Letting Schedule for March, 2001 (FY 2001)

Texas Department of Transportation Logo (Registered Trademark)
 
 
Last Update: Friday, August 31, 2001
 
Updated from Design & Construction Information System (DCIS) on: August 31, 2001
March, 2001 (FY 2001) (see Links)
SEP 2000 | OCT 2000 | NOV 2000 | DEC 2000 | JAN 2001 | FEB 2001 | MAR 2001 | APR 2001 | MAY 2001 | JUN 2001 | JUL 2001 | AUG 2001
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0458-03-007 Anderson/
Tyler
FM 860 Actual $382,505 6A REPLACE BRIDGE AND APPROACHES
0199-08-020 Angelina/
Lufkin
BU 69-J Actual $3,203,217 7 MILL & INLAY HMAC
0903-29-011 Archer/
Wichita Falls
CR Actual $123,364 6B REPLACE BRIDGE AND APPROACHES
0015-04-069 Bell/
Waco
SP 290 Actual $866,620 7 PLANING, SEAL COAT AND ASPHALT CONCRETE PAVEMENT OVERLAY
0915-12-292 Bexar/
San Antonio
CS Actual $276,251 4C ADA SIDEWALK IMPROVEMENTS
1981-01-013 Borden/
Abilene
FM 1205 Actual $106,593 7 MISCELLENEOUS BRIDGE REPAIR
0610-05-043 Bowie/
Atlanta
IH 30 Actual $2,700,408 2 RESURFACE EXISTING INTERSTATE FACILITY
0111-08-109 Brazoria/
Houston
SH 288 Actual $528,030 7 REHABILITATE BRIDGE
0111-08-112 Brazoria/
Houston
SH 288 Actual $177,265 10A INSTALLATION OF A FLASHING BEACON TRAFFIC SIGNAL WITH SAFETY
1414-04-014 Brazoria/
Houston
FM 1462 Actual $1,551,292 14 ACP OVERLAY
0973-01-020 Callahan/
Abilene
FM 603 Actual $2,289,221 16B GRADING, FLEX BASE, STRUCTURES, CURB AND GUTTER AND
1140-01-016 Cameron/
Pharr
FM 802 Actual $78,250 16S LANDSCAPE IMPROVEMENTS AND LANDSCAPE MAINTENANCE
1140-02-028 Cameron/
Pharr
FM 802 Actual $8,491,379 4D WIDEN TO 4 LANE DIVIDED
0248-02-052 Camp/
Atlanta
US 271 Actual $128,166 11 RESURFACE AND RESTRIPE TO PROVIDE TWO WAY LEFT TURN LANE
0138-10-019 Cass/
Atlanta
FM 248 Actual $956,342 6A REPLACE BRIDGE AND APPROACHES
0198-04-027 Cherokee/
Tyler
US 175 Actual $2,090,677 4D CONSTRUCT 4 LANE DIVIDED URBAN (FLUSH MEDIAN) NEW LOCATION
1855-01-018 Cooke/
Wichita Falls
FM 922 Actual $1,507,925 8A WIDEN PAVEMENT AND EXTEND STRUCTURES
0055-05-046 Coryell/
Waco
US 84 Actual $500,424 7 ASPHALT CONCRETE PAVEMENT, MILLING AND SURFACING
0794-01-015 Dallam/
Amarillo
FM 1727 Actual $1,375,488 7 OVERLAY
0918-00-053 Dallas/
Dallas
VA Actual $3,968,379 7 SEAL COAT AND STRIPING
0918-00-054 Dallas/
Dallas
VA Actual $1,710,623 7 SEAL COAT AND STRIPING
2374-01-112 Dallas/
Dallas
IH 635 Actual $2,530,253 4C ADDITION OF TWO RAMPS TO COMPLETE A FULL DIAMOND AT
0913-00-059 Dewitt/
Yoakum
VA Actual $1,742,791 16 MILL AND INLAY
0913-00-060 Dewitt/
Yoakum
VA Actual $2,948,736 16 MILL AND INLAY
0708-01-024 Eastland/
Brownwood
FM 101 Actual $1,860,675 11 WIDEN, FLEX BASE, SAFETY TREAT STRUCTURES, 2 COURSE SURFACE
0906-00-060 Ector/
Odessa
VA Actual $431,730 2 PLACE PAVEMENT MARKINGS AND MARKERS
0906-06-040 Ector/
Odessa
CS Actual $2,329,727 4D NEW CONSTRUCTION 4 LANES CITY STREET WITH CURB
0674-01-047 El Paso/
El Paso
FM 76 Actual $8,736,405 4C WIDEN 4 LANE TO 6 LANE DIVIDED URBAN
2552-01-039 El Paso/
El Paso
LP 375 Actual $684,198 5 TRAFFIC SIGNAL EXPANSION
0048-04-078 Ellis/
Dallas
IH 35E Actual $151,728 10A SAFETY LIGHTING
0596-02-030 Ellis/
Dallas
FM 66 Actual $492,336 6A REPLACE BRIDGE AND APPROACHES
0918-22-068 Ellis/
Dallas
VA Actual $355,306 7 REMOVE AND REPLACE GUARDRAIL
0265-07-040 Fayette/
Yoakum
SH 71 Actual $3,425,281 4A ASPHALTIC CONCRETE PAVEMENT AND HIGHWAY SAFETY IMPROVEMENT
0912-34-087 Fort Bend/
Houston
CR Actual $577,923 6B REPLACE BRIDGES
0025-07-056 Gonzales/
Yoakum
SH 97 Actual $931,912 4A HMAC AND SAFETY TREAT FIXED OBJECTS
0535-05-030 Gonzales/
Yoakum
IH 10 Actual $6,258,988 2 CONCRETE REPAIR AND ACP OVERLAY
0045-04-054 Grayson/
Paris
SH 56 Actual $3,054,875 7 MICRO SURFACING
0216-03-023 Guadalupe/
San Antonio
FM 466 Actual $4,177,371 4F REHABILITATING & WIDENING NARROW PAVEMENT & SHOULDERS
0097-02-027 Hardeman/
Childress
SH 6 Actual $170,518 11 CONSISTINF OF STAMPED CROSS WALKS AND ADA RAMPS
0912-00-198 Harris/
Houston
VA Actual $463,272 10A TRAFFIC SIGNALS (NON-SITE SPECIFIC)
0255-09-074 Hidalgo/
Pharr
US 281 Actual $6,568,128 13C CONSTRUCT OVERPASS
0921-02-089 Hidalgo/
Pharr
CS Actual $2,555,051 15 CONSTRUCT 4 LANE PAVED COUNTY ROAD WITH SHOULDERS
0080-03-046 Hood/
Fort Worth
US 377 Actual $429,962 7 MICROSURFACING
1475-01-012 Hopkins/
Paris
FM 1536 Actual $1,991,474 14 SCARIFY, RESHAPE, LIME, NEW BASE & SURF
0911-28-015 Houston/
Lufkin
CR Actual $130,430 6B REPLACE BRIDGE AND APPROACHES
0911-28-016 Houston/
Lufkin
VA Actual $99,952 10A INSTALL ADVANCE CO. RD. NUMBER SIGNS
0005-06-102 Howard/
Abilene
IH 20 Actual $53,279 4A TEXTURIZE SHOULDERS
0908-12-014 Howard/
Abilene
VA Actual $1,670,563 2 UPGRADE GUIDE SIGNS
0136-01-049 Hunt/
Paris
SH 224 Actual $1,687,413 6A REPLACE BRIDGES AND APPROACHES
1227-01-024 Jim Hogg/
Pharr
FM 1017 Actual $5,943,102 4F WIDEN TO 40' WITH SHOULDERS
0072-14-019 Kendall/
San Antonio
US 87 Actual $985,025 7 OVERLAY
0052-05-034 Lamb/
Lubbock
US 84 Actual $12,599,804 7 REHABILITATION OF EXISTING ROAD
0114-07-064 Lee/
Austin
US 290 Actual $249,852 11 ADD LEFT TURN LANE
0116-01-024 Lee/
Austin
SH 21 Actual $287,431 11 ADD CONTINUOUS TURN LANE AND FLASHING BEACON
0905-00-025 Lubbock/
Lubbock
VA Actual $205,837 7 MISCELLANEOUS CONSTRUCTION
0328-07-012 McMullen/
San Antonio
SH 97 Actual $2,285,840 14 RESTORING EXISTING PAVEMENT 7 REPLACING STRUCTURES
0204-08-046 Milam/
Bryan
US 79 Actual $3,099,171 4F OVERLAY CONSISTING OF A ONE COURSE SURFACE TREATMENT, HMA
0903-28-015 Montague/
Wichita Falls
CR Actual $526,408 6B REPLACE BRIDGE AND APPROACHES
0338-02-036 Montgomery/
Houston
SH 105 Actual $1,953,886 7 BASE AND ASPHALT REPAIR, CRACK SEAL
0175-07-048 Nacogdoches/
Lufkin
US 59 Actual $152,924 4A TEXTURIZE SHOULDERS
0733-04-019 Nolan/
Abilene
FM 126 Actual $839,865 7 WIDEN 4 FT, 2 CRSE SURF TREAT, CONC STRUCTURES
0989-02-038 Nueces/
Corpus Christi
FM 624 Actual $3,476,982 7 MILLING, SEAL COAT AND OVERLAY
1088-04-020 Nueces/
Corpus Christi
FM 892 Actual $1,283,601 11 REHABILITATE ROADWAY
0226-03-045 Oldham/
Amarillo
US 385 Actual $2,815,069 4F REHAB EXISTING ROADWAY
0028-09-105 Orange/
Beaumont
IH 10 Actual $1,865,710 2 MILL AND OVERLAY EXISTING ROADWAY
0394-03-027 Panola/
Atlanta
FM 699 Actual $2,765,153 8A REHABILITATE AND WIDEN EXISTING 2-LANE RURAL HIGHWAY
2635-01-022 Potter/
Amarillo
LP 335 Actual $3,881,991 7 REHAB EXISTING ROADS & FRONTAGE ROADS
0390-02-040 San Augustine/
Lufkin
SH 147 Actual $204,959 11 WIDEN AND ADD TURNING LANES AT SCHOOL
0505-02-031 Smith/
Tyler
SH 110 Actual $1,515,897 14 WIDEN AND REHABILITATE ROADWAY
0910-00-050 Smith/
Tyler
VA Actual $585,064 10A NON-SITE SPECIFIC SIGNAL UPGRADE
0069-04-036 Sterling/
San Angelo
US 87 Actual $199,948 4A TEXTURIZE SHOULDERS (MILLED)
0032-07-019 Stonewall/
Abilene
US 83 Actual $1,345,286 7 ACP OVERLAY, PAVEMENT MARKINGS
0008-12-079 Tarrant/
Fort Worth
IH 20 Actual $2,352,659 2 REHAB /UPGRADE OF INTERSTATE SIGNING
0363-01-115 Tarrant/
Fort Worth
SH 26 Actual $378,500 10A TRAFFIC SIGNAL UPGRADE TO LONGER MAST ARM POLES AND THE
0902-48-280 Tarrant/
Fort Worth
CS Actual $895,763 5 INTERSECTION IMPROVEMENTS
1978-01-042 Tarrant/
Fort Worth
FM 1938 Actual $91,700 16C INSTALL TRAFFIC SIGNAL AND LEFT TURN LANE ON UNION CHURCH
0683-02-046 Travis/
Austin
RM 620 Actual $2,800 16C SIGNAL MODIFICATION
0319-03-046 Trinity/
Lufkin
SH 94 Actual $35,814 4A INSTALL ADVANCE WARNING SIGNALS AND SAFETY LIGHTING
0402-01-018 Upshur/
Atlanta
SH 154 Actual $2,923,354 14 REHABILITATE AND WIDEN EXISTING 2-LANE RURAL HIGHWAY
0089-08-084 Wharton/
Yoakum
US 59 Actual $797,995 4F ASPHALTIC CONCRETE PAVEMENT
0156-02-024 Wichita/
Wichita Falls
SH 240 Actual $306,021 7 OVERLAY
0156-07-093 Wichita/
Wichita Falls
IH 44 Actual $2,442,997 2 ACP OVERLAY
0096-02-043 Wood/
Tyler
US 80 Actual $1,391,143 14 REHABILITATE ROADWAY & IMPROVE STRUCTURE SAFETY


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract