Letting Schedule for August, 2006 (FY 2006)

 
 
Last Update: Monday, August 28, 2006
August, 2006 (FY 2006) (see Links)
SEP 2005 | OCT 2005 | NOV 2005 | DEC 2005 | JAN 2006 | FEB 2006 | MAR 2006 | APR 2006 | MAY 2006 | JUN 2006 | JUL 2006 | AUG 2006
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0336-05-056 Angelina/
Lufkin
SH 103 Actual $2,885,719 1 REHABILITATE SHOUDERS AND WIDEN, ADD TWO WAY CONTINOUS LEFT
1549-01-049 Aransas/
Corpus Christi
FM 1781 Actual $3,441,755 1 INSTALL PROTECTION & SAFETY TRT OBJECTS
1073-01-017 Bastrop/
Austin
FM 696 Approved $7,367,000 10 CONSTRUCT NON - FREEWAY ROADWAY
1186-02-015 Bastrop/
Austin
FM 969 Approved $1,189,250 11 SAFETY TREAT FIXED OBJECTS
0100-07-044 Bee/
Corpus Christi
US 181 Approved $292,200 11 LANDSCAPE
1063-01-023 Bee/
Corpus Christi
FM 673 Actual $2,750,240 1 MODIFY BRIDGE, ADD 4' SIDEWALK
0025-02-164 Bexar/
San Antonio
IH 10 Actual $18,269,801 ROW RECONFIGURING RAMPS & INTERSECTION (EAST - & WEST - BOUND)
0025-02-173 Bexar/
San Antonio
IH 10 Actual $1,301,196 1 CONSTRUCT TRAFFIC SIGNALS AND PEDESTRIAN RAMPS
0253-04-134 Bexar/
San Antonio
US 281 Actual $457,007 1 INSTALLATION OF TRAFFIC SIGNALS
0049-09-062 Brazos/
Bryan
BS 6-R Actual $568,634 8 SAFETY IMPROVEMENT WORK CONSISTING OF THE IMPROVEMENT OF
0925-12-008 Briscoe/
Childress
VA Approved $699,802 9 CAPROCK CANYONS - HIGH PLAINS BISON VISITORS CENTER
0054-06-083 Brown/
Brownwood
US 67 Actual $4,057,336 1 MILL, OVERLAY, ACP, C & G, ADA RAMPS, SIDEWALKS
0648-03-055 Burleson/
Bryan
FM 60 Actual $383,841 1 SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF A LEFT
0713-03-008 Burleson/
Bryan
RR 4 Actual $722,160 1 SAFETY IMPROVEMENT WORK CONSISTING OF THE ADDITION OF PAVED
0700-01-028 Burnet/
Austin
SH 71 Actual $2,553,951 1 REPLACE BRIDGE AND APPROACHES
1378-03-025 Burnet/
Austin
RM 1431 Actual $9,635,631 1 GRADING, STRUCTURES, BASE & SURFACING
0914-22-042 Caldwell/
Austin
VA Approved $1,643,880 9 CONSTRUCT PEDESTRIAN / BICYCLE TRAIL
0331-01-038 Cameron/
Pharr
SH 100 Actual $4,156,109 8 INSTALL MEDIAN BARRIER
1057-01-013 Cameron/
Pharr
FM 675 Actual $2,565,507 1 REPLACE BRIDGE AND APPROACHES
1024-01-061 Chambers/
Beaumont
FM 565 Actual $4,985,706 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0194-02-075 Cooke/
Wichita Falls
IH 35 Actual $14,790,001 1 REHAB US 82 RAMP AND FRONTAGE ROADS
0909-39-105 Coryell/
Waco
CS Actual $4,663,726 1 CONSTRUCT AN ALTERNATE TRANSPORTATION ROUTE CONSISTING OF
0233-01-039 Culberson/
El Paso
US 62 Actual $159,299 8 TEXTURIZED SHOULDERS
0009-11-206 Dallas/
Dallas
IH 30 Actual $2,122,915 6 REHABILITATE BRIDGE
0047-07-181 Dallas/
Dallas
US 75 Tentative $14,670,000 7 REMOVE OVERPASS AND RECONSTRUCT INTERCHANGE AT GRADE
0918-45-706 Dallas/
Dallas
VA Actual $3,149,824 7 QUIET ZONES / QUAD GATES - - RAIL TRANSIT
0918-45-769 Dallas/
Dallas
VA Tentative $781,295 5 SIP IMPLEMENTATION - ON - SYSTEM
0918-45-775 Dallas/
Dallas
VA Tentative $66,950 5 19 INTERSECTIONS - SIGNAL IMPROVEMENTS, LEDS AND GPS CLOCKS
0918-45-798 Dallas/
Dallas
CS Tentative $1,000,000 10 DART LRT OVERPASS
2374-03-049 Dallas/
Dallas
IH 20 Actual $10,974,322 11 CONSTRUCT 2 LANE FRONTAGE ROADS EASTBOUND AND WESTBOUND
1697-02-018 Eastland/
Brownwood
FM 2214 Actual $5,409,346 1 REGRADE AND WIDEN EXISTING ROADWAY, FLEX BASE AND SURFACE
0906-00-119 Ector/
Odessa
VA Actual $248,555 1 CURB RAMPS
0906-06-045 Ector/
Odessa
CS Actual $24,574,215 11 CONTRUCT INTERCHANGE
0747-06-011 Ellis/
Dallas
FM 157 Actual $7,590,024 1 ADD 3 FOOT PAVED SHOULDERS
0774-04-012 Erath/
Fort Worth
FM 219 Actual $4,757,669 1 ADD PAVED SURFACE, CEMENT TREAT AND OVERLY
0902-49-033 Erath/
Fort Worth
VA Approved $1,093,596 9 DUBLIN PEDESTRIAN PARKWAY - CONSTRUCT WALKWAY AND SIDEWALKS
1488-01-011 Fannin/
Paris
FM 1553 Actual $359,539 1 REPLACE BRIDGE AND APPROACHES
0027-12-131 Fort Bend/
Houston
US 59 Actual $2,759,712 1 BASE REPAIR, SURFACE TREATMENT, OVERLAY AND JOINT REPAIR
0155-04-043 Goliad/
Corpus Christi
US 183 Approved $5,951,246 1 MOD BRIDGE RAIL ANS SAFETY TREAT FIXED OBJECTS
0216-04-011 Gonzales/
Yoakum
FM 1117 Actual $5,112,679 1 SAFETY TREAT FIXED OBJECTS
0202-08-048 Grayson/
Paris
FM 131 Approved $1,209,629 1 REHABILITATE EXISTING ROADWAY AND ADD TURN LANES
0138-08-022 Gregg/
Tyler
SH 31 Actual $764,132 8 INTERCONNECT TRAFFIC SIGNALS
0051-02-095 Harris/
Houston
SH 3 Actual $1,445,034 8 CONTINUOUS TURN LANE
0271-14-197 Harris/
Houston
IH 610 Actual $76,484,640 1 BONDED CONCRETE OVERLAY AND RECONSTRUCTION OF BRIDGE SLABS,
0912-71-576 Harris/
Houston
VA Tentative $352,520 1 IMPROVE TRANSTAR TO SATELLITE COMMUNICATIONS CONNECTIVITY
0912-71-864 Harris/
Houston
VA Tentative $784,722 10 SMART COMMUTER INTELLIGENT VEHICLE HIGHWAY SYSTEMS OPERATION
1685-05-086 Harris/
Houston
SH 6 Actual $5,236,514 1 PLANING, SPALL REP, FULL DEP CONC REP, CONC BRDG DECK
2941-01-019 Harris/
Houston
FM 2920 Actual $425,671 1 INSTALL LEFT TURN LANE, WIDEN SUB GRADE, ACP OVERLAY AND
0096-07-034 Harrison/
Atlanta
US 80 Actual $3,276,173 1 REHAB BRIDGE AND APPROACHES
0402-05-002 Harrison/
Atlanta
LP 390 Actual $4,267,322 1 CONSTRUCT 4 - LANE URBAN SECTION WITH 14' FLUSH MEDIAN ON
3210-01-009 Hays/
Austin
FM 2770 Actual $141,681 11 ROADWAY IMPROVEMENTS
1099-05-019 Henderson/
Tyler
SL 7 Approved $9,978,512 1 CONSTRUCT GRADE - SEPARATED INTERCHANGE OVER FM 1616
1228-03-027 Hidalgo/
Pharr
FM 1015 Actual $11,277,854 7 INSTALL TRAFFIC SIGNAL, ADD THROUGH LANES & CONTINOUS LEFT
0019-03-023 Hill/
Waco
FM 2719 Actual $617,117 1 REPLACE BRIDGE AND APPROACHES
0336-01-039 Houston/
Lufkin
SH 7 Actual $14,237,179 1 REHAB PAVEMENT, ADD SHOULDERS AND PASSING LANE
0173-06-038 Hunt/
Paris
SH 34 Actual $248,580 1 TRAFFIC SIGNAL
0171-01-025 Jack/
Fort Worth
SH 199 Actual $2,212,199 1 REPLACE BRIDGE
0920-00-075 Jefferson/
Beaumont
VA Tentative $1,140,000 5 REPLACE 12 RURAL TRANSIT BUSES / ALTERNATE FUEL VEHICLES
0920-38-175 Jefferson/
Beaumont
CS Approved $623,397 5 CONSTRUCT SIDEWALKS TO CONNECT SCHOOLS AT VARIOUS LOCATIONS
0747-05-022 Johnson/
Fort Worth
FM 157 Actual $2,522,245 1 REPLACE BRIDGE
2417-02-015 Johnson/
Fort Worth
FM 2331 Actual $7,845,770 11 ADD PAVED SURFACE., TREAT SUBGRADE, REHAB BASE AND ADD 2"
0697-04-013 Kaufman/
Dallas
FM 90 Actual $2,043,012 1 WIDEN PAVED SURFACE
1091-02-017 Kaufman/
Dallas
FM 740 Actual $2,849,115 1 ADD 3 FOOT PAVED SHOULDERS
0045-16-008 Lamar/
Paris
FM 194 Actual $2,159,111 6 REPLACE BRIDGE AND APPROACHES
1690-01-100 Lamar/
Paris
US 82 Actual $9,450,360 1 CONSTRUCT OVERPASS
1073-02-026 Lee/
Austin
FM 696 Actual $988,978 11 SAFETY TREAT F.O, ADD SHOULDERS & INCREASE SUPER_ELEVATION
0447-01-050 Live Oak/
Corpus Christi
US 59 Actual $24,398,728 6 CONSTRUCT ADDITIONL TWO LANES
1808-01-020 Live Oak/
Corpus Christi
FM 534 Actual $2,320,071 1 MOD BRIDGE RAIL ANS SAFETY TREAT FIXED OBJECTS
0700-04-035 Llano/
Austin
SH 71 Actual $1,747,562 1 IMPROVE HORIZONTAL ALIGNMENT & CONST PAVED SHOULDERS
0149-04-014 Mason/
Austin
US 377 Actual $694,443 11 INSTALL LTL & RECONST INTERSECTION
0909-22-129 McLennan/
Waco
CS Approved $250,000 9 CONSTRUCT AN ALTERNATE TRANSPORTATION ROUTE CONSISTING OF
1730-02-012 Medina/
San Antonio
FM 1283 Actual $2,979,568 8 REHAB EXISTING ROADWAY
0177-05-057 Montgomery/
Houston
US 59 Actual $90,129,876 11 WIDEN TO 8 MAIN LANES AND TWO 3 - LANE FRONTAGE ROADS
0118-08-059 Nacogdoches/
Lufkin
SH 21 Actual $2,087,800 8 SAFETY TREAT FIXED OBJECTS
0006-02-100 Nolan/
Abilene
IH 20 Actual $18,067,867 11 PLANING. UNDERSEAL, HOT MIX ASPHALTIC CONCRETE PAVEMENT,
0385-01-018 Palo Pinto/
Fort Worth
FM 4 Actual $5,350,444 11 ADD PAVED SURFACE, CEMENT TREAT AND 2 CST
0008-09-030 Parker/
Fort Worth
FM 5 Actual $8,056,100 1 ADD PAVED SURFACE, CEMENT TREAT AND OVERLAY
0902-38-048 Parker/
Fort Worth
VA Approved $1,485,778 9 RECONSTRUCT SIDEWALKS AND ADD LANDSCAPING IN DOWNTOWN
0388-01-039 Polk/
Lufkin
SH 146 Actual $5,314,122 1 REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS
0379-02-028 Potter/
Amarillo
SH 136 Actual $7,713,826 1 HAZARD ELIMINATION
0904-00-116 Potter/
Amarillo
VA Actual $876,575 10 STATEWIDE CURB RAMP PROGRAM
0034-06-010 Runnels/
San Angelo
FM 2887 Actual $2,189,938 1 RESTORE AND RESURFACE ROAD
0395-02-026 San Jacinto/
Lufkin
SH 150 Actual $9,723,852 8 ADD SHOULDERS & REHAB PAVEMENT, CNSTR LT TURN & IMPROVE
0616-01-017 San Patricio/
Corpus Christi
PR 25A Actual $498,469 8 WIDEN & CEMENT TRT EXISTING ROADWAY W / 2 CRS SURF TRT
0809-02-060 Shelby/
Lufkin
US 96 Actual $652,860 8 SAFETY TREAT FIXED OBJECTS
2075-02-055 Smith/
Tyler
LP 323 Approved $8,014,299 10 RESURF ROADWAY, IMPROVE SIGS & SAFETY, CONSTR SIDEWALKS
0008-04-043 Tarrant/
Fort Worth
SP 580 Tentative $651,735 10 MEDIAN LANDSCAPE IMPROVEMENTS
0008-13-203 Tarrant/
Fort Worth
IH 820 Actual $5,188,884 8 INSTALL MEDIAN BARRIER
0008-13-208 Tarrant/
Fort Worth
IH 20 Actual $1,472,710 10 RECONSTRUCT FRONTAGE ROAD FROM FLEXIBLE PAVEMNT TO REINFORCE
0081-12-039 Tarrant/
Fort Worth
IH 35W Tentative $1,193,313 10 INSTALL TURNAROUND BRIDGE FOR IH35W SB; ON NORTH SIDE FOR
0718-02-025 Tarrant/
Fort Worth
FM 156 Actual $7,502,998 7 WIDEN TO 4 LANE WITH CONTINUOUS LEFT TURN LANE
0747-04-058 Tarrant/
Fort Worth
FM 157 Actual $2,596,494 8 INSTALL RAISED MEDIAN
0902-00-102 Tarrant/
Fort Worth
VA Actual $143,800 7 UPGRADE LED HEADS, GPS CLOCKS AND SIGNAL TIMING OPTIMIZATION
0902-48-454 Tarrant/
Fort Worth
VA Tentative $1,904,804 5 CONSTRUCT TRAIL TO CONNECT LINKS BETWEEN ENTITIES
0902-48-556 Tarrant/
Fort Worth
CS Approved $1,649,133 5 CORRIDOR IMPROVEMENTS ON GLADE ROAD FROM MARTIN TO HERITAGE
0902-48-658 Tarrant/
Fort Worth
VA Actual $374,695 7 SIGNAL IMPROVESMENTS ON SYSTEM VIA THOROUGHFARE ASSESSMENT
1605-02-016 Tarrant/
Fort Worth
FM 1886 Tentative $1,358,584 10 REPLACE BRIDGE
0006-05-098 Taylor/
Abilene
IH 20 Actual $22,582,510 3 RELOCATE RAMPS AND UPGRADE FRONTAGE ROADS TO ONE WAY
0006-06-088 Taylor/
Abilene
IH 20 Actual $1,208,506 11 REHAB FRONTAGE ROADS
0221-05-079 Titus/
Atlanta
US 271 Actual $851,102 8 SAFETY TREAT FIXED OBJECTS, ETC.
1176-02-011 Titus/
Atlanta
FM 899 Actual $1,634,564 1 REPLACE BRIDGE AND APPROACHES
0077-06-079 Tom Green/
San Angelo
US 67 Actual $17,407,114 11 REHABILITATE & WIDEN EXISTING ROADWAY
0015-10-056 Travis/
Austin
IH 35 Actual $5,128,857 1 WDN FRT RD, STORM SEWER, SIGNALS
0265-01-100 Travis/
Austin
SH 71 Actual $768,464 1 1CST & OVERLAY
0914-00-198 Travis/
Austin
VA Tentative $106,130 1 TRAFFIC SECTION CADD ASSISTANCE
0914-00-234 Travis/
Austin
VA Tentative $185,000 10 STUDY TO ENCOURAGE TRUCK TRAFFIC IN PEAK HOURS
0914-04-067 Travis/
Austin
CS Actual $1,782,245 6 REHABILITATE BRIDGE & APPROACHES
0914-04-166 Travis/
Austin
VA Tentative $1,966,581 9 CONSTRUCT BIKE TRAIL__ (AKA LANCE ARMSTRONG TRAIL)
2718-01-010 Travis/
Austin
RM 2769 Actual $3,236,136 11 PROVIDE ADDTL PAVED SURFACE WIDTH
3136-01-148 Travis/
Austin
LP 1 Tentative $200,000 10 DEMONSTRATE USE OF DELIBERATIVE POLLING
3136-01-149 Travis/
Austin
LP 1 Tentative $215,000 10 DEVELOP HOT LANE STRATEGY FOR INFORCEMENT AND OPERATIONS
1237-01-022 Tyler/
Beaumont
FM 1013 Actual $2,254,087 1 REPLACE BRIDGE AND APPROACHES
0392-02-071 Upshur/
Atlanta
US 259 Actual $10,058,860 1 CONSTRUCT GRADE SEPARATION
0401-04-025 Upshur/
Atlanta
SH 154 Actual $5,604,451 1 REPLACE BRIDGE AND APPROACHES
0907-12-006 Val Verde/
Laredo
CS Actual $581,999 6 REPLACE BRIDGE AND APPROACHES
0922-11-022 Val Verde/
Laredo
VA Actual $287,438 9 FOR THE CONSTRUCTION OF A HIKE & BIKE TRAIL FACILITY
0030-09-037 Wheeler/
Childress
US 83 Actual $10,316,803 1 REHABILITATION OF ROADWAY / ADA
0015-16-016 Williamson/
Austin
BI 35-L Tentative $100,000 7 CONSTRUCT & INSPECT SIDEWALK
0151-03-032 Williamson/
Austin
SH 29 Approved $700,715 11 SAFETY TREAT FIXED OBJECTS / IMPROVE GUARDRAIL
0321-01-046 Williamson/
Austin
SH 95 Actual $257,019 10 LANDSCAPING AND IRRIGATION
0914-05-135 Williamson/
Austin
CR Actual $2,896,584 6 REPLACE BRIDGE AND APPROACHES
0915-14-025 Wilson/
San Antonio
CR Actual $1,798,531 9 REPLACE BRIDGE AND APPROACHES
0134-11-026 Wise/
Fort Worth
US 380 Tentative $5,957,985 6 REPLACE RAILROAD UNDERPASS
0902-20-071 Wise/
Fort Worth
CR Actual $567,270 6 REPLACE BRIDGE
1098-01-016 Wise/
Fort Worth
FM 718 Actual $2,016,889 1 BRIDGE REPL


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract