Letting Schedule for July, 2006 (FY 2006)
Letting Schedule for July, 2006 (FY 2006) | ||||
Last Update: Monday, August 28, 2006 |
July, 2006 (FY 2006) | (see Links) |
SEP 2005 | OCT 2005 | NOV 2005 | DEC 2005 | JAN 2006 | FEB 2006 | MAR 2006 | APR 2006 | MAY 2006 | JUN 2006 | JUL 2006 | AUG 2006 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0176-08-018 | Angelina/ Lufkin |
FM 324 | Actual | $9,948,421 | 11 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0265-03-036 | Bastrop/ Austin |
SH 71 | Actual | $5,247,991 | 1 | MILL, SEAL, & OVERLAY |
0101-01-057 | Bee/ Corpus Christi |
US 181 | Actual | $35,570,743 | 4 | CONSTRUCT ADDITIONAL 2 LANES |
0658-01-034 | Bexar/ San Antonio |
FM 1535 | Actual | $23,665,527 | ROW | EXPAND 4 TO 6 LANES W / CLTL & BIKE LANE |
2452-02-073 | Bexar/ San Antonio |
LP 1604 | Actual | $1,087,327 | 8 | CONSTRUCT TURNAROUNDS |
0046-06-063 | Bowie/ Atlanta |
US 82 | Actual | $539,383 | 8 | SAFETY TREAT FIXED OBJECTS, INSTALL PROTECTION & MODERNIZE |
0610-07-085 | Bowie/ Atlanta |
IH 30 | Actual | 150,239,453 | 1 | CONVERT FRONTAGE ROADS TO ONE - WAY OPERATIONS, RELOCATE RAMPS |
0912-31-115 | Brazoria/ Houston |
CR | Actual | $2,623,833 | 6 | REPLACE BRIDGE AND APPROACHES |
0506-01-086 | Brazos/ Bryan |
FM 60 | Actual | $120,275 | 10 | FOR THE CONSTRUCTION OF MISC WORK CONSISTING OF_GRADING, |
0925-12-012 | Briscoe/ Childress |
CR | Actual | $583,081 | 6 | REPLACE BRIDGE STRUCTURE |
0054-06-089 | Brown/ Brownwood |
US 67 | Actual | $88,271 | 10 | LANDSCAPE DEVELOPMENT |
0186-02-026 | Burleson/ Bryan |
SH 36 | Actual | $563,039 | 1 | SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF A LEFT |
0286-02-027 | Caldwell/ Austin |
SH 80 | Actual | $1,056,694 | 8 | INSTALL LTL |
0921-06-127 | Cameron/ Pharr |
VA | Actual | $4,934,699 | 9 | CONSTRUCT HIKE AND BIKE FACILITY |
0083-07-035 | Camp/ Atlanta |
SH 11 | Actual | $2,919,370 | 8 | INSTALL LEFT TURN LANE |
0083-08-044 | Camp/ Atlanta |
SH 11 | Actual | $530,040 | 8 | SAFETY TREAT FIXED OBJECTS, INSTALL PROTECTION & MODERNIZE |
0047-14-059 | Collin/ Dallas |
US 75 | Actual | $165,510 | 1 | GUIDE SIGN REFURBISHING |
0281-02-061 | Collin/ Dallas |
SH 78 | Actual | $315,940 | 10 | LANDSCAPE DEVELOPMENT |
0364-04-043 | Collin/ Dallas |
SH 121 | Actual | $22,160,870 | 10 | CONSTRUCT INTERCHANGE AND MAINLANES AT HILLCREST RD |
0918-24-129 | Collin/ Dallas |
CS | Actual | $125,000 | 7 | RESURFACE |
2679-01-014 | Collin/ Dallas |
FM 2514 | Actual | $113,170 | 10 | LANDSCAPE DEVELOPMENT |
1039-01-029 | Comanche/ Brownwood |
FM 1702 | Actual | $1,865,903 | 1 | REPLACE BRIDGE, WIDEN AND SAFETY TREAT STRUCTURES, BASE |
0231-02-051 | Coryell/ Waco |
US 190 | Actual | $386,949 | 8 | IMPROVE TRAFFIC SIGNAL |
0047-07-202 | Dallas/ Dallas |
US 75 | Actual | $314,305 | 1 | REHABILITATE VEHICLE DETECTION SYSTEM AND DYNAMIC MESSAGE |
0196-03-241 | Dallas/ Dallas |
IH 35E | Actual | $168,467 | 1 | INSTALL OVERHEAD SIGN BRIDGE |
0261-03-045 | Dallas/ Dallas |
US 67 | Actual | $736,993 | 6 | REHABILITATE BRIDGE AND APPROACHES |
0918-00-089 | Dallas/ Dallas |
VA | Actual | $2,440,000 | 7 | MOBILITY ASSISTANCE PATROL |
0918-45-638 | Dallas/ Dallas |
VA | Actual | $3,717,000 | 9 | CONSTRUCT HIKE & BIKE TRAIL - 3.49 MILES |
0918-45-659 | Dallas/ Dallas |
CS | Actual | $2,220,657 | 6 | REPL BRIDGE AND APPROACHES |
0918-45-719 | Dallas/ Dallas |
CS | Actual | $1,305,410 | 5 | INTERSECTION AND SIGNAL IMPROVEMENT |
0918-45-778 | Dallas/ Dallas |
VA | Actual | $438,053 | 1 | SPECIALTY PAVEMENT MARKINGS ON ALL STATE FACILITIES IN SEAO |
0718-01-050 | Denton/ Dallas |
FM 156 | Actual | $9,649,001 | 6 | ADD 10' SHOULDERS AND REHAB |
0918-46-148 | Denton/ Dallas |
CR | Actual | $477,105 | 6 | REPLACE BRIDGE AND APPROACHES |
2681-01-015 | Denton/ Dallas |
FM 2499 | Actual | $4,259,000 | 10 | WIDEN DIVIDED URBAN ROADWAY FROM FOUR TO SIX LANES |
0042-07-054 | Donley/ Childress |
US 287 | Actual | $1,141,878 | 8 | SAFETY TREAT DRAINAGE STRUCTURE |
0007-06-073 | Eastland/ Brownwood |
IH 20 | Actual | $5,589,011 | 1 | PCC OVERLAY |
0229-01-035 | Ector/ Odessa |
US 385 | Actual | $46,900 | 8 | HAZARD ELIMINATION AND SAFETY |
0906-00-118 | Ector/ Odessa |
VA | Actual | $1,396,879 | 1 | PAVEMENT MARKINGS |
2224-01-069 | Ector/ Odessa |
SH 302 | Actual | $141,637 | 11 | LANDSCAPE |
0002-14-028 | El Paso/ El Paso |
FM 258 | Actual | $658,509 | 1 | INTERSECTION SIGNALIZATION |
0167-02-044 | El Paso/ El Paso |
BU 54-A | Actual | $2,273,000 | 7 | TRANSIT ENHANCEMENTS |
0674-01-061 | El Paso/ El Paso |
FM 76 | Actual | $1,225,400 | 7 | TRANSIT ENHANCEMENTS |
0924-06-229 | El Paso/ El Paso |
CS | Actual | $3,000,000 | 5 | FTA TRANSFER PROJECT CONSISTS OF INTERNATIONAL SERVICE |
0924-06-278 | El Paso/ El Paso |
VA | Actual | $250,000 | 5 | OZONE ACTION DAY AND PUBLIC AWARENESS PROGRAM |
0172-05-104 | Ellis/ Dallas |
US 287 | Actual | $2,738,461 | 1 | MICROSURFACING, MILLING AND OVERLAY |
0675-02-056 | Freestone/ Bryan |
IH 45 | Actual | $3,386,250 | 1 | REHABILITATION OF EXISTING RD CONSISTING OF FLEXIBLE BASE, |
2131-01-023 | Freestone/ Bryan |
FM 833 | Actual | $2,678,034 | 1 | RESTORATION OF EXIST RD CONSISTING OF SUBGR WDN, CMT TRT, |
0729-01-032 | Grayson/ Paris |
FM 121 | Actual | $3,243,562 | 11 | WIDENING OF A NON - FREEWAY FACILITY |
0910-07-049 | Gregg/ Tyler |
VA | Actual | $2,688,517 | 9 | GLADEWATER STREETSCAPE - RPLC SIDEWALKS, INSTALL PED LIGHTING |
0910-07-050 | Gregg/ Tyler |
VA | Actual | $1,699,178 | 9 | CITY OF LONGVIEW GRACE CREEK PEDESTRIAN & BICYCLE TRAIL |
2642-01-038 | Gregg/ Tyler |
LP 281 | Actual | $8,706,272 | 10 | REHABILITATE ROADWAY AND IMPROVE VARIOUS INTERSECTIONS |
0643-04-024 | Grimes/ Bryan |
FM 244 | Actual | $1,314,791 | 8 | SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF PAVED |
0028-02-044 | Harris/ Houston |
US 90 | Actual | $45,844,449 | 10 | CONSTRUCT INTERIM GRADE SEPARATION (PHASE 2) ON NEW LOCATION |
0028-02-054 | Harris/ Houston |
US 90 | Actual | $67,299,168 | 10 | CONSTRUCT 6 MAIN LANES |
0050-09-072 | Harris/ Houston |
US 290 | Actual | $460,012 | 1 | REPLACE PAVEMENT MARKINGS WITH MULTIPOLYMER AND INSTALL |
0271-06-111 | Harris/ Houston |
IH 10 | Actual | $1,932,753 | 2 | LANDSCAPING |
0271-06-112 | Harris/ Houston |
IH 10 | Actual | $764,919 | 10 | LANDSCAPING |
0271-06-113 | Harris/ Houston |
IH 10 | Actual | $1,108,939 | 10 | LANDSCAPING |
0389-12-086 | Harris/ Houston |
SH 146 | Actual | $947,947 | 1 | BRIDGE PAINTING |
0912-00-290 | Harris/ Houston |
VA | Actual | $800,000 | 1 | CTMS INTEGRATION TO TRANSTAR |
0912-00-303 | Harris/ Houston |
VA | Actual | $814,938 | 5 | FY 2005 CLEAN AIR ACTION PUBLIC OUTREACH PROGRAM |
0912-00-320 | Harris/ Houston |
VA | Actual | $3,610,750 | 7 | REGIONALLY SIGNIFICANT PLANNING SUPPORT ACTIVITIES |
0912-00-321 | Harris/ Houston |
VA | Actual | $3,200,000 | 1 | CTMS MAINTENANCE (INCLUDES FLOW SIGNALS) |
0912-71-641 | Harris/ Houston |
CS | Actual | $9,607,291 | 7 | RECONSTRUCT & REHABILITATE 4 - LANE ROADWAY |
0912-72-042 | Harris/ Houston |
VA | Actual | $1,458,361 | 10 | LANDSCAPE DEVELOPMENT |
3256-02-075 | Harris/ Houston |
BW 8 | Actual | $199,307 | 1 | REALIGN OLD NORTH BELT (SUBGRADE, BASE, ACP, RCP, DITCHES, |
3510-05-013 | Harris/ Houston |
SH 99 | Actual | $358,344 | 10 | LANDSCAPING |
8004-12-003 | Harris/ Houston |
MH | Actual | $15,955,747 | 10 | CONSTRUCT 4 - LN DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY |
0640-01-041 | Harrison/ Atlanta |
FM 31 | Actual | $4,342,403 | 1 | SAFETY TREAT FIXED OBJECTS, ETC. |
1776-01-024 | Hays/ Austin |
RM 967 | Actual | $297,527 | 1 | CONSTRUCT LEFT TURN LANE |
0039-17-159 | Hidalgo/ Pharr |
US 83 | Actual | $547,246 | 11 | GOVERNOR'S COMMUNITY ACHIEVEMENT AWARD |
0921-00-063 | Hidalgo/ Pharr |
VA | Actual | $904,015 | 1 | FY 2006 REHABILITATION OF TRAFFIC SIGNALS_NON - SITE SPECIFIC |
1090-01-021 | Jackson/ Yoakum |
FM 530 | Actual | $2,879,829 | 6 | REPLACE BRIDGE AND APPROACHES |
0065-01-039 | Jasper/ Beaumont |
US 96 | Actual | $17,302,253 | 11 | WIDEN & RECONSTRUCT TO 4 LANE DIVIDED RURAL |
0244-02-087 | Jasper/ Beaumont |
SH 63 | Actual | $4,237,462 | 1 | REHABILITATE AND SAFETY UPGRADE EXISTING ROADWAY |
0924-10-005 | Jeff Davis/ El Paso |
PW | Actual | $1,885,078 | 10 | CONST 0.5 MI LOOP ROAD TO CONNECT ACCESS ROAD & PARKING AREA |
0932-01-091 | Jefferson/ Beaumont |
FM 365 | Actual | $2,748,209 | 1 | ADD A CONTINUOUS LEFT TURN LANE AND ENCLOSE DRAINAGE |
0019-01-128 | Johnson/ Fort Worth |
SH 174 | Actual | $98,000 | 8 | INSTALL TRAFFIC SIGNAL |
0019-01-129 | Johnson/ Fort Worth |
SH 174 | Actual | $55,400 | 10 | WORK CONSISTING OF INSTALLATION OF A FULL TRAFFIC - ACTUATED |
0172-10-010 | Johnson/ Fort Worth |
US 287 | Actual | $5,049,000 | 10 | CONSTRUCT GRADE SEPARATION, RAMPS AND FRONTAGE ROADS |
0747-05-036 | Johnson/ Fort Worth |
FM 157 | Actual | $13,956,702 | 1 | REPAIR BASE FAILURES AT VARIOUS LOCATIONS AS NEEDED |
2118-02-012 | Johnson/ Fort Worth |
FM 1902 | Actual | $248,126 | 8 | ADD LEFT TURN LANE |
0697-03-019 | Kaufman/ Dallas |
FM 429 | Actual | $5,630,485 | 1 | WIDEN PAVED SURFACE |
2007-01-007 | Kimble/ San Angelo |
FM 2169 | Actual | $3,154,644 | 1 | REPLACE STRUCTURES AT JOHNSON FORK CROSSINGS & REHAB ROADWAY |
0227-04-016 | Lamb/ Lubbock |
US 385 | Actual | $790,999 | 1 | SEAL COAT (MICROSURFACING) |
1191-04-018 | Limestone/ Waco |
FM 937 | Actual | $8,934,451 | 10 | WIDEN ROADWAY AND ADD SHOULDERS |
0905-06-061 | Lubbock/ Lubbock |
VA | Actual | $295,300 | 9 | CONSTRUCT SIDEWALKS - SAFE ROUTES PROJECT |
0475-03-046 | Madison/ Bryan |
OSR | Actual | $1,221,822 | 1 | GRADING, STRS, BASE AND SURFACING |
0604-01-040 | Matagorda/ Yoakum |
FM 2031 | Actual | $19,858,398 | 6 | CONSTRUCT NEW BRIDGE |
0299-03-043 | Maverick/ Laredo |
US 277 | Actual | $2,093,772 | 11 | REPLACE BRIDGE AND APPROACHES |
0055-08-107 | McLennan/ Waco |
US 84 | Actual | $49,265 | 1 | BLAST CLEAN AND PAINT EXISTING BRIDGE, COLUMNS AND RIPRAP |
0289-03-021 | Mills/ Brownwood |
SH 16 | Actual | $1,270,163 | 1 | GRADING, BASE, AND SURFACE |
0553-03-019 | Nacogdoches/ Lufkin |
SH 7 | Actual | $6,396,880 | 8 | ADD SHOULDERS & REHAB PAVEMENT |
0983-03-024 | Nolan/ Abilene |
FM 419 | Actual | $968,635 | 6 | REPLACE BRIDGE AND APPROACHES |
0916-35-045 | Nueces/ Corpus Christi |
CR | Actual | $375,930 | 6 | REPLACE BRIDGE AND APPROACHES |
0362-04-032 | Palo Pinto/ Fort Worth |
SH 16 | Actual | $7,957,708 | 1 | WIDEN EXISTING ROADWAY |
1408-01-021 | Polk/ Lufkin |
FM 1276 | Actual | $8,963,679 | 11 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0036-03-024 | Real/ San Angelo |
US 83 | Actual | $13,973,308 | 1 | GRADING, STRUCTURES, BASE AND SURFACING |
0451-01-032 | Rockwall/ Dallas |
SH 205 | Actual | $40,121,610 | 10 | WIDEN 2 LANE TO 6 LANE URBAN DIVIDED HIGHWAY WITH 3 LANE |
0011-05-042 | Shackelford/ Abilene |
US 180 | Actual | $3,816,797 | 11 | CURB & GUTTER, SIDEWALKS, ACP OVERLAY |
0013-10-068 | Tarrant/ Fort Worth |
BU 287P | Actual | $108,677 | 8 | INSTALLATION OF A FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL |
0094-02-111 | Tarrant/ Fort Worth |
SH 10 | Actual | $104,325 | 5 | SIGNAL TIMING OPTIMIZATION AND UPGRADES |
2266-02-120 | Tarrant/ Fort Worth |
SH 360 | Actual | $119,832 | 1 | INSTALLATION OF A FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL |
0908-00-062 | Taylor/ Abilene |
VA | Actual | $582,054 | 1 | SIGNS, PAV MARK, SIGNALS, SAFETY |
0015-13-336 | Travis/ Austin |
IH 35 | Actual | $94,975 | 10 | LANDSCAPE BED & IRR SYS MNT FOR 24MOS; NO MOWING |
0914-00-209 | Travis/ Austin |
VA | Actual | $50,000 | 7 | DEMOGRAPHICS DATA COLLECTION |
0914-00-218 | Travis/ Austin |
VA | Actual | $100,000 | 7 | REFINE MPO'S MODELING CAPABILITIES TO INCLUDE ROUTE CHOICE |
0914-00-219 | Travis/ Austin |
VA | Actual | $50,000 | 7 | REGIONAL VOLUNTARY INITIATIVES TO REDUCE GROUND - LEVEL OZONE |
0914-00-224 | Travis/ Austin |
VA | Actual | $680,000 | 7 | REFINE MPO'S MODELING CAPABILITIES TO INCLUDE ROUTE CHOICE |
0914-00-225 | Travis/ Austin |
VA | Actual | $50,000 | 7 | REGIONAL VOLUNTARY INITIATIVES TO REDUCE GROUND - LEVEL OZONE |
0914-00-228 | Travis/ Austin |
VA | Actual | $10,000 | 7 | COORDINATE REGIONAL TRAINING PROGRM FOR |
1186-01-063 | Travis/ Austin |
FM 969 | Actual | $976,688 | 7 | CONSTRUCT SIDEWALKS |
3136-01-143 | Travis/ Austin |
LP 1 | Actual | $257,120 | 10 | CONSTRUCT NB FRONTAGE RD AUX LN: CONSISTING OF GRADING, |
3417-03-012 | Travis/ Austin |
FM 734 | Actual | $5,998,596 | 1 | RECONSTRUCT PAVEMENT |
2350-01-031 | Victoria/ Yoakum |
LP 463 | Actual | $7,366,511 | 11 | ADD 2 LANES FOR 4 - LANE DIVIDED FACILITY |
0271-04-081 | Waller/ Houston |
IH 10 | Actual | $1,595,507 | 1 | BASE REPAIR, PLANING, ASPHALT OVERLAY & PAVEMENT MARKINGS |
0338-09-023 | Washington/ Bryan |
FM 390 | Actual | $2,214,922 | 8 | SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF PAVED |
0327-10-040 | Willacy/ Pharr |
US 77 | Actual | $26,072,714 | 10 | EXPAND TO FOUR LANE FREEWAY |
1378-02-029 | Williamson/ Austin |
RM 1431 | Actual | $4,282,687 | 10 | RECONST TO 6 - LANE DIVIDED ROADWAY |
0143-03-034 | Wilson/ San Antonio |
US 87 | Actual | $152,786 | 10 | LANDSCAPE DEVELOPMENT |
0292-02-035 | Winkler/ Odessa |
SH 18 | Actual | $332,845 | 8 | ELIMINATION OF ROADWAY HAZARDS |
0013-07-072 | Wise/ Fort Worth |
US 81 | Actual | $1,686,550 | 11 | RECONFIGURE INTERSECTION; PROVIDE DIRECT CONNECT. FROM US380 |
0902-20-079 | Wise/ Fort Worth |
CR | Actual | $1,107,328 | 6 | REPLACE BRIDGE AND APPROACHS |
|
|