Letting Schedule for May, 2001 (FY 2001)

Texas Department of Transportation Logo (Registered Trademark)
 
 
Last Update: Friday, August 31, 2001
 
Updated from Design & Construction Information System (DCIS) on: August 31, 2001
May, 2001 (FY 2001) (see Links)
SEP 2000 | OCT 2000 | NOV 2000 | DEC 2000 | JAN 2001 | FEB 2001 | MAR 2001 | APR 2001 | MAY 2001 | JUN 2001 | JUL 2001 | AUG 2001
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0244-01-041 Angelina/
Lufkin
SH 63 Actual $140,890 16B LANDSCAPE DEVELOPMENT
0911-00-047 Angelina/
Lufkin
VA Actual $212,745 10A INSTALL SPECIALITY PAVEMENT MARKINGS
0180-04-100 Aransas/
Corpus Christi
BS 35-L Actual $1,256,050 11 ADD LEFT TURN SIGNAL PHASE AND ADD LEFT TURN LANE
0024-08-113 Bexar/
San Antonio
US 90 Actual $3,774,482 7 SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS
0072-08-110 Bexar/
San Antonio
IH 10 Actual $2,934,827 7 OVERLAYING ROADWAY W / ONE CRSE SURF TREAT, 2" ACP (SURF)
0521-06-084 Bexar/
San Antonio
IH 410 Actual $2,299,171 2 PLANING, SEAL COAT & ASPHALTIC OVERLAY
0111-04-032 Brazoria/
Houston
FM 521 Actual $1,769,178 14 SHOULDER REPAIR AND CRACK SEAL
0111-08-101 Brazoria/
Houston
BS 288B Actual $965,952 6A REPLACE BRIDGE
0598-02-035 Brazoria/
Houston
SH 288 Actual $1,762,901 7 FULL DEPTH CONCRETE REPAIR
0540-04-053 Brazos/
Bryan
FM 2154 Actual $334,105 7 OVERLAY CONSISTING OF PAVEMENT REPAIRS, SEAL COAT, HMA
0115-03-019 Caldwell/
Austin
FM 20 Actual $219,320 11 IMPROVE VERTICAL ALIGNMENT
0006-07-066 Callahan/
Abilene
IH 20 Actual $3,126,088 2 MILLING, HOT MIX
0921-06-133 Cameron/
Pharr
CR Actual $887,973 6B REPLACE BRIDGE AND APPROACHES
0921-06-145 Cameron/
Pharr
VA Actual $100,000 15 PRELIMINARY ENGINEERING (80 /20)
3044-01-009 Cameron/
Pharr
FM 2994 Actual $4,172,110 4D RECONSTRUCT AND ADD SHOULDERS
0055-05-044 Coryell/
Waco
US 84 Actual $2,938,109 14 IMPROVE GUARDRAIL TO DESIGN STANDARDS & SAFETY TREAT FIXED
0094-03-089 Dallas/
Dallas
SH 183 Actual $5,992,010 4F PLANING AND OVERLAY
0095-02-089 Dallas/
Dallas
US 80 Actual $227,783 10A GUIDE SIGN REFURBISHING
0353-05-103 Dallas/
Dallas
LP 12 Actual $3,223,859 4F PLANING, CONCRETE REPAIR, OVERLAY
0918-45-549 Dallas/
Dallas
VA Actual $1,577,500 5 ALTERNATIVE FUELS
0918-45-558 Dallas/
Dallas
VA Actual $1,286,834 4C AERIAL PHOTOGRAPHY AND CONTOURS
0081-13-040 Denton/
Dallas
IH 35W Actual $289,700 10A TRAFFIC SIGNAL UPGRADE
0906-00-070 Ector/
Odessa
VA Actual $390,099 10A SMALL SIGNS
0906-00-072 Ector/
Odessa
VA Actual $209,802 10A SMALL ROADSIDE SIGN UPGRADE
0924-00-040 El Paso/
El Paso
VA Actual $561,899 15 IMPROVEMENT PLAN AND RELATED WORK FOR SIX PORT OF ENTRIES
2121-03-122 El Paso/
El Paso
IH 10 Actual $158,532 14 COPING WALL REHABILITATION
0442-03-036 Ellis/
Dallas
IH 35E Actual $98,754 16B LANDSCAPE DEVELOPMENT
0918-22-069 Ellis/
Dallas
VA Actual $963,837 2 REPLACE SIGNS
0513-03-017 Falls/
Waco
SH 7 Actual $5,829,912 4E WIDEN SHOULDERS, OVERLAY AND SAFETY WORK
0027-07-036 Fort Bend/
Houston
US 90A Actual $155,000 11 OUTFALL DRAINAGE IMPROVEMENTS
0027-08-150 Fort Bend/
Houston
US 90A Actual $200,197 5 INSTALL ARTERIAL TRAFFIC MANAGEMENT SYSTEM
0188-09-035 Fort Bend/
Houston
FM 723 Actual $3,897,802 11 BASE REPAIR, WIDEN SUBGRADE AND ACP OVERLAY
0051-03-087 Galveston/
Houston
SH 3 Actual $981,745 7 BASE REPAIR, SEAL COAT WITH OVERLAY
0500-04-108 Galveston/
Houston
IH 45 Actual $1,343,298 7 BASE REPAIR, AND SEAL COAT OVERLAY
0495-07-052 Gregg/
Tyler
IH 20 Actual $7,363,756 2 REHABILITATE BRIDGE AND APPROACHES
0110-05-103 Harris/
Houston
IH 45 Actual $117,700 11 UPGRADE GUARDRAIL TO STANDARD
0177-11-139 Harris/
Houston
US 59 Actual $676,945 14 REPLACE RETAINING WALL AND REPAIR RIPRAP EMBANKMENT FAILURE
0389-05-083 Harris/
Houston
SH 146 Actual $2,277,676 5 INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM
0720-03-111 Harris/
Houston
SH 249 Actual $655,387 7 IMPROVE INTERSECTIONS TURNING RADIUS
0912-71-616 Harris/
Houston
VA Actual $177,000 11 NATIONAL POLLUTION DISCHARGE ELIMINATION STUDY PERMIT WITH
0912-71-742 Harris/
Houston
VA Actual $18,200 16S LANDSCAPE DEVELOPMENT
0063-01-067 Harrison/
Atlanta
US 59 Actual $469,056 4F REHABILITATE EXISITING 6-LANE URBAN HIGHWAY
1575-03-013 Harrison/
Atlanta
FM 2625 Actual $2,995,686 4F REHABILITATE EXISTING 2-LANE RURAL HIGHWAY
0909-37-029 Hill/
Waco
VA Actual $184,541 10A REFURBISH OVERHEAD FLASHING BEACONS
0080-04-078 Hood/
Fort Worth
US 377 Actual $3,694,450 14 MILL AND OVERLAY; SOUTHBOUND LANES ONLY IN DIVIDED SECTION &
0002-06-045 Hudspeth/
El Paso
IH 10 Actual $9,198,158 7 SEAL COAT
0642-02-010 Hunt/
Paris
FM 36 Actual $1,465,835 14 UPGRADE TO NON-FREEWAY STANDARDS
0089-05-042 Jackson/
Yoakum
US 59 Actual $3,675,553 3C ASPHALTIC CONCRETE PAVEMENT
0920-12-025 Jasper/
Beaumont
CS Actual $335,094 4D REHABILITATE EXISTING ROADWAY
0415-03-016 Jeff Davis/
El Paso
SH 166 Actual $6,415,758 4F REHABILITATION OF EXISTING ROADWAY
0747-05-016 Johnson/
Fort Worth
FM 157 Actual $2,488,996 8A RESTORE ROADWAY BY SCARIFYING, ADDING FLEX BASE AND SEAL
0067-07-077 Lubbock/
Lubbock
IH 27 Actual $1,634,476 2 REHABILITATION OF BRIDGE AND APPRROACHES
0297-06-018 Lynn/
Lubbock
US 380 Actual $6,984,660 7 OVERLAY
0919-22-017 Marion/
Atlanta
VA Actual $320,512 4B BRICK STREET RENOVATION
0299-13-014 Maverick/
Laredo
BU 277N Actual $3,856,783 4F RECONSTRUCT EXISTING ROADWAY
0092-13-015 Navarro/
Dallas
BI 45-F Actual $88,600 10A TRAFFIC SIGNAL INSTALLATION
0305-02-040 Newton/
Beaumont
SH 87 Actual $1,496,125 7 OVERLAY EXISTING ROADWAY
0326-01-036 Nueces/
Corpus Christi
SH 286 Actual $55,591,027 3A BUILD MULTI - LEVEL INTERCHANGE
0904-00-073 Potter/
Amarillo
VA Actual $1,586,355 3D INSTALL ITS EQUIPMENT
0904-00-078 Potter/
Amarillo
VA Actual $884,579 10A THERMOPLASTIC STRIPING
0904-02-024 Potter/
Amarillo
VA Actual $273,839 10A SMALL SIGNING
0064-04-030 San Augustine/
Lufkin
FM 1 Actual $414,125 4A SAFETY TREAT FIXED OBJECTS AND RESURFACE
0289-04-024 San Saba/
Brownwood
SH 16 Actual $3,956,256 11 RECONSTRUCT ROADWAY, FLEX BASE, STORM
0742-01-044 Shelby/
Lufkin
FM 139 Actual $1,039,704 14 REHAB EXISTING ROADWAY, WIDENING, STRUCTURES, BASE, SURFACING,
0164-04-050 Smith/
Tyler
SH 31 Actual $930,616 7 RESURFACE ROADWAY
0172-06-065 Tarrant/
Fort Worth
US 287 Actual $2,264,619 6A REPLACE BRIDGE
0363-01-117 Tarrant/
Fort Worth
SH 26 Actual $58,632 10A TRAFFIC SIGNAL UPGRADE NEW SIGNAL HEADS AND CABLE
0902-48-440 Tarrant/
Fort Worth
VA Actual $933,285 2 UPGRADE METAL BEAM GUARD FENCE AND INSTALLATION OF SINGLE
1330-01-031 Tarrant/
Fort Worth
FM 1187 Actual $19,041,276 3A EXPAND EXISTING 2 LN ROADWAY TO 4 LANE DIVIDED
0908-00-049 Taylor/
Abilene
VA Actual $911,945 10A SIGN REHABILITATION
0610-03-069 Titus/
Atlanta
IH 30 Actual $2,368,950 2 INSTALL CONCRETE TRAFFIC BARRIER AND CRASH CUSHIONS
0907-00-052 Tom Green/
San Angelo
IH 10 Actual $617,601 2 RETRACE PAVEMENT MARKINGS
0914-04-157 Travis/
Austin
CS Actual $127,680 4C DESIGN & CONST SIDEWALK ON WEST SIDE
3136-01-118 Travis/
Austin
LP 1 Actual $412,224 3C CORRECT DRAINAGE PROBLEM
0248-05-043 Upshur/
Atlanta
US 271 Actual $902,005 7 RESURFACE EXISTING 4-LANE RURAL HIGHWAY
0108-02-025 Van Zandt/
Tyler
SH 19 Actual $3,132,459 4E WIDEN TO 4 LANE DIVIDED URBAN HIGHWAY
0089-01-086 Victoria/
Yoakum
US 59 Actual $3,229,000 4B RENOVATION OF SAFETY REST AREA
0842-03-028 Victoria/
Yoakum
FM 236 Actual $4,374,085 4F ADD SHOULDERS, TURN LANES AND SETS
0578-02-032 Walker/
Bryan
FM 247 Actual $199,217 14 OVERLAY CONSISTING OF PAVEMENT REPAIRS, ONE COURSE SURFACE
0004-01-030 Ward/
Odessa
BI 20-B Actual $4,305,199 6A REPLACE BRIDGE AND APPROACHES
0114-09-061 Washington/
Bryan
US 290 Actual $2,521,627 14 OVERLAY CONSISTING OF AN HMA OVERLAY, PAVEMENT MARKINGS AND
0186-06-060 Washington/
Bryan
US 290 Actual $3,313,803 14 OVERLAY CONSISTING OF A ONE COURSE SURFACE TREATMENT, HMA
1376-01-018 Williamson/
Austin
FM 1325 Actual $1,473,463 14 INSTALL INTERMITTENT CONTINUOUS TURN LANE


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract