SEP 2001 | OCT 2001 | NOV 2001 | DEC 2001 | JAN 2002 | FEB 2002 | MAR 2002 | APR 2002 | MAY 2002 | JUN 2002 | JUL 2002 | AUG 2002 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0176-02-095 | Angelina/ Lufkin |
BU 59-G | Actual | $86,109 | 1 | INSTALL TRAFFIC SIGNALS |
0913-20-050 | Austin/ Yoakum |
CR | Actual | $246,239 | 6 | REPLACE BRIDGE AND APPROACHES |
0265-03-032 | Bastrop/ Austin |
SH 71 | Actual | $2,633,661 | 1 | CONSTRUCT INTERCHANGE WB ONLY OVER SH 21 |
0915-12-297 | Bexar/ San Antonio |
CS | Actual | $2,499,519 | 7 | REHABILITATE AND WIDEN NARROW PAVEMENT (CURBS AND SIDEWALK) |
0915-12-395 | Bexar/ San Antonio |
VA | Actual | $3,539,459 | 9 | ENHANCE ROADWAYS, TRAILS, MARKERS THAT LEAD TO THE MISSIONS |
3508-01-019 | Bexar/ San Antonio |
SH 151 | Actual | $25,500,021 | 2 | EXPANDING TO 4 LANE FREEWAY & REHABILITATING FRONTAGE ROADS |
0610-07-080 | Bowie/ Atlanta |
IH 30 | Actual | $875,788 | 1 | REPAIR AND RESURFACE PAVEMENT IN FREEWAY INTERCHANGE |
0039-06-036 | Cameron/ Pharr |
BU 83-S | Actual | $1,378,177 | 1 | INSTALLING TRAFFIC SIGNAL |
0873-02-013 | Cameron/ Pharr |
FM 507 | Actual | $3,186,645 | 1 | REHABILITATE PAVEMENT AND ADD SHOULDERS |
0925-00-046 | Childress/ Childress |
VA | Actual | $326,061 | 1 | THERMOPLASTIC STRIPING |
0903-15-041 | Cooke/ Wichita Falls |
CR | Actual | $298,045 | 6 | BRIDGE REPLACEMENT |
0066-01-015 | Dallam/ Amarillo |
US 287 | Actual | $747,483 | 1 | OVERLAY |
0009-11-194 | Dallas/ Dallas |
IH 30 | Actual | $520,235 | 1 | REFURBISHING OF HIGH MAST ILLUMINATION |
0281-03-040 | Dallas/ Dallas |
SH 78 | Actual | $24,344 | 1 | GUIDE SIGN REFURBISHING |
0918-00-062 | Dallas/ Dallas |
VA | Actual | $208,334 | 7 | PUBLIC EDUCATION AND INFORMATION |
0918-00-065 | Dallas/ Dallas |
VA | Actual | $332,500 | 5 | ATMS |
0918-45-224 | Dallas/ Dallas |
CS | Actual | $1,239,227 | 7 | WIDEN 2 - LANE FACILITY TO 6 - LANE FACILITY |
0918-45-632 | Dallas/ Dallas |
VA | Actual | $500,000 | 7 | PROGRAM;TRANSIT FEASIBILITY AND LAND - USE IMPLEMENTATION |
2964-10-001 | Dallas/ Dallas |
LP | Actual | $823,000 | 7 | MAJOR INVESTMENT STUDY |
0196-02-097 | Denton/ Dallas |
IH 35E | Actual | $11,410,038 | 1 | INSTALL SURFACE COURSE AND RESTRIPE FREEWAY |
0269-05-032 | Dewitt/ Yoakum |
US 77A | Actual | $2,526,966 | 1 | REHABILITATE ROADWAY |
2329-01-006 | Dickens/ Childress |
FM 1081 | Actual | $1,371,171 | 4 | NEW FM ROAD |
0906-00-077 | Ector/ Odessa |
VA | Actual | $618,278 | 1 | SMALL SIGN UPGRADE (TX TRUNK SYSTEM) |
0924-00-034 | El Paso/ El Paso |
VA | Actual | $997,028 | 11 | MBGF REPAIR, DISTRICTWIDE |
0048-03-078 | Ellis/ Dallas |
SH 342 | Actual | $78,800 | 1 | TRAFFIC SIGNAL INSTALLATION |
1051-01-030 | Ellis/ Dallas |
FM 664 | Actual | $62,769 | 1 | TRAFFIC SIGNAL INSTALLATION |
1331-01-010 | Erath/ Fort Worth |
FM 1189 | Actual | $375,558 | 6 | REPLACE BRIDGE AND APPROACHES |
0535-07-042 | Fayette/ Yoakum |
IH 10 | Actual | $851,422 | 1 | REHABILITATE FRONTAGE ROAD |
0027-12-117 | Fort Bend/ Houston |
US 59 | Actual | $979,283 | 1 | REHABILITATE PAVEMENT SHOULDERS, ACP OVERLAY, SIGNING AND |
0187-05-046 | Fort Bend/ Houston |
SP 10 | Actual | $16,589,355 | 4 | CONSTRUCT GRADE SEPARATION |
1685-06-025 | Fort Bend/ Houston |
SH 6 | Actual | $1,653,820 | 1 | CONSTRUCT CROSS DRAINAGE STRUCTURE, STORM SEWER & CLEAN DITCH |
0728-01-037 | Grayson/ Paris |
FM 120 | Actual | $4,000 | 10 | PLANTING OF 80 CRAPE MYRTLES IN AN EXISTING MEDIAN |
0138-01-090 | Gregg/ Tyler |
US 259 | Actual | $249,948 | 10 | INSTALL TRAFFIC SIGNAL AND MEDIANS |
2642-01-036 | Gregg/ Tyler |
LP 281 | Actual | $1,644,036 | 1 | MILL AND INLAY AT VARIOUS INTERSECTIONS |
0315-03-047 | Grimes/ Bryan |
SH 90 | Actual | $995,962 | 1 | SEAL COAT CONSISTING OF A ONE COURSE SURFACE TREATMENT, |
0784-01-039 | Hardin/ Beaumont |
FM 418 | Actual | $237,515 | 1 | RESTORE EXISTING ROADWAY |
0028-01-089 | Harris/ Houston |
US 90 | Actual | $16,800 | 10 | REPAIR AND / OR REPLACE DAMAGED ILLUMINATION ELECTRICAL |
0177-11-138 | Harris/ Houston |
US 59 | Actual | $35,000 | 11 | FRENCHTOWN HISTORICAL MARKER AND LANDSCAPING |
0177-11-140 | Harris/ Houston |
US 59 | Actual | $5,000 | 10 | REPAIR COLLAPSED PUMPHOUSE BASKET TO ORIGINAL CONDITION |
0271-07-267 | Harris/ Houston |
IH 10 | Actual | $70,276 | 10 | REMOVE BROKEN AND RELAID ASPHALT PAVEMENT ON TRANSITION TO |
0271-07-268 | Harris/ Houston |
IH 10 | Actual | $57,124 | 10 | RESTORE FILL AND REPLACE ERODED CONCRETE RIPRAP AROUND |
0271-07-269 | Harris/ Houston |
IH 10 | Actual | $17,048 | 10 | FILL IN EROSION UNDER CONCRETE RIPRAP AND REPAIR DAMAGED |
0389-05-093 | Harris/ Houston |
SH 146 | Actual | $562,907 | 1 | ACP REHABILITATION MEDIAN AND SHOULDER |
0508-01-306 | Harris/ Houston |
IH 10 | Actual | $13,685 | 10 | REMOVE BROKEN ASPHALT PAVEMENT ON SHOULDER AND RELAY WITH |
0598-01-068 | Harris/ Houston |
SH 288 | Actual | $78,830 | 10 | FILL ERODED CONCRETE RIPRAP SLOPE AREAS AND REPLACE CONCRETE |
0912-00-234 | Harris/ Houston |
VA | Actual | $168,500 | 10 | PROVIDE TRAFFIC CONTROL AND DEBRIS REMOVAL |
0912-00-235 | Harris/ Houston |
VA | Actual | $27,288 | 10 | REPAIR AND / OR REPLACE DAMAGED TRAFFIC SIGNAL CONTROLLERS |
0912-00-236 | Harris/ Houston |
VA | Actual | $13,311 | 10 | REPAIR AND / OR REPLACE DAMAGED TRAFFIC SIGNAL CONTROLLERS |
0912-71-779 | Harris/ Houston |
CR | Actual | $65,000 | 10 | REMOVE DEBRIS, REPLACE WASHED OUT ASPHALT PAVED ROADWAY, |
0912-71-780 | Harris/ Houston |
VA | Actual | $6,264 | 10 | REPLACE ASPHALT PAVEMENT |
0912-71-784 | Harris/ Houston |
VA | Actual | $20,612 | 10 | REPAIR AND / OR REPLACE DAMAGED TRAFFIC SIGNAL CONTROLLERS |
0912-71-785 | Harris/ Houston |
VA | Actual | $33,600 | 10 | REPAIR AND / OR REPLACE DAMAGED ILLUMINATION ELECTRICAL |
0912-71-786 | Harris/ Houston |
VA | Actual | $16,800 | 10 | REPAIR AND / OR REPLACE DAMAGED ILLUMINATION ELECTRICAL |
0912-71-787 | Harris/ Houston |
VA | Actual | $58,544 | 10 | REPAIR AND / OR REPLACE DAMAGED TRAFFIC SIGNAL CONTROLLERS |
0912-71-788 | Harris/ Houston |
VA | Actual | $11,200 | 10 | REPAIR AND / OR REPLACE DAMAGED ILLUMINATION ELECTRICAL |
0912-71-813 | Harris/ Houston |
VA | Actual | $317,117 | 10 | REPAIR TRAFFIC SIGNAL CONTROLLERS AND ELECTRONIC COMPONENTS |
0912-71-815 | Harris/ Houston |
VA | Actual | $31,096 | 10 | REPAIR CONCRETE RIPRAP ON SLOPES |
0360-04-027 | Haskell/ Abilene |
US 380 | Actual | $628,673 | 1 | PLANE EXISTING PAVEMENT AND REPLACE WITH ACP |
2293-01-014 | Hays/ Austin |
FM 2439 | Actual | $6,111,688 | 11 | RECONSTRUCT TO 5 LANES |
0080-04-082 | Hood/ Fort Worth |
US 377 | Actual | $75,700 | 10 | INSTALL TRAFFIC SIGNAL |
1282-01-012 | Hudspeth/ El Paso |
FM 1437 | Actual | $2,455,000 | 1 | REHABILITATION |
1181-04-034 | Johnson/ Fort Worth |
FM 917 | Actual | $325,382 | 8 | INSTALL INTERSECTION FLASHING BEACON AND ADD LEFT TURN LANE |
0173-03-031 | Kaufman/ Dallas |
SH 34 | Actual | $671,069 | 1 | WIDEN MEDIAN FOR CONTINOUS LEFT TURN LANE |
0028-04-066 | Liberty/ Beaumont |
US 90 | Actual | $1,588,910 | 1 | REHABILITATE EXISTING ROADWAY |
0419-03-005 | Limestone/ Waco |
LP 442 | Actual | $3,000 | 10 | PURCHASE OF LANDSCAPE MATERIAL |
0905-00-031 | Lubbock/ Lubbock |
VA | Actual | $1,055,237 | 1 | MISCELLANEOUS CONSTRUCTION |
0014-10-055 | McLennan/ Waco |
BU 77-L | Actual | $60,000 | 10 | PURCHASE OF LANDSCAPE MATERIAL |
0049-01-078 | McLennan/ Waco |
SH 6 | Actual | $367,790 | 11 | REPAIR SHOULDER FAILURES |
0833-15-002 | McLennan/ Waco |
FM 434S | Actual | $64,226 | 10 | PURCHASE OF LANDSCAPE MATERIAL |
3521-01-006 | McLennan/ Waco |
FM 2837 | Actual | $7,049,159 | 4 | CONSTRUCT NEW LOCATION NON - FREEWAY FACILITY |
0204-07-043 | Milam/ Bryan |
US 79 | Actual | $132,401 | 1 | MISCELLANEOUS CONSTRUCTION CONSISTING OF INSTALLING |
0110-04-156 | Montgomery/ Houston |
IH 45 | Actual | $2,044,286 | 5 | INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM |
0110-04-174 | Montgomery/ Houston |
IH 45 | Actual | $16,800 | 10 | REPAIR AND / OR REPLACE DAMAGED ILLUMINATION ELECTRICAL |
0912-37-137 | Montgomery/ Houston |
VA | Actual | $25,843 | 10 | REP SHOULDER WASHOUTS, GUARDRAIL & ASPHALT PAVEMENT, REPAIR |
0912-37-139 | Montgomery/ Houston |
VA | Actual | $16,240 | 10 | REPAIR AND / OR REPLACE DAMAGED TRAFFIC SIGNAL CONTROLLERS |
1416-03-010 | Montgomery/ Houston |
FM 1486 | Actual | $22,136 | 10 | RAILROAD GRADE CROSSING REPLANKING |
0066-04-059 | Moore/ Amarillo |
US 287 | Actual | $6,589,773 | 1 | CONCRETE UPGRADE |
0059-01-050 | Nacogdoches/ Lufkin |
SH 7 | Actual | $4,429,650 | 11 | MILL & INLAY |
0882-02-051 | Orange/ Beaumont |
FM 1006 | Actual | $935,371 | 1 | INSTALL TRAFFIC SIGNALS AND CONSTRUCT LEFT TURN LANES |
0008-02-065 | Parker/ Fort Worth |
US 180 | Actual | $72,966 | 8 | TEXTURIZE SHOULDERS (MILLED) |
0275-01-138 | Potter/ Amarillo |
IH 40 | Actual | $2,875,189 | 1 | UPGRADE EXIT RAMP |
0904-00-080 | Potter/ Amarillo |
VA | Actual | $489,458 | 1 | THERMOPLASTIC STRIPING |
0076-08-022 | Reagan/ San Angelo |
US 67 | Actual | $6,553,526 | 1 | REHABILITATE EXISTING ROADWAY |
0036-03-028 | Real/ San Angelo |
US 83 | Actual | $474,250 | 1 | RETRACE PAVEMENT MARKINGS |
0910-00-054 | Smith/ Tyler |
VA | Actual | $409,332 | 1 | NON - SITE SPECIFIC SIGNAL UPGRADE FY 2002 |
0257-01-033 | Stephens/ Brownwood |
US 183 | Actual | $122,643 | 1 | CURB AND GUTTER, SIDEWALK, SEAL COAT, AND STRIPING |
0080-07-074 | Tarrant/ Fort Worth |
US 377 | Actual | $198,201 | 1 | TRAFFIC SIGNAL UPGRADE BY REPLACING SIGNAL HEADS AND ADDING |
0081-02-053 | Tarrant/ Fort Worth |
US 377 | Actual | $34,915 | 10 | PURCHASE LANDSCAPE MATERIAL |
0902-00-087 | Tarrant/ Fort Worth |
VA | Actual | $112,799 | 1 | SMALL SIGNS REPLACEMENT |
0902-48-368 | Tarrant/ Fort Worth |
CR | Actual | $666,119 | 6 | REPLACE BRIDGE AND APPROACHES |
0902-48-404 | Tarrant/ Fort Worth |
VA | Actual | $399,827 | 9 | CONSTRUCT CONCRETE TRAIL |
0902-48-468 | Tarrant/ Fort Worth |
VA | Actual | $50,110 | 5 | CLEAN VEHICLES PUBLIC FLEET ARLINGTON |
2266-02-110 | Tarrant/ Fort Worth |
SH 360 | Actual | $549,916 | 8 | INSTALL MEDIAN BARRIER |
0006-18-042 | Taylor/ Abilene |
BI 20-R | Actual | $100,000 | 10 | LANDSCAPE MATERIALS |
0181-01-054 | Taylor/ Abilene |
SH 36 | Actual | $138,648 | 1 | INSTALL TRAFFIC SIGNALS |
0907-00-054 | Tom Green/ San Angelo |
VA | Actual | $349,008 | 1 | UPGRADE ROADSIDE FLASHING BEACON ASSEMBLIES |
0016-01-091 | Travis/ Austin |
IH 35 | Actual | $1,944,819 | 7 | ADD INSIDE SHOULDERS & CONCRETE MEDIAN BARRIERS |
0265-01-092 | Travis/ Austin |
SH 71 | Actual | $916,601 | 1 | CONSTRUCT TURNAROUNDS |
0914-00-172 | Travis/ Austin |
VA | Actual | $331,555 | 1 | REHABILITATE ATMS ROADSIDE EQUIPMENT |
0914-04-096 | Travis/ Austin |
VA | Actual | $97,956 | 7 | CONSTRUCT SHOAL CREEK BIKE PATH |
0914-04-186 | Travis/ Austin |
VA | Actual | $200,000 | 7 | CARRYOVER FROM COMMUTE SOLUTIONS / AIR QUALITY PROGRAMS |
1200-02-017 | Travis/ Austin |
FM 973 | Actual | $5,107,801 | 8 | RECONST TO 2 - 12' LNS W / SHLDRS |
0088-05-079 | Victoria/ Yoakum |
US 59 | Actual | $3,062,405 | 1 | ASPHALTIC CONCRETE PAVEMENT |
0043-05-097 | Wilbarger/ Wichita Falls |
US 287 | Actual | $762,251 | 1 | ACP OVERLAY |
0124-03-053 | Wilbarger/ Wichita Falls |
US 183 | Actual | $2,526,853 | 1 | REHABILITATE EXISTING ROADWAY |
0657-01-014 | Wood/ Tyler |
FM 515 | Actual | $2,504,151 | 1 | WIDEN ROADWAY TO PROVIDE CONTINUOUS LEFT TURN LANE |