Detail Letting Schedule for Panola County (FY 2001)

Texas Department of Transportation Logo (Registered Trademark)
 
 
Last Update: Friday, August 31, 2001
 
Updated from Design & Construction Information System (DCIS) on: August 31, 2001
Panola County (FY 2001)

CCSJ: 0063-04-047

District: Atlanta Let Date: SEP 2000
Highway: US 59 Let Status: Actual
Project ID: NH 2000(960) CSJ: 0063-04-047
Description: REPLACE EXISTING ASPHALT PAVEMENT WITH CONCRETE PAVEMENT Handling
Code:
 
Limits From: US 79 E OF CARTHAGE Fund Cat: 3C
Limits To: BU 59-D S OF CARTHAGE Estimate: $4,886,479
Length: 1.8 Miles Actual: $5,988,224
 
Back...

Totals for 0063-04-047
Length: 1.8 Miles
Estimate: $4,886,479
Actual: $5,988,224

CCSJ: 0394-03-027

District: Atlanta Let Date: MAR 2001
Highway: FM 699 Let Status: Actual
Project ID: AR 394-3-27 CSJ: 0394-03-027
Description: REHABILITATE AND WIDEN EXISTING 2-LANE RURAL HIGHWAY Handling
Code:
 
Limits From: FM 2517 Fund Cat: 8A
Limits To: 2.3 MI. S. OF FM 2517 Estimate: $1,113,196
Length: 2.3 Miles Actual: $899,631
 
District: Atlanta Let Date: MAR 2001
Highway: FM 31 Let Status: Actual
Project ID: AR 640-2-21 CSJ: 0640-02-021
Description: REHABILITATE AND WIDEN EXISTING 2-LANE RURAL HIGHWAY Handling
Code:
 
Limits From: US 79 Fund Cat: 8A
Limits To: FM 123 Estimate: $1,503,333
Length: 4.9 Miles Actual: $1,335,833
 
District: Atlanta Let Date: MAR 2001
Highway: FM 123 Let Status: Actual
Project ID: AR 731-1-40 CSJ: 0731-01-040
Description: REHABILITATE AND WIDEN EXISTING 2-LANE RURAL HIGHWAY Handling
Code:
 
Limits From: US 79 Fund Cat: 8A
Limits To: FM 31 Estimate: $558,716
Length: 2.2 Miles Actual: $529,689
 
Back...

Totals for 0394-03-027
Length: 9.4 Miles
Estimate: $3,175,245
Actual: $2,765,153

CCSJ: 0462-03-037

District: Atlanta Let Date: JAN 2001
Highway: SH 315 Let Status: Actual
Project ID: STP 2001(179)R CSJ: 0462-03-037
Description: RECONSTRUCT PAVEMENT ON EXISTING 2-LANE RURAL HIGHWAY Handling
Code:
 
Limits From: 0.2 MI. W. OF FM 1970 Fund Cat: 4F
Limits To: RUSK COUNTY LINE Estimate: $6,324,967
Length: 8.7 Miles Actual: $5,849,571
 
Back...

Totals for 0462-03-037
Length: 8.7 Miles
Estimate: $6,324,967
Actual: $5,849,571

CCSJ: 1222-01-013

District: Atlanta Let Date: JUL 2001
Highway: FM 10 Let Status: Actual
Project ID: BR 2001(517) CSJ: 1222-01-013
Description: REPLACE BRIDGE & APPROACHES ON 2-LANE RURAL HIGHWAY Handling
Code:
 
Limits From: AT SIXMILE CREEK Fund Cat: 6A
Limits To: . Estimate: $1,366,997
Length: 0.5 Miles Actual: $1,449,653
 
Bid Tabulations
Back...

Totals for 1222-01-013
Length: 0.5 Miles
Estimate: $1,366,997
Actual: $1,449,653


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract