Letting Schedule for Laredo District (FY 2001)

Texas Department of Transportation Logo (Registered Trademark)
 
 
Last Update: Friday, August 31, 2001
 
Updated from Design & Construction Information System (DCIS) on: August 31, 2001
Laredo District (FY 2001)
Dimmit | Duval | Kinney | La Salle | Maverick | Val Verde | Webb | Zavala

Dimmit County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0037-05-038 US 83 Actual OCT 2000 $4,879,937 14 REHABILITATE OF A NON-FREEWAY CONSISTING OF FLEXIBLE BASE
0037-06-070 US 83 Actual JUL 2001 $1,520,639 16B FOR THE CONSTRUCTION AND REHABILITATION OF AN EXISTING
0037-07-014 LP 225 Actual FEB 2001 $1,707,392 14 RECONSTRUCT ROADWAY
0922-49-002 CR Actual FEB 2001 $463,757 6B FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING

Duval County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0086-10-037 SH 359 Actual JUN 2001 $177,941 4A FOR THE CONSTRUCTION OF IMPROVING GUARDRAIL
0237-06-028 SH 44 Actual OCT 2000 $328,998 10A INTERCONNECT TRAFFIC SIGNALS

Kinney County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0922-21-003 PW Actual AUG 2001 $733,289 9 MISCELLANEOUS CONSTRUCTION CONSISTING OF PARKING AREAS,

La Salle County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0018-01-062 IH 35 Actual NOV 2000 $420,050 4B RIGHT OF WAY ACQUISITION AND UTILITIES ADJUSTMENT
0018-01-063 IH 35 Actual JUN 2001 $13,152,065 2 EXCAVATION, LIME TREAT SUBGRADE, FLEX BASE AND ACP BASE, AND
0018-02-047 IH 35 Actual JUL 2001 $1,352,341 16 PORTLAND CEMENT CONCRETE OVERLAY
0018-09-004 BI 35-C Actual DEC 2000 $82,277 10A UPGRADE OF EXISTING FLASHING BEACON
0483-01-032 SH 97 Actual JUL 2001 $1,047,984 11 GRADING, BASE, STRUCTURES, SURFACING, PAVING MARKINGS, ETC.
0922-20-009 CS Actual APR 2001 $125,795 6B FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING

Maverick County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0299-13-014 BU 277N Actual MAY 2001 $3,856,783 4F RECONSTRUCT EXISTING ROADWAY
0300-01-069 US 277 Actual FEB 2001 $3,407,856 7 FOR THE CONSTRUCTION OF ASPHALTIC CONCRETE OVERLAY
0922-10-018 CR Actual FEB 2001 $109,640 6B FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING
1229-01-044 FM 1021 Actual JUL 2001 $4,286,745 4F RECONSTRUCT AND ADD CAPACITY
1229-06-005 FM 2030 Actual FEB 2001 $258,064 6A FOR CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING BRIDGE

Val Verde County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0022-04-018 US 90 Actual FEB 2001 $3,492,843 7 FOR THE CONSTRUCTION OF SEAL COAT TYPE WORK
0922-11-014 VA Actual JUL 2001 $1,582,393 15 ITS DEPLOYMENT PLAN

Webb County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0038-01-047 US 83 Actual DEC 2000 $196,082 4A UPGRADE TRAFFIC SIGNAL
0086-14-018 LP 20 Actual AUG 2001 $18,023,482 13C UPGRADE TO A 5 LANE URBAN SECTION
0921-33-039 VA Actual SEP 2000 $137,500 4B RIGHT OF WAY ACQUISITION
0922-33-041 CS Actual OCT 2000 $798,989 4A INTERCONNECT TRAFFIC SIGNALS AND LEFT TURN BAYS
0922-33-042 VA Actual APR 2001 $895,913 13C ITS DEPLOYMENT
0922-33-060 CS Actual SEP 2000 $1,464,859 13D REPLACE BRIDGE AND APPROACHES

Zavala County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0878-01-009 FM 393 Actual FEB 2001 $731,494 8A FOR THE CONSTRUCTION AND REHABILITTION OF AN EXISTING
0922-48-001 VA Actual APR 2001 $174,440 4B FOR THE CONSTRUCTION OF A HIKE AND BIKE TRAIL ON ABANDONED


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract



Top...