Abilene District (FY 2002)
Callahan | Haskell | Howard | Jones | Mitchell | Nolan | Scurry | Taylor

Callahan County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0908-34-017 CR Actual SEP 2001 $218,913 6 REPLACE BRIDGE AND APPROACHES

Haskell County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0098-06-016 SH 6 Actual SEP 2001 $2,552,367 1 EXTEND AND SAFETY END TREAT CULVERTS, FLEXIBLE BASE,
0360-04-027 US 380 Actual JUN 2002 $628,673 1 PLANE EXISTING PAVEMENT AND REPLACE WITH ACP

Howard County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0005-05-093 IH 20 Actual DEC 2001 $8,507,298 1 SEAL COAT
0005-06-104 IH 20 Actual AUG 2002 $350,090 8 TEXTURIZE SHOULDERS (MILLED)
0068-08-050 US 87 Actual AUG 2002 $272,859 1 TRAFFIC SIGNAL UPGRADE
0668-01-014 FM 700 Actual DEC 2001 $1,660,581 1 RECONSTRUCT EXIT AND ENTRANCE RAMPS FOR ONE WAY FRONTAGE

Jones County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0033-04-058 US 83 Actual JUL 2002 $1,229,664 1 REHABILITATION
0033-05-076 US 83 Actual OCT 2001 $4,137,528 11 CONSTRUCT NEW OVERPASS
0908-24-022 CR Actual AUG 2002 $345,789 6 REPLACE BRIDGE AND APPROACHES
0908-24-028 CR Actual AUG 2002 $1,097,526 6 REPACE BRIDGE AND APPROACHES
0908-24-031 CR Actual SEP 2001 $662,052 6 REPLACE BRIDGE AND APPROACHES

Mitchell County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0005-08-088 IH 20 Actual DEC 2001 $146,000 1 CLEAN & PAINT STRUCTURE
0006-01-083 IH 20 Actual AUG 2002 $1,677,291 1 PLANE EXIST PAVEMENT, ACP OVERLAY
0333-01-026 SH 163 Actual JUL 2002 $2,998,934 1 RECONSTRUCT AND WIDEN EXIST ROADWAY TO 32'
0908-21-011 CR Actual AUG 2002 $148,223 6 REPLACE BRIDGE AND APPROACHES

Nolan County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0006-03-119 IH 20 Actual APR 2002 $5,067,317 1 PLANING, EXCAVATION, FLEXIBLE BASE, UNDERSEAL, AND ASPHALT
0006-15-027 BI 20-M Actual SEP 2001 $163,918 1 WORK CONSISTING OF FLOWABLE BACKFILL MATERIAL

Scurry County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0053-08-059 US 84 Actual JUL 2002 $5,095,458 10 CONSTRUCT TWIN OVERPASSES & APPROACHES
0966-01-009 FM 644 Actual SEP 2001 $2,134,297 1 WIDEN 4 FT, 2 CRSE SURF TREAT, CONC

Taylor County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0006-06-083 IH 20 Actual MAY 2002 $1,927,389 6 REPLACE BRIDGE AND APPROACHES
0006-17-004 BI 20-P Actual AUG 2002 $318,606 11 REALIGNMENT OF EXISTING INTERSECTION
0006-18-042 BI 20-R Actual JUN 2002 $100,000 10 LANDSCAPE MATERIALS
0034-01-107 US 83 Actual APR 2002 $19,989,242 1 WIDEN EXISTING 4 LANE DIVIDED FREEWAY TO 6 LANE DIVIDED
0181-01-054 SH 36 Actual JUN 2002 $138,648 1 INSTALL TRAFFIC SIGNALS
0699-01-041 FM 89 Actual AUG 2002 $3,212,583 1 RESTORATION OF AN EXISTING ROADWAY
0908-00-050 VA Actual AUG 2002 $410,882 1 PAVEMENT MARKINGS
1070-01-006 FM 382 Actual AUG 2002 $871,784 1 REHABILITATE AND WIDEN EXIST ROADWAY


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract



Top...