SEP 2000 | OCT 2000 | NOV 2000 | DEC 2000 | JAN 2001 | FEB 2001 | MAR 2001 | APR 2001 | MAY 2001 | JUN 2001 | JUL 2001 | AUG 2001
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
1164-01-010 Angelina/
Lufkin
FM 843 Actual $2,180,538 16B IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED OB
0042-04-034 Armstrong/
Amarillo
US 287 Actual $9,799,262 4F REHAB EXISTING ROADWAY
0613-02-049 Atascosa/
San Antonio
SH 16 Actual $463,611 7 ACP OVERLAY & PAVEMENT MARKINGS
0015-04-066 Bell/
Waco
IH 35 Actual $1,719,341 2 METAL BEAM GUARD UPGRADE
0072-08-105 Bexar/
San Antonio
LP 345 Actual $202,150 16C ADD DUAL LEFT TURN LANES AT USAA ENTRANCES
0072-12-173 Bexar/
San Antonio
IH 10 Actual $101,550 2 EPOXY INJECTION IN EASTBOUND MAINLANE BRIDGE DECK
0521-05-096 Bexar/
San Antonio
IH 410 Actual $1,471,044 2 REFURBISH GUIDE SIGNS
0915-00-076 Bexar/
San Antonio
VA Actual $3,455,000 10B TRAFFIC MANAGEMENT SYSTEM REHABILITATION (2000)
0915-12-271 Bexar/
San Antonio
CS Actual $4,111,890 4C REHAB & WIDEN NARROW PAVEMENT W /CLTL (SIDEWALKS)
0050-02-083 Brazos/
Bryan
SH 6 Actual $674,819 14 MISCELLANEOUS CONSTRUCTION TO ADD A CONTINUOUS LEFT TURN
0914-22-040 Caldwell/
Austin
CR Actual $274,545 6B REPLACE BRIDGE & APPROACHES
1137-01-019 Cameron/
Pharr
FM 801 Actual $2,259,677 14 WIDEN TO 4 LANE WITH SHOULDERS
0508-02-100 Chambers/
Beaumont
IH 10 Actual $1,466,328 2 PLANE AND OVERLAY EXISTING ROADWAY
0043-01-067 Childress/
Childress
US 287 Actual $55,503 4A MILLED SHOULDERS
0470-01-013 Comal/
San Antonio
FM 1863 Actual $3,819,900 4E REHABILITATE AND WIDEN NARROW PAVEMENT AND SHOULDER
0923-17-024 Comanche/
Brownwood
CR Actual $556,509 6B REPLACE BRIDGE AND APPROACHES
0032-02-026 Cottle/
Childress
US 62 Actual $9,740,713 14 SAFETY TREAT DRAINAGE STRUCTURES & WIDEN
0918-45-576 Dallas/
Dallas
VA Actual $312,500 4C ENGINEERING AND DESIGN FOR RAIL ACCESS
0196-02-091 Denton/
Dallas
IH 35E Actual $2,880,026 2 GUIDE SIGN REFURBISHING ADD SEQUENTIAL SIGNING TO LAKE
0037-06-070 Dimmit/
Laredo
US 83 Actual $1,520,639 16B FOR THE CONSTRUCTION AND REHABILITATION OF AN EXISTING
0924-06-178 El Paso/
El Paso
CS Actual $7,624,662 5 RECONSTRUCT LEE TREVINO
2121-04-059 El Paso/
El Paso
IH 10 Actual $14,278,108 4C CONSTURCTION OF IH 10 / EASTLAKE BLVD INTERCHANGE
0172-05-066 Ellis/
Dallas
US 287 Actual $16,372,769 15 WIDEN TO 4 LANE DIVIDED RURAL
0049-03-052 Falls/
Waco
SH 6 Actual $12,887,108 3B WIDEN 2 LANE TO 4 LANE DIVIDED
0675-01-036 Freestone/
Bryan
IH 45 Actual $1,866,339 2 MISCELLANEOUS WORK CONSISTING OF SAFETY TREATING BRIDGE
0675-02-047 Freestone/
Bryan
IH 45 Actual $2,716,823 2 OVERLAY CONSISTING OF HMA OVERLAY, PAVEMENT MARKINGS AND
0913-22-012 Gonzales/
Yoakum
CR Actual $1,140,261 6B REPLACE BRIDGE AND APPROACHES
0096-04-054 Gregg/
Tyler
US 80 Actual $1,560,547 4A IMPROVE SIGNALIZATION, INSTALL CONTINUOUS TURN LANE
0138-01-089 Gregg/
Tyler
US 259 Actual $232,808 4A ADD TEXTURIZED SHOULDERS FOR SAFETY
0067-04-038 Hale/
Lubbock
IH 27 Actual $5,780,868 2 OVERLAY
0500-03-503 Harris/
Houston
IH 45 Actual $1,486,639 7 JOINT AND CRACK SEAL CONCRETE ON FRONTAGE ROADS AND CRACK
0912-00-051 Harris/
Houston
VA Actual $750,000 5 INSTALL HIGHWAY ADVISORY RADIO
0912-00-216 Harris/
Houston
VA Actual $3,250,000 5 FY 2001 CLEAN AIR ACTION TRANSIT PROGRAM
0912-00-217 Harris/
Houston
VA Actual $2,187,500 5 FY 2001 ALTERNATIVE FUEL PRGRAM
0912-00-220 Harris/
Houston
VA Actual $2,187,500 5 FY 2002 ALTERNATIVE FUEL PROGRAM
0912-71-660 Harris/
Houston
VA Actual $3,165,878 5 PROVIDE INTEGRATION FOR ONGOING HOUSTON ITS PRIORITY
0981-01-095 Harris/
Houston
NASA 1 Actual $350,000 16S LANDSCAPE DEVELOPMENT
1685-05-077 Harris/
Houston
SH 6 Actual $1,145,228 3C ULTRA THIN SURFACE WEARING COURSE
0016-02-071 Hays/
Austin
IH 35 Actual $17,743,483 1 ADD 1 MAIN LANE IN EACH DIRECTION (3RD LANE)
0766-01-018 Hopkins/
Paris
FM 69 Actual $2,356,915 8A STRUCTURES, EMBANKMENT, LIME TRT SUBGR, CEM TRT NEW BASE &
0635-03-013 Houston/
Lufkin
FM 228 Actual $366,542 6A REPLACE BRIDGE AND APPROACHES
0065-04-073 Jasper/
Beaumont
US 96 Actual $7,764,109 3A GRADE SEPARATION
0087-01-092 Jim Wells/
Corpus Christi
SH 44 Actual $596,045 3C MODERNIZATION OF EXISTING TRAFFIC SIGNALS
0925-17-004 Knox/
Childress
CR Actual $489,352 6B REPLACE BRIDGE AND APPROACHES
0018-02-047 La Salle/
Laredo
IH 35 Actual $1,352,341 16 PORTLAND CEMENT CONCRETE OVERLAY
0483-01-032 La Salle/
Laredo
SH 97 Actual $1,047,984 11 GRADING, BASE, STRUCTURES, SURFACING, PAVING MARKINGS, ETC.
0914-21-015 Lee/
Austin
CR Actual $167,861 6B REPLACE BRIDGE & APPROACHES
1023-02-041 Liberty/
Beaumont
FM 563 Actual $1,181,661 16S ADJUST IRRIGATION FLUME WHICH CROSSES HIGHWAY
0166-07-048 Madison/
Bryan
SH 75 Actual $277,102 10A MISCELLANEOUS WORK CONSISTING OF PLACING THERMOPLASTIC
0179-14-006 Matagorda/
Yoakum
BS 35-H Actual $1,080,254 4F WIDEN ROADWAY AND SAFETY END TREAT
1229-01-044 Maverick/
Laredo
FM 1021 Actual $4,286,745 4F RECONSTRUCT AND ADD CAPACITY
0015-01-178 McLennan/
Waco
IH 35 Actual $2,437,328 4A INSTALL MEDIAN BARRIER
0916-00-045 Nueces/
Corpus Christi
VA Actual $1,424,645 15 INTERGRATE EXISTING COMMUNICATIONS NETWORK WITH TXDOT, CITY
0028-15-040 Orange/
Beaumont
BU 90-Y Actual $7,676,318 4D RECONSTRUCT TO FOUR LANES WITH LEFT TURN LANE
0710-02-051 Orange/
Beaumont
FM 105 Actual $5,538,823 4F WIDEN & RECONSTRUCT TO 4 LANE UNDIVIDED RURAL
0902-39-011 Palo Pinto/
Fort Worth
CR Actual $658,371 6B REPLACE BRIDGE AND APPROACHES
0902-39-012 Palo Pinto/
Fort Worth
CR Actual $753,553 6B REPLACE BRIDGE AND APPROACHES
1222-01-013 Panola/
Atlanta
FM 10 Actual $1,449,653 6A REPLACE BRIDGE & APPROACHES ON 2-LANE RURAL HIGHWAY
2291-01-011 Parker/
Fort Worth
FM 1187 Actual $410,328 7 HOT MIX OVERLAY
2635-02-020 Randall/
Amarillo
LP 335 Actual $5,910,454 4F REHAB EXISTING ROADWAY
0009-12-066 Rockwall/
Dallas
IH 30 Actual $473,824 2 GUIDE SIGN REFURBISHING
0756-05-015 San Jacinto/
Lufkin
FM 945 Actual $1,647,900 4A SAFETY TREAT FIXED OBJECTS
0911-07-029 San Jacinto/
Lufkin
CR Actual $294,410 6B REPLACE BRIDGE AND APPROACHES
0165-01-080 Smith/
Tyler
US 271 Actual $329,601 11 CONSTRUCT RIGHT TURN LN, TRAFFIC CONTROL ISLANDS, STORM SEWER
0069-03-040 Sterling/
San Angelo
US 87 Actual $5,518,227 12 RECONSTRUCT AND UPGRADE 2-LANE HIGHWAY TO 4-LANE DIVIDED
0069-03-049 Sterling/
San Angelo
US 87 Actual $5,393,471 3B RECONSTRUCT AND UPGRADE 2-LANE HIGHWAY TO 4-LANE DIVIDED
0353-03-072 Tarrant/
Fort Worth
SH 114 Actual $16,083,330 12 RECONSTRUCT FOUR LANE DIVIDED TO FREEWAY WITH FRONTAGE ROADS
0353-03-080 Tarrant/
Fort Worth
SH 114 Actual $143,800 10A TRAFFIC SIGNALS ON FRONTAGE ROADS
0718-02-046 Tarrant/
Fort Worth
FM 156 Actual $40,496 10A TRAFFIC SIGNAL
0902-48-189 Tarrant/
Fort Worth
CS Actual $7,684,665 4C WIDEN FROM 2 TO 4 LANES
0902-48-193 Tarrant/
Fort Worth
CS Actual $8,263,586 5 WIDEN FROM 4 TO 6 LANES
0902-48-456 Tarrant/
Fort Worth
VA Actual $256,131 4C COOPERATIVE DIGITAL AERIAL PHOTOGRAPHY AND ELEVATION CONTOUR
0033-06-094 Taylor/
Abilene
US 83 Actual $1,173,396 11 CONSTRUCT DRIVEWAYS AND CONCRETE CURB AND GUTTER ON
0034-01-111 Taylor/
Abilene
US 83 Actual $3,649,129 4A PLANE EXIST PAVEMENT AND REPLACE WITH ACP
0908-33-065 Taylor/
Abilene
VA Actual $120,000 4B RIGHT-OF-WAY ACQUISITION AND RELOCATION
0077-06-066 Tom Green/
San Angelo
US 67 Actual $21,081,520 4D CONSTRUCT FREEWAY MAIN LANES (STAGE CONSTRUCTION)
0077-08-033 Tom Green/
San Angelo
LP 306 Actual $737,086 4F GRADING, BASE AND BRIDGE WIDENING
0015-13-291 Travis/
Austin
IH 35 Actual $6,617,672 2 OVERLAY MAINLAINES AND RESTRIPE TO REDUCE BOTTLENECKS
0113-08-064 Travis/
Austin
US 290 Actual $656,195 14 ADD CENTER TURN LANE
0151-09-032 Travis/
Austin
US 183 Actual $8,173,142 4C PHASE I: CONSTRUCT OVERPASS AND APPROACHES
0914-00-166 Travis/
Austin
VA Actual $840,865 10A FY 2001 NSS SIGNALS
0922-11-014 Val Verde/
Laredo
VA Actual $1,582,393 15 ITS DEPLOYMENT PLAN
0675-06-084 Walker/
Bryan
IH 45 Actual $1,430,514 2 OVERLAY CONSISTING OF A POROUS FRICTION COURSE
0681-04-028 Wichita/
Wichita Falls
FM 367 Actual $227,493 4A INSTALL REFLECTIVE PAVEMENT MARKERS
0804-04-020 Wichita/
Wichita Falls
FM 368 Actual $191,513 6A REPLACE BRIDGE AND APPROACHES
0015-09-135 Williamson/
Austin
IH 35 Actual $5,474,999 7 OV MSL & RESTRIPE TO REDUCE BOTTLENECKS


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract



Top...