Letting Schedule for February, 2002 (FY 2002)

Texas Department of Transportation Logo (Registered Trademark)
 
 
Last Update: Thursday, September 5, 2002
 
Updated from Design & Construction Information System (DCIS) on: August 30, 2002
February, 2002 (FY 2002) (see Links)
SEP 2001 | OCT 2001 | NOV 2001 | DEC 2001 | JAN 2002 | FEB 2002 | MAR 2002 | APR 2002 | MAY 2002 | JUN 2002 | JUL 2002 | AUG 2002
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0113-06-023 Blanco/
Austin
US 290 Actual $2,115,558 1 RESURFACING
0010-13-074 Bowie/
Atlanta
US 67 Actual $757,134 8 IMPROVE TRAFFIC SIGNALS & INTERCONNECT
0218-01-074 Bowie/
Atlanta
US 59 Actual $1,027,991 1 RESTORE PAVEMENT DAMAGED BY MOISTURE INFILTRATION
0919-19-038 Bowie/
Atlanta
VA Actual $313,657 13D RECONSTRUCT EXISTING CITY STREET
1003-01-082 Brazoria/
Houston
FM 523 Actual $2,007,326 1 ACP OVERLAY, STRUCTURE AND PAVEMENT
0303-03-037 Briscoe/
Childress
SH 86 Actual $1,107,231 11 SAFETY TREAT DRAINAGE STRUCTURES & WIDEN
0946-01-019 Cass/
Atlanta
FM 250 Actual $1,889,801 6 REPLACE 2 BRIDGES AND APPROACHES ON 2 LANE HIGHWAY
0199-01-069 Cherokee/
Tyler
US 69 Actual $41,143 8 INTERCONNECT TRAFFIC SIGNALS
0442-02-130 Dallas/
Dallas
IH 35E Actual $230,176 1 GUIDE SIGN REFURBISHING
0918-45-371 Dallas/
Dallas
CS Actual $80,000 5 TRAFFIC SIGNAL UPGRADE
0918-46-126 Denton/
Dallas
VA Actual $566,744 5 ATMS - TRAFFIC SIGNAL IMPROVEMENT PHASE
0300-03-050 Dimmit/
Laredo
US 277 Actual $3,569,178 1 FOR THE REHABILITATION OF AN EXISTING ROAD CONSISTING OF
0906-00-092 Ector/
Odessa
VA Actual $53,391 1 REPLACE MILE POSTS ON BOTH IH 10 & IH 20
2552-03-032 El Paso/
El Paso
LP 375 Actual $10,675,766 12 CONSTRUCT INTERCHANGE
0045-06-047 Fannin/
Paris
SH 56 Actual $592,500 10 UPGRADE EXISTING TRAFFIC SIGNAL
0549-01-027 Fannin/
Paris
SH 121 Actual $4,590,550 1 REHAB EXIST ROAD
0913-28-038 Fayette/
Yoakum
CR Actual $481,613 6 REPLACE BRIDGE AND APPROACHES
0192-01-063 Fort Bend/
Houston
SH 6 Actual $16,091,646 4 WIDEN TO 6 - LANE DIVIDED RURAL SECTION
0190-01-019 Franklin/
Paris
SH 37 Actual $8,607,348 11 RECONSTRUCT AND WIDEN EXISTING ROADWAY TO 5 LANE
0675-01-039 Freestone/
Bryan
IH 45 Actual $416,097 1 MISCELLANEOUS WORK CONSISTING OF PLACING THERMOPLASTIC
0558-01-007 Garza/
Lubbock
FM 669 Actual $98,180 1 MISCELLANEOUS CONSTRUCTION
0138-01-072 Gregg/
Tyler
SH 31 Actual $11,441,460 1 REPLACE BRIDGES AND APPROACHES
0098-01-032 Hardeman/
Childress
SH 6 Actual $2,430,630 11 SAFETY TREAT DRAINAGE STRUCTURES & WIDEN
0271-17-140 Harris/
Houston
IH 610 Actual $869,884 1 HIGH MAST LIGHTING
0113-07-040 Hays/
Austin
US 290 Actual $2,749,034 1 RECONST TO 5 - LN URBAN RDWY
1064-01-020 Hidalgo/
Pharr
FM 676 Actual $1,013,130 1 INSTALLING TRAFFIC SIGNAL
0401-01-019 Hopkins/
Paris
SH 154 Actual $3,801,247 11 RECONSTRUCT AND WIDEN TO 5 - LANE URBAN SECTION
0064-07-035 Jasper/
Beaumont
US 96 Actual $181,371 8 CHANNELIZATION, INSTALL INTERSECTION FLASHING BEACON AND
0024-04-057 Medina/
San Antonio
US 90 Actual $4,890,000 9 CONSTRUCT SAFETY REST AREA
1210-03-023 Milam/
Bryan
FM 979 Actual $687,745 1 REHABILITATION OF EXISTING ROAD CONSISTING OF EXTEND EXIST
0118-06-054 Nacogdoches/
Lufkin
SH 21 Actual $1,694,939 1 DEEP BASE REPAIRS, MILL, INLAY, SEAL, & OVERLAY
0090-03-051 Oldham/
Amarillo
IH 40 Actual $35,801,494 1 CONCRETE UPGRADE
0007-08-024 Palo Pinto/
Fort Worth
SH 16 Actual   1 SEAL COST
0063-03-050 Panola/
Atlanta
US 59 Actual $1,374,717 1 RESURFACE EXIST. 4 - LANE DIVIDED HIGHWAY
0063-11-039 Panola/
Atlanta
US 79 Actual $19,875,922 1 UPGRADE EXISTING 2 - LANE LOOP TO 4 - LANE DIVIDED
0008-09-028 Parker/
Fort Worth
FM 1187 Actual $324,397 10 INSTALL LEFT TURN LANE AND RIGHT TURN LANE FOR SERVICE TO
0648-01-021 Robertson/
Bryan
FM 50 Actual $423,146 1 REHABILITATE EXISTING ROAD CONSISTING OF EXTEND EXISTING
0902-48-480 Tarrant/
Fort Worth
VA Actual $309,120 5 TRAFFIC SIGNAL IMPROVEMENTS
1330-01-052 Tarrant/
Fort Worth
FM 1187 Actual $1,957,264 1 WIDEN TO INCLUDE CONTINUOUS LEFT TURN LANE
1603-03-026 Tarrant/
Fort Worth
FM 1709 Actual $80,179 10 TRAFFIC SIGNAL
0077-06-076 Tom Green/
San Angelo
US 67 Actual $20,433,674 11 CONSTRUCT FREEWAY MAIN LANES (STAGE CONSTRUCTION)
0248-05-035 Upshur/
Atlanta
US 271 Actual $7,948,338 1 RECONSTRUCT 4 LANE DIVIDED URBAN FACILITY
0392-02-067 Upshur/
Atlanta
US 259 Actual $2,633,485 1 ADD SHOULDERS TO EXISTING 4 - LANE DIVIDED RURAL HIGHWAY
0913-09-031 Wharton/
Yoakum
CR Actual $110,520 6 REPLACE BRIDGE AND APPROACHES
0156-07-094 Wichita/
Wichita Falls
IH 44 Actual $364,157 1 UPGRADE UNDERGROUND ILLUMINATION ON EXISTING ILLUMINAITION
1378-06-008 Williamson/
Austin
FM 3406 Actual $792,985 11 UPGRADE TO 5 LANE SECTION
0037-02-043 Zavala/
Laredo
US 83 Actual $2,525,097 8 MOD. BRIDGERAIL AND APPROACH, INSTALL PROTECTION AND


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract