Letting Schedule for September, 2000 (FY 2001)

Texas Department of Transportation Logo (Registered Trademark)
 
 
Last Update: Friday, August 31, 2001
 
Updated from Design & Construction Information System (DCIS) on: August 31, 2001
September, 2000 (FY 2001) (see Links)
SEP 2000 | OCT 2000 | NOV 2000 | DEC 2000 | JAN 2001 | FEB 2001 | MAR 2001 | APR 2001 | MAY 2001 | JUN 2001 | JUL 2001 | AUG 2001
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0271-08-013 Austin/
Yoakum
US 90 Actual $1,262,271 4F REHABILITATE INTERSECTION
0133-04-036 Baylor/
Wichita Falls
US 82 Actual $466,400 4F EXTEND STRUCTURES
1063-02-012 Bee/
Corpus Christi
FM 888 Actual $1,799,228 8A REHABILITATE ROADWAY
0016-08-025 Bexar/
San Antonio
LP 368 Actual $68,884 4C BICYCLE WARNING SIGNS
0010-19-007 Bowie/
Atlanta
FM 991 Actual $154,365 4A INSTALL EDGE MARKING
0111-07-043 Brazoria/
Houston
BS 288B Actual $1,149,769 14 INSTALL CONTINUOUS TURN LANE
0912-31-090 Brazoria/
Houston
CR Actual $233,939 6B REPLACE BRIDGE
0912-31-112 Brazoria/
Houston
VA Actual $1,327,004 14 REHAB SIGNS
2436-01-019 Brown/
Brownwood
FM 2525 Actual $118,569 11 IMPROVE VERTICAL ALIGNMENT, ILLUMINATION & ROADSIDE BEACONS
0917-30-024 Burleson/
Bryan
CR Actual $320,823 6B REPLACEMENT OF EXISTING BRIDGE
0917-30-025 Burleson/
Bryan
CR Actual $323,181 6B REPLACEMENT OF EXISTING BRIDGE
0917-30-026 Burleson/
Bryan
CR Actual $788,788 6B REPLACEMENT OF EXISTING BRIDGE
0914-24-005 Burnet/
Austin
VA Actual $219,920 9 ADD PARKING AREAS; IMPROVE ADA ACESS; PAVE MAINT. RD
0921-06-130 Cameron/
Pharr
CR Actual $164,774 6B REPLACE BRIDGE AND APPROACHES
0031-02-023 Collingsworth/
Childress
US 83 Actual $2,699,623 7 SEALCOAT
0866-02-019 Crane/
Odessa
FM 1053 Actual $1,220,737 14 REHABILITATION
0918-00-051 Dallas/
Dallas
VA Actual $600,000 4C PUBLIC EDUCATION AND INFORMATION
0918-00-052 Dallas/
Dallas
VA Actual $3,000,000 4C MOBILITY ASSISTANCE PATROL
0918-45-162 Dallas/
Dallas
CR Actual $466,374 6B REPLACE BRIDGE AND APPROACHES
0918-45-310 Dallas/
Dallas
CS Actual $583,888 13D RECONSTRUCT CITY STREET
0918-45-536 Dallas/
Dallas
VA Actual $271,250 4C ETR
0918-45-537 Dallas/
Dallas
VA Actual $1,387,500 4C ETR
0918-45-538 Dallas/
Dallas
VA Actual $2,176,000 4C VANPOOL PROGRAM - 200 VANS
0068-05-029 Dawson/
Lubbock
US 87 Actual $114,992 16B LANDSCAPE AND SCENIC ENHANCEMENT
0525-01-017 Delta/
Paris
SH 19 Actual $39,673 16B TRAFFIC SIGNAL
0081-13-032 Denton/
Dallas
IH 35W Actual $7,376,292 11 CONSTRUCT INTERCHANGE
0718-01-046 Denton/
Dallas
FM 156 Actual $1,044,557 14 OVERLAY, BASE REPAIR AND PAVING
0042-06-052 Donley/
Childress
US 287 Actual $3,493,787 7 OVERLAY
0924-06-158 El Paso/
El Paso
VA Actual $5,161,948 5 INSTALLATION OF CONTINUOUS LIGHTING
0027-12-104 Fort Bend/
Houston
US 59 Actual $1,302,805 16F INSTALL SHEET PILING, TIMBER JETTY PANELS, SLOPE
0111-03-043 Fort Bend/
Houston
FM 521 Actual $1,830,349 14 BASE REPAIR, CRACK SEAL, ACP OVERLAY WITH 3 LEFT TURN LANES
0367-03-031 Galveston/
Houston
SH 87 Actual $375,854 10A INSTALLATION OF SPECIAL ADVANCE WARNING SIGNS WITH
1607-01-043 Galveston/
Houston
FM 1764 Actual $3,854,251 14 THIN BOND OVERLAY
0047-03-058 Grayson/
Paris
SH 5 Actual $29,810 16 MISCELLANEOUS CONSTRUCTION
0042-09-102 Hall/
Childress
US 287 Actual $1,211,239 7 ASPHALT CONCRETE PAVEMENT OVERLAY
0271-07-253 Harris/
Houston
IH 10 Actual $1,989,362 7 REPAIR AND REHAB APPROACH SLAB, ARMOUR JOINT AND RETROFIT
0271-14-194 Harris/
Houston
IH 610 Actual $2,749,116 16S MISCELLANEOUS WORK (NOISE WALLS)
0389-05-082 Harris/
Houston
SH 146 Actual   16S LANDSCAPE DEVELOPMENT
0981-01-092 Harris/
Houston
NASA 1 Actual $75,000 16S LANDSCAPE DEVELOPMENT
1062-02-019 Harris/
Houston
FM 2100 Actual $219,250 10A CONSTRUCTION OF MISCELLANEOUS WORK
0495-08-075 Harrison/
Atlanta
IH 20 Actual $1,706,715 2 INSTALL CONCRETE TRAFFIC BARRIER AND CRASH CUSHIONS
0039-04-082 Hidalgo/
Pharr
BU 83-S Actual $8,296,070 3A WIDEN & RECONSTRUCT TO 4 LANE DIVIDED URBAN
0641-03-014 Hopkins/
Tyler
FM 1567 Actual $4,406,812 8A REHAB EXIST ROAD
0136-02-018 Hunt/
Paris
SH 24 Actual $18,456,030 15 CONSTRUCT 2 LANES OF AN ULTIMATE 4-LANE DIVIDED FACILITY &
1290-05-011 Hunt/
Paris
SH 276 Actual $32,620 4A INSTALL INTERSECTION FLASHING BEACON AND SAFETY LIGHTING
0100-05-067 Karnes/
Corpus Christi
US 181 Actual $2,225,341 7 MILL AND OVERLAY ROADWAY
0133-02-023 Knox/
Childress
US 82 Actual $1,168,730 7 OVERLAY
0269-04-034 Lavaca/
Yoakum
US 77A Actual $38,499 16B LANDSCAPE DEVELOPMENT
0783-01-086 Lubbock/
Lubbock
LP 289 Actual $2,226,964 7 OVERLAY
0346-10-019 Matagorda/
Yoakum
FM 1468 Actual $2,440,931 7 RESTORE ROADWAY
0005-15-063 Midland/
Odessa
IH 20 Actual $2,558,999 2 RUBBER UNDERSEAL AND PLANT MIX, PAVEMENT MARKINGS AND MARKER
0338-03-082 Montgomery/
Houston
SH 105 Actual $161,885 10A INSTALLATION OF FULL-ACTUATED TRAFFIC SIGNAL
1259-02-013 Montgomery/
Houston
FM 1097 Actual $250,000 14 RAILROAD SIGNAL INSTALLATION
1912-02-010 Montgomery/
Houston
FM 2090 Actual $256,841 11 LEFT TURN CHANNELIZATION AND TRAFFIC SIGNAL
2325-01-011 Montgomery/
Houston
FM 2432 Actual $888,888 10A LEFT TURN CHANNELIZATION AND TRAFFIC SIGNAL
0066-05-059 Moore/
Amarillo
US 87 Actual $115,000 4B RIGHT OF WAY ACQUISITION
0617-01-152 Nueces/
Corpus Christi
SH 358 Actual $4,905,787 4C REHABILITATION
2263-02-070 Nueces/
Corpus Christi
SH 361 Actual $1,008,600 16B RECONSTRUCT FERRY LANDINGS
0008-01-041 Palo Pinto/
Fort Worth
US 180 Actual $108,680 16C TRAFFIC SIGNAL INSTALLATION
0063-04-047 Panola/
Atlanta
US 59 Actual $5,988,224 3C REPLACE EXISTING ASPHALT PAVEMENT WITH CONCRETE PAVEMENT
0904-00-072 Potter/
Amarillo
VA Actual $1,477,035 11 SMALL SIGNING
0904-00-074 Potter/
Amarillo
VA Actual $969,252 7 CRACK POURING
0904-11-026 Randall/
Amarillo
CR Actual $144,055 6B REPLACE EXISTING BRIDGE
0372-01-084 San Patricio/
Corpus Christi
US 77 Actual $482,665 14 MILL ACP AND OVERLAY
0363-01-112 Tarrant/
Fort Worth
SH 26 Actual $686,303 4C CORRIDOR IMPROVEMENTS
0902-00-073 Tarrant/
Fort Worth
VA Actual $774,408 7 THERMOPLASTIC PAVEMENT MARKINGS AND RAISED PAVEMENT MARKERS
0902-48-364 Tarrant/
Fort Worth
VA Actual $4,306,250 5 RAILTRAN RAIL PROJECT
0361-01-024 Throckmorton/
Wichita Falls
US 380 Actual $2,290,696 14 WIDENING STRUCTURES, BASE, AND SURFACING
0221-05-072 Titus/
Atlanta
US 271 Actual $1,116,358 4A INSTALL TRAFFIC SIGNAL
0907-00-048 Tom Green/
San Angelo
VA Actual $2,273,792 2 UPGRADE GUARD FENCE
0907-24-015 Tom Green/
San Angelo
CS Actual $698,993 13D URBAN STREET PROGRAM -- REHABILITATE CITY STREETS
0151-06-122 Travis/
Austin
US 183 Actual $97,080 11 REMOVE RAMP
0004-02-050 Ward/
Odessa
IH 20 Actual $410,287 2 RECROWN BY PLANNING, THEN SURFACE TREAT DRIVING LANES ONLY
0921-33-039 Webb/
Laredo
VA Actual $137,500 4B RIGHT OF WAY ACQUISITION
0922-33-060 Webb/
Laredo
CS Actual $1,464,859 13D REPLACE BRIDGE AND APPROACHES
0043-09-099 Wichita/
Wichita Falls
IH 44 Actual $492,185 10A REPLACE LARGE GROUND MOUNTS ON MAIN LANES AND SMALL SIGNS ON
0903-00-043 Wichita/
Wichita Falls
VA Actual $737,219 10A INSTALL SMALL SIGN SUPPORTS
1825-02-010 Winkler/
Odessa
FM 1218 Actual $1,728,777 8A SCARIFY, RESHAPE, ADD BASE AND TWO-COURSE SURFACE TREATMENT


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract



Top...
Back...
 
Letting Schedule
Doing Business with TxDOT