Detail Letting Schedule for Harrison County (FY 2006)
Detail Letting Schedule for Harrison County (FY 2006) | ||||
Last Update: Monday, August 28, 2006 |
Harrison County (FY 2006) |
CCSJ: 0062-07-077 | |||
District: | Atlanta | Let Date: | DEC 2005 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | STP 2006(193)SFT | CSJ: | 0062-07-077 |
Description: | SAFETY TREAT FIXED OBJECTS, INSTALL PROTECTION & MODERNIZE | Handling Code: |
|
Limits From: | MARION CO LINE | Fund Cat: | 8 |
Limits To: | US 80 | Estimate: | $661,302 |
Length: | 11.6 Miles | Actual: | $668,472 |
Back... |
Totals for 0062-07-077 | ||
---|---|---|---|
Length: | 11.6 Miles | ||
Estimate: | $661,302 | ||
Actual: | $668,472 | ||
CCSJ: 0062-07-078 | |||
District: | Atlanta | Let Date: | FEB 2006 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | STP 2006(277)SFT | CSJ: | 0062-07-078 |
Description: | INSTALL SAFETY LIGHTING | Handling Code: |
|
Limits From: | SH 43 NORTH | Fund Cat: | 8 |
Limits To: | US 80 | Estimate: | $182,535 |
Length: | 0.2 Miles | Actual: | $186,445 |
District: | Atlanta | Let Date: | FEB 2006 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | STP 2006(277)SFT | CSJ: | 0063-01-075 |
Description: | INSTALL SAFETY LIGHTING | Handling Code: |
|
Limits From: | US 80 | Fund Cat: | 8 |
Limits To: | IH 20 | Estimate: | $554,488 |
Length: | 4.0 Miles | Actual: | $546,172 |
District: | Atlanta | Let Date: | FEB 2006 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2006(280) | CSJ: | 0063-01-078 |
Description: | INSTALL SAFETY LIGHTING | Handling Code: |
|
Limits From: | IH 20 | Fund Cat: | 1 |
Limits To: | 0.31 MI S OF IH 20 | Estimate: | $22,423 |
Length: | 0.3 Miles | Actual: | $25,182 |
Back... |
Totals for 0062-07-078 | ||
Length: | 4.5 Miles | ||
Estimate: | $759,446 | ||
Actual: | $757,799 | ||
CCSJ: 0096-07-034 | |||
District: | Atlanta | Let Date: | AUG 2006 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | BR 2003(292) | CSJ: | 0096-07-034 |
Description: | REHAB BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | AT LOOP 281 UNDERPASS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $2,446,899 |
Length: | 0.0 Miles | Actual: | $3,172,358 |
District: | Atlanta | Let Date: | AUG 2006 |
Highway: | LP 281 | Let Status: | Actual |
Project ID: | STP 2006(789) | CSJ: | 2642-02-016 |
Description: | REPLACE DEFICIENT BRIDGE RAIL | Handling Code: |
|
Limits From: | AT UNION PACIFIC RR OVERPASS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $103,414 |
Length: | 0.0 Miles | Actual: | $103,815 |
Bid Tabulations Award Status Back... |
Totals for 0096-07-034 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,550,313 | ||
Actual: | $3,276,173 | ||
CCSJ: 0208-04-011 | |||
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 2198 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 0208-04-011 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | SH 43 | Fund Cat: | 8 |
Limits To: | 4.9 MI E OF SH 43 | Estimate: | $429,753 |
Length: | 4.9 Miles | Actual: | $477,132 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 0223-01-030 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | 0.3 MI E OF FM 248 | Fund Cat: | 8 |
Limits To: | KITCHENS CREEK | Estimate: | $766,648 |
Length: | 8.8 Miles | Actual: | $868,790 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 0223-02-006 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | KITCHENS CREEK | Fund Cat: | 8 |
Limits To: | FM 727 | Estimate: | $842,582 |
Length: | 6.9 Miles | Actual: | $940,897 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 727 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 0812-03-011 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | 5.6 MI S OF SH 49 | Fund Cat: | 8 |
Limits To: | SH 49 | Estimate: | $427,050 |
Length: | 5.6 Miles | Actual: | $472,215 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 805 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 1101-01-012 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | SH 49 | Fund Cat: | 8 |
Limits To: | CR 3410 | Estimate: | $200,730 |
Length: | 2.1 Miles | Actual: | $216,850 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 1793 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 1759-01-010 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | US 59 | Fund Cat: | 1 |
Limits To: | 5.0 MI. S. OF FM 134 | Estimate: | $362,701 |
Length: | 5.1 Miles | Actual: | $414,088 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 726 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 1895-01-023 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | FM 1972 | Fund Cat: | 1 |
Limits To: | HARRISON COUNTY LINE | Estimate: | $263,715 |
Length: | 3.8 Miles | Actual: | $288,830 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 726 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 1895-02-009 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | MARION COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 450 | Estimate: | $183,308 |
Length: | 2.6 Miles | Actual: | $207,986 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 726 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 1895-03-017 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | FM 729 | Fund Cat: | 1 |
Limits To: | HARRISON COUNTY LINE | Estimate: | $718,018 |
Length: | 9.2 Miles | Actual: | $765,131 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 726 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 1895-04-009 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | UPSHUR COUNTY LINE | Fund Cat: | 8 |
Limits To: | FM 450 | Estimate: | $250,112 |
Length: | 3.1 Miles | Actual: | $281,819 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 1997 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 1919-02-032 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | 0.2 MI. N. OF LP 390 | Fund Cat: | 8 |
Limits To: | US 59 | Estimate: | $819,964 |
Length: | 10.4 Miles | Actual: | $908,574 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 1999 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 1921-02-012 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | FM 134 | Fund Cat: | 8 |
Limits To: | LOUISIANA STATE LINE | Estimate: | $424,313 |
Length: | 5.4 Miles | Actual: | $471,388 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 9 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 2340-01-008 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | FM 1999 | Fund Cat: | 8 |
Limits To: | 5.0 MI. N. OF FM 1999 | Estimate: | $390,917 |
Length: | 5.0 Miles | Actual: | $443,869 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 2682 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 2684-01-009 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | FM 134 | Fund Cat: | 8 |
Limits To: | SH 43 | Estimate: | $267,517 |
Length: | 2.8 Miles | Actual: | $302,916 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 2879 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 2880-01-018 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | FM 2208 | Fund Cat: | 8 |
Limits To: | FM 449 | Estimate: | $369,259 |
Length: | 4.4 Miles | Actual: | $408,106 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 3001 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 3041-02-015 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | FM 726 | Fund Cat: | 8 |
Limits To: | HARRISON COUNTY LINE | Estimate: | $567,095 |
Length: | 6.6 Miles | Actual: | $634,613 |
District: | Atlanta | Let Date: | NOV 2005 |
Highway: | FM 3001 | Let Status: | Actual |
Project ID: | STP 2006(034)SFT | CSJ: | 3041-03-010 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | MARION COUNTY LINE | Fund Cat: | 8 |
Limits To: | FM 1997 | Estimate: | $226,868 |
Length: | 3.1 Miles | Actual: | $253,111 |
Back... |
Totals for 0208-04-011 | ||
Length: | 89.8 Miles | ||
Estimate: | $7,510,550 | ||
Actual: | $8,356,315 | ||
CCSJ: 0402-03-035 | |||
District: | Atlanta | Let Date: | MAR 2006 |
Highway: | SH 154 | Let Status: | Actual |
Project ID: | SFT 402-3-35 | CSJ: | 0402-03-035 |
Description: | SAFETY TREAT FIXED OBJECTS, WIDEN LANES & CONSTRUCT PAVED | Handling Code: |
|
Limits From: | UPSHUR COUNTY LINE | Fund Cat: | 8 |
Limits To: | FM 450 | Estimate: | $897,503 |
Length: | 7.8 Miles | Actual: | $1,159,554 |
Back... |
Totals for 0402-03-035 | ||
Length: | 7.8 Miles | ||
Estimate: | $897,503 | ||
Actual: | $1,159,554 | ||
CCSJ: 0402-05-002 | |||
District: | Atlanta | Let Date: | AUG 2006 |
Highway: | LP 390 | Let Status: | Actual |
Project ID: | HP 2006(810) | CSJ: | 0402-05-002 |
Description: | CONSTRUCT 4 - LANE URBAN SECTION WITH 14' FLUSH MEDIAN ON | Handling Code: |
|
Limits From: | SH 43 | Fund Cat: | 4 |
Limits To: | 0.2 MI S OF W UNIV. AVE IN MARSHALL | Estimate: | $3,287,229 |
Length: | 0.6 Miles | Actual: | $3,760,109 |
District: | Atlanta | Let Date: | AUG 2006 |
Highway: | LP 390 | Let Status: | Actual |
Project ID: | STP 2006(753) | CSJ: | 0402-05-006 |
Description: | REHABILITATION OF EXISTING ROADWAY | Handling Code: |
|
Limits From: | 0.2 MI S OF W UNIVERSITY AVE | Fund Cat: | 1 |
Limits To: | US 80 IN MARSHALL | Estimate: | $428,293 |
Length: | 1.1 Miles | Actual: | $507,213 |
Bid Tabulations Award Status Back... |
Totals for 0402-05-002 | ||
Length: | 1.7 Miles | ||
Estimate: | $3,715,522 | ||
Actual: | $4,267,322 | ||
CCSJ: 0495-08-084 | |||
District: | Atlanta | Let Date: | OCT 2005 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | CPM 495-8-84 | CSJ: | 0495-08-084 |
Description: | CONCRETE PAVEMENT REPAIR, FOG SEAL, REMOVE AND REPLACE CHAIN | Handling Code: |
|
Limits From: | GREGG COUNTY LINE | Fund Cat: | 1 |
Limits To: | 0.5 MI. W. OF SH 43 | Estimate: | $1,709,347 |
Length: | 16.9 Miles | Actual: | $1,347,455 |
District: | Atlanta | Let Date: | OCT 2005 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | CPM 495-9-47 | CSJ: | 0495-09-047 |
Description: | CONCRETE PAVEMENT REPAIR, FOG SEAL, REMOVE AND REPLACE | Handling Code: |
|
Limits From: | 0.5 MI. W. OF SH 43 | Fund Cat: | 1 |
Limits To: | E. END OF EIGHT MILE CREEK BRIDGE | Estimate: | $412,519 |
Length: | 6.8 Miles | Actual: | $367,087 |
District: | Atlanta | Let Date: | OCT 2005 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | CPM 495-10-77 | CSJ: | 0495-10-077 |
Description: | CONCRETE PAVEMENT REPAIR, FOG SEAL, REMOVE AND REPLACE | Handling Code: |
|
Limits From: | E. END OF EIGHT MILE CREEK BRIDGE | Fund Cat: | 1 |
Limits To: | LOUISIANA STATE LINE | Estimate: | $500,663 |
Length: | 15.5 Miles | Actual: | $526,844 |
Back... |
Totals for 0495-08-084 | ||
Length: | 39.2 Miles | ||
Estimate: | $2,622,529 | ||
Actual: | $2,241,386 | ||
CCSJ: 0632-02-027 | |||
District: | Atlanta | Let Date: | APR 2006 |
Highway: | FM 134 | Let Status: | Actual |
Project ID: | SFT 632-2-27 | CSJ: | 0632-02-027 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | MARION COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 43 | Estimate: | $1,123,393 |
Length: | 8.1 Miles | Actual: | $1,162,904 |
District: | Atlanta | Let Date: | APR 2006 |
Highway: | FM 134 | Let Status: | Actual |
Project ID: | SFT 632-3-39 | CSJ: | 0632-03-039 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | SH 43 | Fund Cat: | 8 |
Limits To: | IH 20 NFR | Estimate: | $2,591,103 |
Length: | 16.3 Miles | Actual: | $2,585,067 |
Back... |
Totals for 0632-02-027 | ||
Length: | 24.4 Miles | ||
Estimate: | $3,714,496 | ||
Actual: | $3,747,971 | ||
CCSJ: 0640-01-041 | |||
District: | Atlanta | Let Date: | JUL 2006 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | SFT 96-9-71 | CSJ: | 0096-09-071 |
Description: | SAFETY TREAT FIXED OBJECTS, ETC. | Handling Code: |
|
Limits From: | FM 1998 | Fund Cat: | 1 |
Limits To: | IH 20 | Estimate: | $1,103,204 |
Length: | 9.5 Miles | Actual: | $1,109,330 |
District: | Atlanta | Let Date: | JUL 2006 |
Highway: | FM 2208 | Let Status: | Actual |
Project ID: | SFT 138-14-10 | CSJ: | 0138-14-010 |
Description: | SAFETY TREAT FIXED OBJECTS, ETC. | Handling Code: |
|
Limits From: | FM 2879 | Fund Cat: | 1 |
Limits To: | FM 449 | Estimate: | $319,773 |
Length: | 5.6 Miles | Actual: | $317,244 |
District: | Atlanta | Let Date: | JUL 2006 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | SFT 207-5-69 | CSJ: | 0207-05-069 |
Description: | SAFETY TREAT FIXED OBJECTS, ETC. | Handling Code: |
|
Limits From: | IH 20 | Fund Cat: | 1 |
Limits To: | WASHINGTON STREET | Estimate: | $537,080 |
Length: | 4.1 Miles | Actual: | $469,630 |
District: | Atlanta | Let Date: | JUL 2006 |
Highway: | FM 31 | Let Status: | Actual |
Project ID: | SFT 640-1-41 | CSJ: | 0640-01-041 |
Description: | SAFETY TREAT FIXED OBJECTS, ETC. | Handling Code: |
|
Limits From: | US 59 | Fund Cat: | 8 |
Limits To: | PANOLA COUNTY LINE | Estimate: | $782,266 |
Length: | 16.6 Miles | Actual: | $741,158 |
District: | Atlanta | Let Date: | JUL 2006 |
Highway: | FM 31 | Let Status: | Actual |
Project ID: | SFT 640-2-23 | CSJ: | 0640-02-023 |
Description: | SAFETY TREAT FIXED OBJECTS, ETC. | Handling Code: |
|
Limits From: | HARRISON COUNTY LINE | Fund Cat: | 8 |
Limits To: | FM 123 | Estimate: | $362,810 |
Length: | 9.4 Miles | Actual: | $346,699 |
District: | Atlanta | Let Date: | JUL 2006 |
Highway: | FM 31 | Let Status: | Actual |
Project ID: | SFT 731-1-44 | CSJ: | 0731-01-044 |
Description: | SAFETY TREAT FIXED OBJECTS, ETC. | Handling Code: |
|
Limits From: | FM 123 | Fund Cat: | 1 |
Limits To: | LOUISIANA STATE LINE | Estimate: | $889,638 |
Length: | 17.3 Miles | Actual: | $826,425 |
District: | Atlanta | Let Date: | JUL 2006 |
Highway: | FM 1794 | Let Status: | Actual |
Project ID: | SFT 1760-1-21 | CSJ: | 1760-01-021 |
Description: | SAFETY TREAT FIXED OBJECTS, ETC. | Handling Code: |
|
Limits From: | SH 43 | Fund Cat: | 1 |
Limits To: | FM 2792 | Estimate: | $553,170 |
Length: | 10.5 Miles | Actual: | $531,917 |
Bid Tabulations Back... |
Totals for 0640-01-041 | ||
Length: | 73.0 Miles | ||
Estimate: | $4,547,941 | ||
Actual: | $4,342,403 | ||
CCSJ: 0640-01-042 | |||
District: | Atlanta | Let Date: | MAR 2006 |
Highway: | FM 31 | Let Status: | Actual |
Project ID: | STP 2006(351) | CSJ: | 0640-01-042 |
Description: | REHABILITATION OF AN EXISTING 2 - LANE ROADWAY | Handling Code: |
|
Limits From: | 0.1 MILE S. OF FM 2625 | Fund Cat: | 1 |
Limits To: | 0.5 MILES NORTH OF FM 451 | Estimate: | $2,339,255 |
Length: | 5.8 Miles | Actual: | $1,776,233 |
Back... |
Totals for 0640-01-042 | ||
Length: | 5.8 Miles | ||
Estimate: | $2,339,255 | ||
Actual: | $1,776,233 | ||
CCSJ: 0919-03-035 | |||
District: | Atlanta | Let Date: | APR 2006 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2002(375) | CSJ: | 0919-03-035 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | ON CR 3810 | Fund Cat: | 6 |
Limits To: | SEWELL CREEK | Estimate: | $170,078 |
Length: | 0.1 Miles | Actual: | $188,201 |
Back... |
Totals for 0919-03-035 | ||
Length: | 0.1 Miles | ||
Estimate: | $170,078 | ||
Actual: | $188,201 |
|
|