Detail Letting Schedule for Wichita County (FY 2002)
![]() |
![]() |
![]() |
![]() |
![]() |
Detail Letting Schedule for Wichita County (FY 2002) | ||||
Last Update: Thursday, September 5, 2002 | ||||
Updated from Design & Construction Information System (DCIS) on: August 30, 2002 |
Wichita County (FY 2002) |
CCSJ: 0043-08-066 | |||
District: | Wichita Falls | Let Date: | APR 2002 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | NH 2001(629) | CSJ: | 0043-08-066 |
Description: | FULL - DEPTH CRCP OVERLAY | Handling Code: |
|
Limits From: | SH 25 | Fund Cat: | 1 |
Limits To: | BU 287H (NBL) | Estimate: | $7,713,433 |
Length: | 6.6 Miles | Actual: | $6,878,438 |
District: | Wichita Falls | Let Date: | APR 2002 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | NH 2001(629) | CSJ: | 0043-08-067 |
Description: | FULL - DEPTH CRCP OVERLAY | Handling Code: |
|
Limits From: | SH 25 | Fund Cat: | 1 |
Limits To: | BUS 287H (SBL) | Estimate: | $6,318,858 |
Length: | 6.6 Miles | Actual: | $5,516,279 |
Back... |
Totals for 0043-08-066 | ||
---|---|---|---|
Length: | 13.2 Miles | ||
Estimate: | $14,032,291 | ||
Actual: | $12,394,717 | ||
CCSJ: 0043-09-102 | |||
District: | Wichita Falls | Let Date: | AUG 2002 |
Highway: | IH 44 | Let Status: | Actual |
Project ID: | IM 44-8(12) | CSJ: | 0043-09-102 |
Description: | REHABILITATION OF EXISTING ROAD | Handling Code: |
|
Limits From: | 0.4 MI NORTH OF WICHITA RIVER | Fund Cat: | 1 |
Limits To: | NEAR US 287 | Estimate: | $2,385,881 |
Length: | 2.1 Miles | Actual: | $1,786,661 |
District: | Wichita Falls | Let Date: | AUG 2002 |
Highway: | IH 44 | Let Status: | Actual |
Project ID: | IM 44-8(12) | CSJ: | 0156-07-098 |
Description: | ASPHALTIC CONCRETE PAVEMENT OVERLAY | Handling Code: |
|
Limits From: | US 287 | Fund Cat: | 1 |
Limits To: | NEAR GILBERT CREEK | Estimate: | $5,254,181 |
Length: | 8.9 Miles | Actual: | $4,874,741 |
District: | Wichita Falls | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 44-8(12) | CSJ: | 0903-03-068 |
Description: | BRIDGE SEAL AND JOINT REPAIR | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS ON IH 44 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $246,428 |
Length: | 11.5 Miles | Actual: | $344,182 |
District: | Wichita Falls | Let Date: | AUG 2002 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 35-7(49) | CSJ: | 0903-15-070 |
Description: | BRIDGE SEAL AND JOINT REPAIR | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS ON IH 35 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $110,337 |
Length: | 14.2 Miles | Actual: | $98,630 |
Bid Tabulations Award Status Back... |
Totals for 0043-09-102 | ||
Length: | 36.7 Miles | ||
Estimate: | $7,996,827 | ||
Actual: | $7,104,214 | ||
CCSJ: 0043-17-022 | |||
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | BU 287J | Let Status: | Actual |
Project ID: | CPM 43-17-22 | CSJ: | 0043-17-022 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 368 | Fund Cat: | 1 |
Limits To: | IH 44 | Estimate: | $717,756 |
Length: | 9.1 Miles | Actual: | $543,382 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | BU 287F | Let Status: | Actual |
Project ID: | CPM 43-20-12 | CSJ: | 0043-20-012 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | LP 488 | Fund Cat: | 1 |
Limits To: | US 70 | Estimate: | $32,801 |
Length: | 0.7 Miles | Actual: | $33,972 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 1949 | Let Status: | Actual |
Project ID: | CPM 43-21-5 | CSJ: | 0043-21-005 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 287 SB FRONTAGE ROAD | Fund Cat: | 1 |
Limits To: | BU 287F | Estimate: | $5,151 |
Length: | 0.4 Miles | Actual: | $5,471 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | BU 287J | Let Status: | Actual |
Project ID: | CPM 44-10-9 | CSJ: | 0044-10-009 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | LP 473 | Fund Cat: | 1 |
Limits To: | HINES STREET IN WICHITA FALLS | Estimate: | $42,153 |
Length: | 1.0 Miles | Actual: | $43,468 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | US 183 | Let Status: | Actual |
Project ID: | CPM 124-4-32 | CSJ: | 0124-04-032 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 5.163 MILES SOUTH OF VERNON CITY LIMITS | Fund Cat: | 1 |
Limits To: | BAYLOR COUNTY LINE | Estimate: | $280,228 |
Length: | 16.9 Miles | Actual: | $304,796 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | US 183 | Let Status: | Actual |
Project ID: | CPM 124-5-26 | CSJ: | 0124-05-026 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | WILBARGER COUNTY LINE | Fund Cat: | 1 |
Limits To: | US 82 AT MABELLE | Estimate: | $224,883 |
Length: | 11.9 Miles | Actual: | $244,205 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | SH 25 | Let Status: | Actual |
Project ID: | CPM 137-4-14 | CSJ: | 0137-04-014 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | WICHITA COUNTY LINE | Fund Cat: | 1 |
Limits To: | US 82 | Estimate: | $71,169 |
Length: | 4.4 Miles | Actual: | $78,688 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | LP 488 | Let Status: | Actual |
Project ID: | CPM 146-9-7 | CSJ: | 0146-09-007 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | BU 287F | Fund Cat: | 1 |
Limits To: | STADIUM DRIVE IN VERNON | Estimate: | $22,278 |
Length: | 0.5 Miles | Actual: | $23,261 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | CPM 156-4-90 | CSJ: | 0156-04-090 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | KEMP STREET IN WICHITA FALLS | Fund Cat: | 1 |
Limits To: | END OF ASPHALT | Estimate: | $60,175 |
Length: | 1.9 Miles | Actual: | $63,309 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | CPM 156-6-42 | CSJ: | 0156-06-042 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 82 IN SEYMOUR | Fund Cat: | 1 |
Limits To: | ARCHER COUNTY LINE | Estimate: | $539,022 |
Length: | 20.6 Miles | Actual: | $576,819 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | SP 447 | Let Status: | Actual |
Project ID: | CPM 156-12-16 | CSJ: | 0156-12-016 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 287 | Fund Cat: | 1 |
Limits To: | SH 240 | Estimate: | $37,404 |
Length: | 2.0 Miles | Actual: | $38,159 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | SH 79 | Let Status: | Actual |
Project ID: | CPM 283-4-25 | CSJ: | 0283-04-025 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | PLUM STREET IN ARCHER CITY | Fund Cat: | 1 |
Limits To: | ANARENE | Estimate: | $206,592 |
Length: | 7.8 Miles | Actual: | $219,883 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 2179 | Let Status: | Actual |
Project ID: | CPM 529-2-9 | CSJ: | 0529-02-009 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 380 | Fund Cat: | 1 |
Limits To: | INCLUDING CLIFF DRIVE IN GRAHAM | Estimate: | $38,753 |
Length: | 1.0 Miles | Actual: | $40,566 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 367 | Let Status: | Actual |
Project ID: | CPM 681-4-31 | CSJ: | 0681-04-031 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 25 | Fund Cat: | 1 |
Limits To: | FM 368 | Estimate: | $148,802 |
Length: | 10.9 Miles | Actual: | $159,011 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 370 | Let Status: | Actual |
Project ID: | CPM 821-3-13 | CSJ: | 0821-03-013 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 70 | Fund Cat: | 1 |
Limits To: | FM 1763 | Estimate: | $41,793 |
Length: | 3.8 Miles | Actual: | $44,310 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 210 | Let Status: | Actual |
Project ID: | CPM 824-1-27 | CSJ: | 0824-01-027 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 114 | Fund Cat: | 1 |
Limits To: | FM 422 | Estimate: | $133,928 |
Length: | 10.2 Miles | Actual: | $142,384 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 923 | Let Status: | Actual |
Project ID: | CPM 982-4-10 | CSJ: | 0982-04-010 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 380 | Fund Cat: | 1 |
Limits To: | US 183/283 | Estimate: | $108,062 |
Length: | 8.4 Miles | Actual: | $115,213 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 578 | Let Status: | Actual |
Project ID: | CPM 1031-6-6 | CSJ: | 1031-06-006 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 79 | Fund Cat: | 1 |
Limits To: | US 380 | Estimate: | $85,487 |
Length: | 7.0 Miles | Actual: | $90,780 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 209 | Let Status: | Actual |
Project ID: | CPM 1076-2-38 | CSJ: | 1076-02-038 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 3109 | Fund Cat: | 1 |
Limits To: | SH 67 | Estimate: | $122,601 |
Length: | 9.3 Miles | Actual: | $130,987 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 1152 | Let Status: | Actual |
Project ID: | CPM 1297-1-12 | CSJ: | 1297-01-012 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 277 SOUTH AND WEST | Fund Cat: | 1 |
Limits To: | US 277 IN BOMARTON | Estimate: | $128,197 |
Length: | 10.2 Miles | Actual: | $136,415 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 1763 | Let Status: | Actual |
Project ID: | CPM 1355-1-17 | CSJ: | 1355-01-017 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 287 | Fund Cat: | 1 |
Limits To: | US 183 | Estimate: | $171,920 |
Length: | 13.3 Miles | Actual: | $183,133 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 1711 | Let Status: | Actual |
Project ID: | CPM 1613-1-9 | CSJ: | 1613-01-009 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 79 IN ELBERT | Fund Cat: | 1 |
Limits To: | END OF PAVEMENT | Estimate: | $43,702 |
Length: | 3.5 Miles | Actual: | $46,451 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 1711 | Let Status: | Actual |
Project ID: | CPM 1613-2-7 | CSJ: | 1613-02-007 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 380 | Fund Cat: | 1 |
Limits To: | SH 79 IN ELBERT | Estimate: | $93,811 |
Length: | 7.5 Miles | Actual: | $99,825 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 1769 | Let Status: | Actual |
Project ID: | CPM 1711-1-23 | CSJ: | 1711-01-023 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 16 IN MARKLEY | Fund Cat: | 1 |
Limits To: | SH 114 IN JEAN | Estimate: | $183,835 |
Length: | 14.4 Miles | Actual: | $195,967 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 1763 | Let Status: | Actual |
Project ID: | CPM 1769-1-10 | CSJ: | 1769-01-010 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 287 NB FRONTAGE ROAD | Fund Cat: | 1 |
Limits To: | US 70 | Estimate: | $101,864 |
Length: | 8.9 Miles | Actual: | $108,271 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 1954 | Let Status: | Actual |
Project ID: | CPM 1837-1-10 | CSJ: | 1837-01-010 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 368 | Fund Cat: | 1 |
Limits To: | SH 79 | Estimate: | $134,983 |
Length: | 8.9 Miles | Actual: | $143,289 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 1954 | Let Status: | Actual |
Project ID: | CPM 1837-2-11 | CSJ: | 1837-02-011 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 79 | Fund Cat: | 1 |
Limits To: | CLAY COUNTY LINE | Estimate: | $101,706 |
Length: | 7.4 Miles | Actual: | $108,893 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 1954 | Let Status: | Actual |
Project ID: | CPM 1837-3-10 | CSJ: | 1837-03-010 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | CLAY COUNTY LINE | Fund Cat: | 1 |
Limits To: | PARK ROAD | Estimate: | $64,492 |
Length: | 3.8 Miles | Actual: | $71,479 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 2326 | Let Status: | Actual |
Project ID: | CPM 2215-1-7 | CSJ: | 2215-01-007 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1811 | Fund Cat: | 1 |
Limits To: | WICHITA COUNTY LINE | Estimate: | $88,731 |
Length: | 7.0 Miles | Actual: | $94,570 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 1949 | Let Status: | Actual |
Project ID: | CPM 2216-1-6 | CSJ: | 2216-01-006 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | BU 287F | Fund Cat: | 1 |
Limits To: | FM 433 | Estimate: | $44,325 |
Length: | 3.5 Miles | Actual: | $47,202 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 2384 | Let Status: | Actual |
Project ID: | CPM 2323-1-13 | CSJ: | 2323-01-013 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1739 | Fund Cat: | 1 |
Limits To: | FM 367 | Estimate: | $132,337 |
Length: | 10.5 Miles | Actual: | $140,647 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 890 | Let Status: | Actual |
Project ID: | CPM 2582-1-14 | CSJ: | 2582-01-014 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | IH 44 | Fund Cat: | 1 |
Limits To: | FM 171 | Estimate: | $63,027 |
Length: | 2.7 Miles | Actual: | $67,890 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 3109 | Let Status: | Actual |
Project ID: | CPM 3149-2-9 | CSJ: | 3149-02-009 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 209 | Fund Cat: | 1 |
Limits To: | FM 1974 | Estimate: | $120,747 |
Length: | 9.0 Miles | Actual: | $129,227 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 1954 | Let Status: | Actual |
Project ID: | CPM 3496-1-8 | CSJ: | 3496-01-008 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | PARK ROAD | Fund Cat: | 1 |
Limits To: | FM 2393 | Estimate: | $38,482 |
Length: | 3.0 Miles | Actual: | $40,972 |
District: | Wichita Falls | Let Date: | NOV 2001 |
Highway: | FM 3492 | Let Status: | Actual |
Project ID: | CPM 3553-1-4 | CSJ: | 3553-01-004 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 369 | Fund Cat: | 1 |
Limits To: | IH 44 | Estimate: | $67,965 |
Length: | 3.6 Miles | Actual: | $73,693 |
Back... |
Totals for 0043-17-022 | ||
Length: | 245.0 Miles | ||
Estimate: | $4,499,162 | ||
Actual: | $4,586,588 | ||
CCSJ: 0137-03-035 | |||
District: | Wichita Falls | Let Date: | AUG 2002 |
Highway: | SH 25 | Let Status: | Actual |
Project ID: | BR 2002(308) | CSJ: | 0137-03-035 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | AT BEAVER CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $864,432 |
Length: | 0.1 Miles | Actual: | $844,705 |
District: | Wichita Falls | Let Date: | AUG 2002 |
Highway: | SH 25 | Let Status: | Actual |
Project ID: | BR 2002(308) | CSJ: | 0137-05-026 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | AT LITTLE WICHITA RIVER | Fund Cat: | 6 |
Limits To: | . | Estimate: | $1,091,753 |
Length: | 0.2 Miles | Actual: | $1,077,112 |
Bid Tabulations Award Status Back... |
Totals for 0137-03-035 | ||
Length: | 0.3 Miles | ||
Estimate: | $1,956,185 | ||
Actual: | $1,921,817 | ||
CCSJ: 0156-07-094 | |||
District: | Wichita Falls | Let Date: | FEB 2002 |
Highway: | IH 44 | Let Status: | Actual |
Project ID: | IM 44-8(11) | CSJ: | 0156-07-094 |
Description: | UPGRADE UNDERGROUND ILLUMINATION ON EXISTING ILLUMINAITION | Handling Code: |
|
Limits From: | NEAR SP 383 | Fund Cat: | 1 |
Limits To: | NEAR FM 3492 | Estimate: | $294,953 |
Length: | 7.8 Miles | Actual: | $243,245 |
District: | Wichita Falls | Let Date: | FEB 2002 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-7(48) | CSJ: | 0194-02-078 |
Description: | SAFETY ILLUMINATION | Handling Code: |
|
Limits From: | AT OKLAHOMA STATE LINE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $55,903 |
Length: | 0.4 Miles | Actual: | $51,410 |
District: | Wichita Falls | Let Date: | FEB 2002 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | IM 35-7(48) | CSJ: | 0195-01-086 |
Description: | SAFETY ILLUMINATION | Handling Code: |
|
Limits From: | AT FM 922 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $88,570 |
Length: | 0.0 Miles | Actual: | $69,502 |
Back... |
Totals for 0156-07-094 | ||
Length: | 8.2 Miles | ||
Estimate: | $439,426 | ||
Actual: | $364,157 | ||
CCSJ: 0156-14-015 | |||
District: | Wichita Falls | Let Date: | APR 2002 |
Highway: | BU 277A | Let Status: | Actual |
Project ID: | STP 2002(341)R | CSJ: | 0156-14-015 |
Description: | WIDEN, IMPROVE SHOULDERS AND DRAINAGE | Handling Code: |
|
Limits From: | IN WICHITA FALLS, NEAR LOOP 11 | Fund Cat: | 1 |
Limits To: | NEAR MCNIEL ST | Estimate: | $3,221,913 |
Length: | 2.2 Miles | Actual: | $3,312,470 |
District: | Wichita Falls | Let Date: | APR 2002 |
Highway: | BU 277A | Let Status: | Actual |
Project ID: | STP 2002(341)R | CSJ: | 0156-14-020 |
Description: | INSTALL TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | IN WICHITA FALLS, AT TANGLEWOOD | Fund Cat: | 1 |
Limits To: | . | Estimate: | $74,681 |
Length: | 0.0 Miles | Actual: | $63,859 |
Back... |
Totals for 0156-14-015 | ||
Length: | 2.2 Miles | ||
Estimate: | $3,296,594 | ||
Actual: | $3,376,329 | ||
CCSJ: 0249-01-033 | |||
District: | Wichita Falls | Let Date: | APR 2002 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2002(90)UM | CSJ: | 0249-01-033 |
Description: | CONCRETE OVERLAY | Handling Code: |
|
Limits From: | NEAR ARCHER COUNTY LINE | Fund Cat: | 1 |
Limits To: | END OF HOLLIDAY CREEK BRIDGE | Estimate: | $4,393,760 |
Length: | 3.7 Miles | Actual: | $5,104,323 |
Back... |
Totals for 0249-01-033 | ||
Length: | 3.7 Miles | ||
Estimate: | $4,393,760 | ||
Actual: | $5,104,323 | ||
CCSJ: 0802-02-057 | |||
District: | Wichita Falls | Let Date: | JUL 2002 |
Highway: | FM 369 | Let Status: | Actual |
Project ID: | STP 2002(663)UM | CSJ: | 0802-02-057 |
Description: | REHABILITATION OF EXISTING ROAD | Handling Code: |
|
Limits From: | IN WICHITA FALLS, FROM NEAR FM 2650 | Fund Cat: | 11 |
Limits To: | NEAR RHEA ROAD | Estimate: | $1,846,898 |
Length: | 2.9 Miles | Actual: | $2,060,557 |
Back... |
Totals for 0802-02-057 | ||
Length: | 2.9 Miles | ||
Estimate: | $1,846,898 | ||
Actual: | $2,060,557 | ||
CCSJ: 0903-03-062 | |||
District: | Wichita Falls | Let Date: | JUL 2002 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2001(218)OX | CSJ: | 0903-03-062 |
Description: | BRIDGE REPLACEMENT | Handling Code: |
|
Limits From: | CR 158 AT CHINA CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $332,161 |
Length: | 0.1 Miles | Actual: | $356,299 |
District: | Wichita Falls | Let Date: | JUL 2002 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2002(86)OX | CSJ: | 0903-03-066 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | ON CR 345 AT WICHITA RIVER | Fund Cat: | 6 |
Limits To: | . | Estimate: | $621,811 |
Length: | 0.1 Miles | Actual: | $429,449 |
District: | Wichita Falls | Let Date: | JUL 2002 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2002(9)OX | CSJ: | 0903-29-013 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | CR 328 AT LITTLE WICHITA RIVER | Fund Cat: | 6 |
Limits To: | . | Estimate: | $286,504 |
Length: | 0.1 Miles | Actual: | $223,453 |
Back... |
Totals for 0903-03-062 | ||
Length: | 0.3 Miles | ||
Estimate: | $1,240,476 | ||
Actual: | $1,009,201 | ||
CCSJ: 0903-03-067 | |||
District: | Wichita Falls | Let Date: | JAN 2002 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2001(938)RXH | CSJ: | 0903-03-067 |
Description: | UPGRADE RRX WARNING DEVICES | Handling Code: |
XX |
Limits From: | UNION PACIFIC, DOT#415461H ON JEFFERSON | Fund Cat: | 8 |
Limits To: | STREET IN WICHITA FALLS | Estimate: | $160,000 |
Length: | 0.0 Miles | Actual: | $160,000 |
Back... |
Totals for 0903-03-067 | ||
Length: | 0.0 Miles | ||
Estimate: | $160,000 | ||
Actual: | $160,000 |