Letting Schedule for April, 2002 (FY 2002)

Texas Department of Transportation Logo (Registered Trademark)
 
 
Last Update: Thursday, September 5, 2002
 
Updated from Design & Construction Information System (DCIS) on: August 30, 2002
April, 2002 (FY 2002) (see Links)
SEP 2001 | OCT 2001 | NOV 2001 | DEC 2001 | JAN 2002 | FEB 2002 | MAR 2002 | APR 2002 | MAY 2002 | JUN 2002 | JUL 2002 | AUG 2002
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
2412-02-012 Bee/
Corpus Christi
FM 351 Actual $5,889,738 1 CONSTRUCT 5 LANE CURB AND GUTTER SECTION IN THE URBAN AREAS
0184-02-042 Bell/
Waco
SH 36 Actual $19,984,243 10 REPLACE BRIDGE AND APPROACHES
0909-36-098 Bell/
Waco
CR Actual $12,264,263 12 RECONSTRUCT COUNTY ROAD TO FIVE LANE URBAN ALONG CLEAR CR RD
0046-04-047 Bowie/
Atlanta
US 82 Actual $627,687 1 RESTORE PAVEMENT DAMAGED BY MOISTURE INFILTRATION
0917-29-075 Brazos/
Bryan
CR Actual $702,511 6 REPLACE BRIDGES AND APPROACHES
0054-06-074 Brown/
Brownwood
US 67 Actual $3,919,168 1 RECONSTRUCT INTERSECTION
0684-01-052 Cameron/
Pharr
FM 511 Actual $1,870,331 10 REPLACE BRIDGE AND APPROACHES
0047-15-004 Collin/
Dallas
SP 359 Actual $81,800 1 TRAFFIC SIGNAL INSTALLATION
0091-04-046 Collin/
Dallas
SH 289 Actual $168,668 1 ADDITION OF A LEFT TURN LANE
0918-24-086 Collin/
Dallas
VA Actual $194,735 7 CONSTRUCT TURNS LANES AND SIGNALS
1012-03-012 Collin/
Dallas
FM 981 Actual $571,540 6 REPLACE BRIDGE AND APPROACHES
0918-00-060 Dallas/
Dallas
VA Actual $1,269,460 1 ATTENUATOR UPGRADE
0918-45-555 Dallas/
Dallas
CS Actual $554,150 5 PROVIDE UPDATED SIGNAL TIMING PLANS AND INCIDENT - RELATED
0195-03-055 Denton/
Dallas
IH 35E Actual $3,231,939 11 REPLACE BRIDGE AND APPROACHES
0906-00-093 Ector/
Odessa
VA Actual $65,119 1 UPGRADE LARGE GUIDE SIGNS
0001-04-079 El Paso/
El Paso
US 85 Actual $2,068,096 1 REMOVE EXISTING MEDIAN, INSTALL CTB BARRIER, DRAINAGE STR,
0924-06-208 El Paso/
El Paso
CS Actual $1,659,650 9 PURCHASE RIGHT OF WAY
0111-03-045 Fort Bend/
Houston
FM 521 Actual $38,738 10 RAILROAD GRADE CROSSING REPLANKING
0675-02-050 Freestone/
Bryan
IH 45 Actual $531,315 1 REHABILITATION OF EXISTING ROAD CONSISTING OF GRADING,
0901-19-105 Grayson/
Paris
CR Actual $642,550 10 REPLACE BRIDGE & APPROACHES
0027-13-177 Harris/
Houston
US 59 Actual $60,160 10 RAILROAD GRADE CROSSING REPLANKING
0027-13-178 Harris/
Houston
US 59 Actual $60,160 10 RAILROAD GRADE CROSSING REPLANKING
0271-16-117 Harris/
Houston
IH 610 Actual $5,434,594 1 GRIND EXIST PAVEMENT ADD BONDED CONCRETE O / L, RECONSTRUCT
0389-05-090 Harris/
Houston
SH 146 Actual $165,440 10 RAILROAD GRADE CROSSING REPLANKING
0598-01-067 Harris/
Houston
SH 288 Actual $1,863,939 1 FULL DEPTH CONCRETE REPAIR AND CRACK & JOINT SEAL MAINLANES
0010-02-066 Hopkins/
Paris
IH 30 Actual $9,043,231 1 OVERPASS STRUCTURE, UNDERPASS AT RADIO RD, RECONSTRUCT
0642-05-019 Kaufman/
Dallas
FM 986 Actual $101,400 1 TRAFFIC SIGNAL INSTALLATION
0915-15-014 Kerr/
San Antonio
CS Actual $1,349,312 6 REPLACE BRIDGE & APPROACHES
0017-08-067 La Salle/
Laredo
IH 35 Actual $5,103,252 1 RECONSTRUCT NORTHBOUND AND MILL AND OVERLAY SOUTHBOUND
0018-10-007 La Salle/
Laredo
BI 35-B Actual $6,827,374 1 PREVENTIVE MAINTENANCE - OVERLAY (FY 2002)
0068-02-042 Lynn/
Lubbock
US 87 Actual $10,063,257 1 REHABILITATION OF EXISTING ROAD
0223-01-025 Marion/
Atlanta
SH 49 Actual $857,887 1 REHABILITATE AND WIDEN EXISTING 2 - LANE HIGHWAY
0209-01-046 McLennan/
Waco
US 77 Actual $8,179,592 3 WIDEN FROM 2 LANE TO 4 LANE DIVIDED WITH LEFT TURN LANE
0177-14-021 Montgomery/
Houston
LP 494 Actual $615,029 11 ADD LEFT TURN LANES
0006-03-119 Nolan/
Abilene
IH 20 Actual $5,067,317 1 PLANING, EXCAVATION, FLEXIBLE BASE, UNDERSEAL, AND ASPHALT
2839-02-012 Palo Pinto/
Fort Worth
SH 337 Actual $2,219,125 1 MILL EXISTING PAVEMENT AND OVERLAY 3 INCHES
0902-38-020 Parker/
Fort Worth
CR Actual $358,184 6 REPLACE BRIDGE
0275-01-133 Potter/
Amarillo
IH 40 Actual $2,148,726 11 WIDEN EXISTING ROADWAY (NFR)
0424-05-019 Rusk/
Tyler
FM 3231 Actual $1,773,688 10 CONSTRUCT 2 - LN NON - FRWY ON NEW LOCATION
0008-14-096 Tarrant/
Fort Worth
IH 820 Actual $736,670 11 CONSTRUCT SOUTH FRONTAGE ROAD
0171-05-055 Tarrant/
Fort Worth
SH 199 Actual $8,680,621 2 RECONSTRUCT ROADWAY
0034-01-107 Taylor/
Abilene
US 83 Actual $19,989,242 1 WIDEN EXISTING 4 LANE DIVIDED FREEWAY TO 6 LANE DIVIDED
2102-01-023 Travis/
Austin
RM 2244 Actual $6,673,493 1 CONST 4 - LN URBAN RDWY
3136-01-099 Travis/
Austin
LP 1 Actual $3,036,837 2 INSTALL CONDUIT & DETECTION AND FREEWAY TRAFFIC MGMT SYSTEM
0520-02-041 Upshur/
Atlanta
SH 155 Actual $1,354,176 1 REHABILITATE EXISTING 2 - LANE RURAL HIGHWAY
0022-06-043 Val Verde/
Laredo
US 90 Actual $3,529,949 1 FOR THE CONSTRUCTION OF SEAL COAT TYPE WORK
2350-01-032 Victoria/
Yoakum
LP 463 Actual $10,749,588 11 CONSTRUCT GRADE SEPARATION INTERCHANGE AND MAIN LANES
0043-08-066 Wichita/
Wichita Falls
US 287 Actual $12,394,717 1 FULL - DEPTH CRCP OVERLAY
0156-14-015 Wichita/
Wichita Falls
BU 277A Actual $3,376,329 1 WIDEN, IMPROVE SHOULDERS AND DRAINAGE
0249-01-033 Wichita/
Wichita Falls
US 281 Actual $5,104,323 1 CONCRETE OVERLAY
0327-10-027 Willacy/
Pharr
US 77 Actual $18,698,203 1 CONSTRUCT INTERCHANGE
0015-09-128 Williamson/
Austin
IH 35 Actual $281,786 10 RELOCATE RAMP
0986-01-032 Williamson/
Austin
FM 619 Actual $791,487 6 REPLACE BRIDGE & APPROACHES
0915-14-018 Wilson/
San Antonio
CR Actual $303,965 6 REPLACE BRIDGE & APPROACHES
0910-35-021 Wood/
Tyler
CR Actual $369,717 6 REPLACE BRIDGE AND APPROACHES STR# AA0271 - 001


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract