CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0911-00-048 Angelina/
Lufkin
VA Actual $161,670 16S LANDSCAPE DEVELOPMENT
0915-12-131 Bexar/
San Antonio
MH Actual $2,983,089 17 RECONSTRUCT & EXPAND 2 TO 4 LN W /CLTL
0915-12-294 Bexar/
San Antonio
CS Actual $1,980,974 4C RECONSTRUCT & EXPAND 2 TO 4 LANE (CURBS, SIDEWALKS)
0915-12-371 Bexar/
San Antonio
CS Actual $780,994 10A CONSTRUCT TRAFFIC SIGNAL
2440-01-013 Bexar/
San Antonio
FM 2536 Actual $10,872,398 4C WIDEN TO 4 LANE DIVIDED URBAN WITH MEDIAN & BICYCLE LANE
2452-01-036 Bexar/
San Antonio
LP 1604 Actual $35,946,923 12 UPGRADE TO 4 LANE DIVIDED BY ADDING NORTHBOUND LANES
2452-02-061 Bexar/
San Antonio
LP 1604 Actual $4,442,374 11 CONST SALADO CREEK BRIDGES & CONTINUOUS FR RDS & INITIAL TMS
0113-03-025 Blanco/
San Antonio
US 290 Actual $1,237,806 7 RESURFACING
0253-07-004 Blanco/
Austin
LP 163 Actual $1,029,999 14 REPLACE BRIDGE & APPROACHES
0295-03-027 Borden/
Abilene
US 180 Actual $120,202 7 REPLACE BRIDGE APPROACH SLABS
0558-02-010 Borden/
Abilene
FM 669 Actual $68,016 7 UPGRADE BRIDGE RAIL & MBGF
0062-01-031 Bowie/
Atlanta
SH 8 Actual $276,061 11 CONSTRUCT TURN LANE IN FRONT OF MAUD SCHOOL
0506-01-080 Brazos/
Bryan
FM 60 Actual $884,872 14 OVERLAY CONSISTING OF A ONE COURSE SURFACE TREATMENT, HMA
0286-02-024 Caldwell/
Austin
SH 80 Actual $1,713,637 7 MILL, 1-CST, AND OVERLAY
1801-01-034 Cameron/
Pharr
FM 1847 Actual $1,365,004 4D CONSTRUCT 4 LANE DIVIDED
0455-02-020 Carson/
Amarillo
SH 152 Actual $3,242,218 14 REHAB EXISTING ROADWAY
0925-00-042 Childress/
Childress
VA Actual $250,909 10A RAISED PAVEMENT MARKERS
0816-04-038 Collin/
Dallas
FM 455 Actual $7,972,502 7 HMAC OVERLAY
0009-02-055 Dallas/
Dallas
SH 78 Actual $432,500 5 RIGHT OF WAY ACQUISITION, RELOCATION AND UTILITIES
0918-45-234 Dallas/
Dallas
CS Actual $15,035,913 4C WIDEN 4 LANE FACILITY TO 6 LANE FACILITY
2374-01-122 Dallas/
Dallas
IH 635 Actual $792,615 2 CONSTRUCT CONCRETE TRAFFIC BARRIER IN MEDIAN
0959-02-009 Dawson/
Lubbock
FM 827 Actual $1,879,191 14 REHABILITATION OF EXISTING ROAD
0196-01-084 Denton/
Dallas
IH 35E Actual $1,546,957 14 FULL DEPTH CONCRETE REPAIR, JOINT SEAL & PAVEMENT MARKINGS
0375-05-032 Edwards/
San Angelo
RM 674 Actual $1,483,263 14 REPAIR FLOOD DAMAGED LOW WATER CROSSING
0167-01-084 El Paso/
El Paso
US 54 Actual $729,328 13C WIDEN TO 4 LANE CONNECTION AT NEW MEXICO STATE LINE
0048-04-075 Ellis/
Dallas
IH 35E Actual $594,406 2 GUIDE SIGN REFURBISHING
0268-01-049 Fayette/
Yoakum
US 77 Actual $1,293,172 11 RESTORE ROADWAY
0912-34-099 Fort Bend/
Houston
VA Actual $611,234 7 REHABILITATE ROADS ON VARIOUS HIGHWAYS
3510-04-017 Fort Bend/
Houston
SH 99 Actual $1,010,744 14 INSTALL DRAINAGE BLANKET, PIPE LINER & REPAIR RCP
0500-01-124 Galveston/
Houston
IH 45 Actual $169,878 14 REPLACE LIGHTING CONDUIT, CONDUCTORS AND ELECTRICAL SERVICES
1844-02-016 Galveston/
Houston
FM 2351 Actual $220,765 14 CONSTRUCT ADDITIONAL WESTBOUND LANE
0516-02-020 Goliad/
Corpus Christi
SH 239 Actual $1,009,920 4A SAFETY TREAT DRAINAGE STRUCTURES
0047-02-118 Grayson/
Paris
US 69 Actual $234,795 16B IMPROVE TRAFFIC SIGNAL
0905-12-014 Hale/
Lubbock
VA Actual $1,019,505 2 MISCELLANEOUS CONSTRUCTION
0042-09-097 Hall/
Childress
US 287 Actual $6,611,896 16B REHABILITATION OF EXISTING ROADWAY
0120-01-015 Hamilton/
Waco
SH 22 Actual $2,684,698 7 MICROSURFACING
0271-07-221 Harris/
Houston
IH 10 Actual $289,876 11 REHABILITATE FRONTAGE ROAD BRIDGE DECK (EB & WB) AND RAMP
0508-01-297 Harris/
Houston
IH 10 Actual $157,750 7 REMOVE AND REPLACE BEARING PADS
0912-71-671 Harris/
Houston
VA Actual $6,135,574 15 DYNAMIC MESSAGE SIGNS FOR INCIDENT MANAGEMENT
0912-71-723 Harris/
Houston
VA Actual $1,326,250 11 STRIPING
0912-71-727 Harris/
Houston
VA Actual $313,680 11 SMALL SIGN UPGRADE
0912-71-734 Harris/
Houston
VA Actual $146,518 14 UPGRADE GUARDRAIL TO STANDARD
3256-01-078 Harris/
Houston
BW 8 Actual $933,903 4F THIN BOND CONCRETE OVERLAY OF FRONTAGE ROADS
0096-09-065 Harrison/
Atlanta
US 80 Actual $1,216,708 7 RESURFACE EXISTING 2-LANE RURAL HIGHWAY
0559-02-027 Henderson/
Tyler
FM 315 Actual $742,844 4F ADD SHOULDERS TO EXISTING 2 LANE ROADWAY
0039-17-132 Hidalgo/
Pharr
US 83 Actual $36,598,173 13C WIDEN TO 6 LANES
0039-18-098 Hidalgo/
Pharr
US 83 Actual $1,802,570 7 SEAL COAT-FRONTAGE ROADS ONLY
0255-07-106 Hidalgo/
Pharr
US 281 Actual $9,826,875 13C CONSTRUCT INTERCHANGE
0002-07-038 Hudspeth/
El Paso
IH 10 Actual $25,179,319 2 REHABILITATION OF MAINLANES
0203-01-044 Hunt/
Paris
BU 69-D Actual $81,142 16S LANDSCAPE & SCENIC ENHANCEMENT
0902-40-012 Jack/
Fort Worth
CR Actual $493,214 6B REPLACE BRIDGE AND APPROACHES
1307-01-013 Jackson/
Yoakum
FM 1157 Actual $1,193,966 14 RESTORE ROADWAY
1181-02-027 Johnson/
Fort Worth
FM 917 Actual $126,269 10A INSTALL TRAFFIC SIGNAL AT 2 LOCATIONS
0908-24-025 Jones/
Abilene
CR Actual $592,561 6B REPLACE BRIDGE AND APPROACHES
0916-36-007 Karnes/
Corpus Christi
CR Actual $507,935 6B REPLACE BRIDGE AND APPROACHES
0098-05-028 Knox/
Childress
SH 6 Actual $326,469 14 IMPROVEMENT OF DRIVEWAYS ACROSS A DRAINAGE FACILITY BY
0901-00-042 Lamar/
Paris
VA Actual $559,439 10A INSTALL PAVEMENT MARKERS /MARKINGS
0542-06-030 Live Oak/
Corpus Christi
US 59 Actual $4,632,818 3C REHABILITATE ROADWAY & WIDEN SHOULDERS TO 10 FEET
0905-00-024 Lubbock/
Lubbock
VA Actual $1,127,410 10A MISCELLANEOUS CONSTRUCTION
0380-08-013 Martin/
Odessa
SH 349 Actual $1,410,265 7 HOT RUBBER SEAL, PAVEMENT MARKERS AND MARKINGS
0177-14-022 Montgomery/
Houston
LP 494 Actual $229,429 10A LEFT TURN CHANNELIZATION AND TRAFFIC SIGNAL
0912-37-126 Montgomery/
Houston
VA Actual $1,264,635 7 SMALL SIGN UPGRADE
0066-04-056 Moore/
Amarillo
US 287 Actual $1,764,958 14 REHABILITATION OF AN EXISTING ROADWAY CONSISTING OF STORM
0101-06-097 Nueces/
Corpus Christi
US 181 Actual $87,400 16B INSTA. OF SOLAR-POWERED NAVIGATION LIGHTING SYSTEM
0462-03-037 Panola/
Atlanta
SH 315 Actual $5,849,571 4F RECONSTRUCT PAVEMENT ON EXISTING 2-LANE RURAL HIGHWAY
0902-38-018 Parker/
Fort Worth
CR Actual $711,910 6B REPLACE BRIDGE
0206-07-050 Rusk/
Tyler
US 79 Actual $6,369,546 3C REALIGN INTERSECTION
0059-05-035 Shelby/
Lufkin
SH 7 Actual $1,848,335 4F WIDEN ROADWAY
0063-06-075 Shelby/
Lufkin
US 59 Actual $2,787,735 6A BRIDGE REPLACEMENT
0063-06-077 Shelby/
Lufkin
US 96 Actual $5,774,311 7 MILL & HOT MIX
0424-07-006 Smith/
Tyler
FM 2767 Actual $707,298 7 ROADWAY OVERLAY
0259-11-013 Somervell/
Fort Worth
FM 200 Actual $1,465,616 6A BRIDGE REPLACEMENT
0747-04-053 Tarrant/
Fort Worth
FM 157 Actual $1,176,326 11 ROTOMILL, SEAL JOINTS, OVERLAY AND REPAIR SIGNALS
0931-05-020 Trinity/
Lufkin
FM 358 Actual $5,343,734 14 REHAB EXISTING ROADWAY
0675-06-083 Walker/
Bryan
IH 45 Actual $372,000 4B RIGHT OF WAY ACQUISITION, UTILITY ADJUSTMENTS & RELOCATION
0292-04-052 Ward/
Odessa
SH 18 Actual $1,537,509 10A PLANE, UNDERSEAL, THIN OVERLAY, PAVEMENT MARKINGS, SIGNS AND
0156-04-075 Wichita/
Wichita Falls
US 82 Actual $17,557,085 4D CONSTRUCT MAIN LANES FOR FREEWAY SECTION
0903-00-044 Wichita/
Wichita Falls
VA Actual $156,313 10A INSTALL SMALL SIGN SUPPORTS


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract