
Beaumont
FM 1009 Actual $346,208 8A RESTORE EXISTING ROADWAY
1146-01-023 Liberty/
Beaumont
FM 834 Actual $598,054 8A WIDEN EXISTING LANES FROM 9' TO 12' AND ADD A 1' SHOULDER
0348-11-010 Live Oak/
Corpus Christi
FM 99 Actual $1,826,572 11 REHAB.EXIST PAVEMENT WITH CEMENT TREAT & TWO COURSE SURF TREAT
0905-06-037 Lubbock/
Lubbock
CS Actual $326,392 4B TRANSPORTATION ENHANCEMENT PROJECT
0300-01-069 Maverick/
Laredo
US 277 Actual $3,407,856 7 FOR THE CONSTRUCTION OF ASPHALTIC CONCRETE OVERLAY
0922-10-018 Maverick/
Laredo
CR Actual $109,640 6B FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING
1229-06-005 Maverick/
Laredo
FM 2030 Actual $258,064 6A FOR CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING BRIDGE
0463-02-057 Midland/
Odessa
SH 158 Actual $169,201 16S LANDSCAPE DEVELOPMENT
0013-04-015 Montague/
Wichita Falls
US 81 Actual $2,724,023 7 EXTENDING STRUCTURES AND ASPHALTIC CONCRETE PAVEMENT OVERLAY
0912-37-106 Montgomery/
Houston
CR Actual $7,927,228 4D CONSTRUCT 4 LANES DIVIDED AND PANTHER CREEK BRIDGE
0305-02-038 Newton/
Beaumont
SH 87 Actual $2,689,840 13B REHABILITATE ROADWAY, WIDEN STRUCTURES AND ADD SHOULDERS
0102-02-085 Nueces/
Corpus Christi
US 77 Actual $8,692,784 14 REHABILITATE ROADWAY
0177-01-085 Polk/
Lufkin
US 59 Actual $222,117 16B EROSION CONTROL
0911-04-031 Polk/
Lufkin
CR Actual $143,571 6B REPLACE BRIDGE AND APPROACHES
0904-00-075 Potter/
Amarillo
VA Actual $360,159 7 MISC WORK
0067-01-074 Randall/
Amarillo
US 87 Actual $1,198,369 7 OVERLAY
0738-01-048 Refugio/
Corpus Christi
FM 136 Actual $2,050,520 8A OVERLAY
3332-01-001 San Augustine/
Lufkin
FM 3229 Actual $1,429,681 8B CONSTRUCT NEW FARM TO MARKET ROAD / EXTEND FARM TO MARKET
0372-01-082 San Patricio/
Corpus Christi
US 77 Actual $191,541 6A REPLACE BRIDGE CLASS CULVERT
0123-08-009 Shelby/
Lufkin
FM 415 Actual $3,218,060 14 WIDEN EXISTING ROADWAY
0911-39-015 Shelby/
Lufkin
VA Actual $151,914 10A INSTALL COUNTY ROAD SIGNS
0008-14-097 Tarrant/
Fort Worth
IH 820 Actual $200,470 11 INSTALL CONCRETE TRAFFIC BARRIER
0008-14-099 Tarrant/
Fort Worth
IH 820 Actual $3,371,003 7 OVERLAY
0014-02-038 Tarrant/
Fort Worth
IH 35W Actual $1,452,800 2 RELOCATE EXIT RAMP
0014-15-027 Tarrant/
Fort Worth
US 287 Actual $3,285,708 7 OVERLAY_MAIN LANES
0747-03-073 Tarrant/
Fort Worth
FM 157 Actual $9,838,647 4C CONSTRUCT 6 LANE DIVIDED ROADWAY
0902-48-382 Tarrant/
Fort Worth
CS Actual $3,120,327 15 WIDEN & EXTEND MEACHAM BOULEVARD AS A 4 LANE DIVIDED SECTION
0902-48-383 Tarrant/
Fort Worth
CS Actual $633,137 6B REPLACE BRIDGE AND APPROACHES
2266-02-108 Tarrant/
Fort Worth
SH 360 Actual $253,157 5 TRAFFIC SIGNALS INSTALL NEW AND SIGNAL TIMING OPTIMIZATION
0015-13-286 Travis/
Austin
IH 35 Actual $479,056 2 MILL SHOULDERS AND RELOCATE INLETS
0914-00-165 Travis/
Austin
VA Actual $18,690 10A TRAFFIC COUNTS
0914-04-048 Travis/
Austin
VA Actual $803,500 4B MOORE'S CROSSING BRIDGE_IN AUSTIN
0914-04-159 Travis/
Austin
CS Actual $27,720 4C DESIGN & CONST SIDEWALK ON WEST SIDE
0520-05-035 Upshur/
Atlanta
SH 155 Actual $4,348,840 7 RESURFACE EXISTING 2-LANE RURAL HIGHWAY
0369-01-025 Uvalde/
San Antonio
SH 127 Actual $3,294,326 4F REHABILITATE AND WIDEN NARROW PAVEMENT AND SHOULDER
0022-04-018 Val Verde/
Laredo
US 90 Actual $3,492,843 7 FOR THE CONSTRUCTION OF SEAL COAT TYPE WORK
0109-09-051 Walker/
Bryan
SH 19 Actual $34,944 4A MISCELLANEOUS WORK CONSISTING OF THE INSTALLATION OF
0212-02-029 Walker/
Bryan
SH 30 Actual $4,746,791 15 RECONSTRUCT INTERCHANGE TO INCLUDE U-TURNS, LEFT TURN
0912-56-032 Waller/
Houston
VA Actual $924,450 11 SMALL SIGN UPGRADE
1687-01-013 Waller/
Houston
FM 1736 Actual $1,482,021 8A BASE REPAIR, WIDEN SUBGRADE, PAVE SHOULDER AND ACP OVERLAY
1405-04-016 Washington/
Bryan
FM 1155 Actual $1,298,185 14 RESTORATION CONSISTING OF GRADING, BASE, SURFACE AND
2830-02-008 Washington/
Bryan
FM 1697 Actual $1,262,046 14 RESTORATION CONSISTING OF GRADING, BASE AND SURFACE TREAT
0903-03-060 Wichita/
Wichita Falls
VA Actual $722,686 4B HOLLIDAY CREEK PEDESTRIAN AND BICYCLE TRAIL (PHASE 2)
0312-04-024 Wise/
Fort Worth
FM 730 Actual $888,140 6B REPLACE BRIDGE AND APPROACHES
0902-20-048 Wise/
Fort Worth
CR Actual $448,536 6B REPLACE BRIDGE AND APPROACHES
0878-01-009 Zavala/
Laredo
FM 393 Actual $731,494 8A FOR THE CONSTRUCTION AND REHABILITTION OF AN EXISTING


Let Status Definition
Tentative Estimated letting date for this project