Letting Schedule for Dallas District (FY 2011)
Letting Schedule for Dallas District (FY 2011) | ||||
Last Update: Tuesday, September 6, 2011 |
Dallas District (FY 2011) |
Collin | Dallas | Denton | Ellis | Kaufman | Navarro | Rockwall | ||||||
Collin County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0047-05-050 | SH 5 | Actual | AUG 2011 | $1,710,332 | 10 | ADD RIGHT TURN LNS AT INTERSECTION AND ADD RAISED MEDIAN AT |
0047-06-108 | US 75 | Actual | MAR 2011 | 106,580,042 | 10 | RECONSTRUCT AND WIDEN FROM 4 TO 8 LANES AND 3 LANE FRONTAGE |
0047-06-143 | US 75 | Actual | JAN 2011 | $134,439 | 1 | REFURBISH SMALL SIGNS |
0091-04-050 | SH 289 | Actual | JUL 2011 | $17,270,901 | 10 | RECONSTRUCT AND WIDEN TWO LANE RURAL HIGHWAY TO SIX LANE |
0091-04-054 | SH 289 | Actual | NOV 2010 | $10,258,565 | 10 | REPLACE OVERPASS AND APPROACHES |
0091-04-055 | SH 289 | Actual | JUL 2011 | $18,214,018 | 10 | RECONSTRUCT AND WIDEN TWO LANE RURAL HIGHWAY TO FOUR LANE |
0091-05-061 | SH 289 | Actual | AUG 2011 | $3,685,505 | 1 | REPAIR PAVEMENT, RESURFACE HIGHWAY, PAVEMENT MARKINGS |
0135-02-045 | US 380 | Actual | JUL 2011 | $11,650,910 | 10 | WIDEN EXISTING FOUR LANE DIVIDED ACP HIGHWAY TO SIX LANE |
0135-02-046 | US 380 | Actual | FEB 2011 | $1,907,956 | 10 | WIDEN EXISTING 4 LANE DIVIDED TO 6 LANE DIVIDED URBAN HIWAY |
0135-03-039 | US 380 | Actual | DEC 2010 | $169,786 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING, |
0135-05-025 | US 380 | Actual | JUL 2011 | $18,186,687 | 10 | WIDEN EXISTING 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED, |
0135-12-025 | FM 3537 | Actual | JUN 2011 | $23,788,821 | 10 | WIDEN TWO LANE RURAL TO SIX LANE DIVIDED URBAN HIGHWAY |
0619-01-022 | FM 6 | Actual | APR 2011 | $4,383,590 | 1 | BASE RESTORATION & HMAC OVERLAY |
0918-24-097 | VA | Actual | AUG 2011 | $1,042,073 | 9 | CONSTRUCT SIDEWALKS ALONG CITY STREETS IN CITY OF MELISSA |
1012-01-013 | FM 543 | Actual | JAN 2011 | $5,641,784 | 1 | BASE RESTORATION & HMAC OVERLAY |
1012-02-025 | FM 545 | Actual | MAY 2011 | $2,729,000 | 1 | REPLACE BRIDGE AND APPROACHES |
1014-04-012 | FM 1777 | Actual | FEB 2011 | $1,579,675 | 1 | BASE REPAIR AND OVERLAY |
1746-01-022 | FM 1827 | Actual | FEB 2011 | $1,265,437 | 1 | BASE REPAIR AND LEVEL UP |
2056-01-045 | FM 2551 | Actual | JUN 2011 | $15,783,469 | 10 | RECONSTRUCT AND WIDEN 2 LANE RURAL TO 6 LANE URBAN DIVIDED |
Dallas County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0008-08-070 | SH 180 | Actual | FEB 2011 | $3,463,807 | 1 | PLANING, FULL DEPTH REPAIR AND OVERLAY |
0008-08-071 | SH 180 | Actual | FEB 2011 | $319,166 | 10 | LANDSCAPE DEVELOPMENT TO INCL GR, C & G, SIDEWALK, PVMT MKGS, |
0009-11-218 | IH 30 | Actual | JUN 2011 | $899,417 | 1 | PLANING, ACP OVERLAY, PAVEMENT MARKINGS, AND SHOULDER REPAIR |
0009-11-222 | IH 30 | Actual | MAY 2011 | $5,269,891 | 1 | PLANING, ACP OVERLAY, SHOULDER REPAIR AND PAVEMENT MARKINGS |
0047-07-220 | US 75 | Actual | AUG 2011 | $408,549 | 10 | LANDSCAPE DEVELOPMENT |
0091-06-052 | SH 289 | Actual | MAR 2011 | $1,513,329 | 7 | NB RT TURN LANES @ DVNPORT & @ CMPBL;NB LT TURN LN |
0092-02-118 | IH 45 | Actual | MAR 2011 | $359,863 | 5 | INSTALLATION OF WIRELESS INCIDENT DETECTION AND RESPONSE |
0092-07-055 | SH 356 | Actual | MAR 2011 | $309,272 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING, |
0095-02-108 | US 80 | Actual | JUN 2011 | $109,492 | 1 | REFURBISH GUIDE SIGNS |
0095-13-030 | IH 20 | Actual | FEB 2011 | $1,901,037 | 1 | FULL DEPTH CONCRETE PAVEMENT REPAIR |
0095-13-033 | IH 20 | Actual | JUN 2011 | $554,056 | 1 | REFURBISH GUIDE SIGNS |
0197-02-102 | US 175 | Actual | JUN 2011 | $174,136 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND |
0353-05-111 | SP 244 | Actual | MAY 2011 | $1,297,421 | 1 | FULL DEPTH CONCRETE PAVEMENT REPAIR, PATCHING, NOVACHIP, AND |
0353-06-056 | SH 114 | Actual | DEC 2010 | $831,384 | 1 | REPAIR SLOPE FAILURE |
0430-01-052 | SH 352 | Actual | NOV 2010 | $364,655 | 1 | MILL, FULL DEPTH PAVEMENT REPAIR, 2" ACP OVERLAY, |
0430-01-054 | SH 352 | Actual | AUG 2011 | $1,992,064 | 1 | FULL DEPTH CONCRETE PVMT REPAIR, UTBHMWC, PAVEMENT MARKINGS |
0581-01-128 | LP 12 | Actual | AUG 2011 | $1,434,000 | 1 | OVERLAY HIGHWAY - PLANING, ACP OVERLAY, FULL DEPTH CONCRETE |
0581-01-131 | LP 12 | Actual | MAR 2011 | $503,753 | 1 | REPAIR SLOPE FAILURE WITH RETAINING WALLS |
0581-02-111 | LP 12 | Actual | JUN 2011 | $493,438 | 6 | REHABILITATE BRIDGE AND APPROACHES |
0581-02-135 | LP 12 | Actual | JUL 2011 | $2,995,952 | 1 | FULL DEPTH REPAIR AND ACP OVERLAY OF FRONTAGE ROADS, |
0918-00-149 | VA | Actual | APR 2011 | $111,300 | 1 | INSTALL SPREAD SPECTRUM RADIO AT SIGNALIZED INTERSECTIONS |
0918-00-161 | VA | Actual | OCT 2010 | $1,255,000 | 1 | NON - SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION |
0918-00-163 | VA | Actual | JUL 2011 | $1,556,550 | 1 | NON - SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION |
0918-00-164 | VA | Actual | JAN 2011 | $300,000 | 1 | UPGRADE AND REPAIR ITS EQUIPMENT |
0918-00-169 | VA | Actual | AUG 2011 | $266,462 | 1 | UPGRADE VIDEO DETECTION FOR HIGH SPEED APPROACHES |
0918-00-170 | VA | Actual | SEP 2010 | $399,999 | 1 | SMALL SIGN REFURBISHING - NON - SITE SPECIFIC |
0918-00-171 | VA | Actual | JAN 2011 | $177,943 | 1 | UPGRADE VIDEO DETECTION FOR HIGH SPEED APPROACHES |
0918-00-172 | VA | Actual | MAR 2011 | $348,659 | 1 | SMALL SIGN REFURBISHING - NON - SITE SPECIFIC |
0918-00-175 | VA | Actual | MAR 2011 | $625,000 | 5 | FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2011 FUNDING; |
0918-00-177 | VA | Actual | JUN 2011 | $4,262,500 | 7 | REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN |
0918-00-178 | VA | Actual | JUN 2011 | $1,000,000 | 7 | REG AERIAL PHOTO DATA COLLECT / PLAN TO IMPROVE TRAVEL DEMAND |
0918-00-179 | VA | Actual | MAY 2011 | $261,397 | 1 | REFURBISH ITS |
0918-45-532 | VA | Actual | JAN 2011 | $527,522 | 9 | CONSTRUCTION OF SIDEWALKS, ADA RAMPS AND PEDESTRIAN CROSSING |
0918-45-639 | VA | Actual | MAR 2011 | $3,945,824 | 9 | CONSTRUCT HIKE & BIKE TRAIL |
0918-45-669 | CS | Actual | JUL 2011 | $42,277,576 | ROW | REPLACE BR & APPRS |
0918-45-692 | VA | Actual | JUL 2011 | $1,300,000 | 5 | CENTRAL CONTROL SIGNAL SYSTEM |
0918-45-747 | CS | Actual | NOV 2010 | $15,998,353 | 7 | WIDEN EXISTING CITY STREET AND EXTEND ON NEW LOCATION |
0918-45-767 | VA | Actual | MAR 2011 | $947,497 | 1 | REHABILITATION OF ITS SYSTEM IN DALLAS COUNTY |
0918-45-802 | VA | Actual | APR 2011 | $1,204,288 | 10 | UPGRADE SELECT INTERSECTIONS TO CURRENT ADA STANDARDS |
0918-45-807 | CS | Actual | MAY 2011 | $3,276,574 | ROW | RECONSTRUCT AND WIDEN FROM 4 TO 6 LANE DIVIDED |
0918-45-842 | CS | Actual | SEP 2010 | $1,355,841 | 8 | CONSTRUCT SIDEWALKS AND CROSSWALKS AT BURNET ELEMENTARY |
0918-45-863 | VA | Actual | JUN 2011 | $408,721 | 1 | FULL AND PARTIAL DEPTH CONCRETE REPAIR |
0918-45-893 | PW | Actual | MAR 2011 | $1,532,712 | 10 | REHABILITATION OF PARK ROAD |
0918-45-895 | CS | Actual | JUL 2011 | $85,000 | 8 | IMPROVE TRAFFIC SIGNAL |
1068-04-142 | IH 30 | Actual | DEC 2010 | $14,780,098 | 10 | CONSTRUCT EASTBOUND FRTG RD & PARK AND RIDE FACILITY |
2374-01-162 | IH 635 | Actual | SEP 2010 | $2,888,889 | 1 | BRIDGE CLEANING AND PAINTING |
2374-03-057 | IH 20 | Actual | AUG 2011 | $5,699,998 | 1 | WIDEN BRIDGE TO TWO LANES |
2374-04-062 | IH 20 | Actual | NOV 2010 | $2,619,702 | 10 | CONSTRUCT EB TO SB RAMP AT CLARK RD |
2374-07-060 | IH 635 | Actual | AUG 2011 | $808,360 | 1 | BRIDGE REPAIR FULL DEPTH CONCRETE REPAIR |
2374-07-065 | IH 635 | Actual | AUG 2011 | $518,674 | 1 | FULL DEPTH CONCRETE REPAIR, SUBGRADE WORK AND STRIPING |
3000-01-021 | SP 408 | Actual | JUL 2011 | $3,883,284 | 1 | FULL DEPTH CONCRETE REPAIR AND OVERLAY |
Denton County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0081-06-032 | US 377 | Actual | JUL 2011 | $1,616,797 | 1 | MICROSURFACE HIGHWAY; PAVEMENT MARKINGS |
0081-13-049 | IH 35W | Actual | OCT 2010 | $2,389,480 | 1 | SEAL COAT CROSS - OVERS AND FRONTAGE ROAD SEGMENTS |
0195-02-064 | IH 35 | Actual | AUG 2011 | $76,044 | 11 | INSTALLATION OF AESTHETIC LIGHTING |
0196-02-117 | IH 35E | Actual | JAN 2011 | $617,634 | 1 | OVERLAY MAINLANES |
0353-02-060 | SH 114 | Actual | JAN 2011 | $33,333,333 | 10 | CONST 4 TO 6 MAIN LANES / DIRECT CONNECTORS SH 170 RECONST SEC |
0353-02-062 | SH 114 | Actual | OCT 2010 | $15,384,182 | 10 | CONSTRUCT FRONTAGE ROADS - PHASE 1 OF FREEWAY |
0364-03-094 | BS 121H | Actual | JUL 2011 | $295,921 | 1 | FULL DEPTH CONCRETE REPAIR |
0718-01-052 | FM 156 | Actual | DEC 2010 | $4,152,524 | 1 | ADD 10' SHOULDERS AND REHAB AND REPLACE BRIDGE AT MOORE BR |
0918-46-180 | CR | Actual | JUN 2011 | $749,276 | 6 | REPLACE BRIDGE AND APPROACHES |
1311-01-050 | FM 1171 | Actual | SEP 2010 | $147,760 | 7 | INSTALL VIDEO DETECTION EQUIPMENT AND RETIME SIGNALS |
1785-01-028 | FM 407 | Actual | JUL 2011 | $12,873,213 | 10 | WIDEN FROM 2 LANE RURAL TO 4 LANE URBAN |
2250-01-025 | LP 288 | Actual | JAN 2011 | $179,793 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING |
2353-02-015 | FM 2450 | Actual | AUG 2011 | $2,060,845 | 1 | BASE REPAIR AND 2 INCH OVERLAY |
3088-01-029 | FM 3040 | Actual | JUL 2011 | $320,275 | 1 | FULL DEPTH CONCRETE REPAIR |
Ellis County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0048-03-083 | US 77 | Actual | JUN 2011 | $1,082,453 | 8 | CONSTRUCT INTERSECTION IMPROVEMENTS |
0172-04-041 | US 287 | Actual | OCT 2010 | $3,477,140 | 1 | SEAL COAT MAINLANES AND SHOULDERS |
0260-02-038 | US 67 | Actual | FEB 2011 | $8,811,944 | 12 | CONSTRUCT GRADE - SEPARATED INTERCHANGE |
0568-01-045 | SH 34 | Actual | SEP 2010 | $219,000 | 1 | REFURBISHING EXISTING TRAFFIC SIGNAL |
1048-01-022 | FM 983 | Actual | MAY 2011 | $963,907 | 1 | REPLACE BRIDGE_AND APPROACHES |
1139-01-041 | FM 813 | Actual | OCT 2010 | $4,983,944 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD 3 FOOT PAVED |
1139-01-042 | FM 813 | Actual | OCT 2010 | $4,664,635 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH - ADD 3 FOOT PAVED |
Kaufman County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0095-03-081 | US 80 | Actual | JAN 2011 | $122,343 | 10 | LANDSCAPE DEVELOPMENT INCLUDING TREE AND SHRUB PLANTING |
0095-04-063 | US 80 | Actual | OCT 2010 | $609,668 | 1 | INSTALL RAISED MEDIAN AND ADD TRAFFIC SIGNAL |
0095-14-022 | IH 20 | Actual | JUL 2011 | $271,000 | 1 | REFURBISH GUIDE SIGNS |
0173-04-025 | SH 34 | Actual | MAR 2011 | $15,319,836 | ROW | ADD CONSTR 4 LANE DIVIDED URBAN THOROUGHFARE |
0173-04-050 | SH 34 | Actual | JUL 2011 | $184,858 | 1 | REFURBISH TRAFFIC SIGNALS |
0197-04-076 | US 175 | Actual | JUN 2011 | $153,653 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND |
0443-02-019 | SH 198 | Actual | APR 2011 | $196,900 | 8 | REFURBISH TRAFFIC SIGNALS |
0697-04-015 | FM 90 | Actual | APR 2011 | $3,447,254 | 6 | REPLACE BRIDGE AND APPROACHES |
0697-04-016 | FM 90 | Actual | JUN 2011 | $1,017,804 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0751-03-030 | FM 148 | Actual | NOV 2010 | $2,667,384 | 1 | RESURFACE HIGHWAY |
1091-02-020 | FM 740 | Actual | SEP 2010 | $1,368,669 | 1 | REHABILITATE EXISTING ROADWAY |
1092-01-015 | FM 741 | Actual | DEC 2010 | $12,279,000 | 12 | WIDEN 2 TO 4 LANE DIVIDED URBAN ROADWAY |
1217-01-014 | FM 1641 | Actual | OCT 2010 | $3,172,492 | 1 | REHABILITATE EXISTING ROAD |
Navarro County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0093-01-089 | IH 45 | Actual | OCT 2010 | $880,066 | 1 | RAMP REVERSAL |
0918-18-102 | VA | Actual | MAY 2011 | $2,030,183 | 10 | UPGRADE SELECT INTERSECTIONS TO CURRENT ADA STANDARDS |
0995-02-008 | FM 739 | Actual | FEB 2011 | $1,525,248 | 1 | RESURFACE AND RESTORE PAVEMENT STRUCTURE, OVERLAY AND |
0996-01-015 | FM 638 | Actual | JUN 2011 | $1,287,918 | 1 | REPLACE BRIDGE AND APPROACHES |
2682-01-018 | FM 2555 | Actual | JUL 2011 | $1,178,606 | 1 | OVERLAY |
Rockwall County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
1014-02-038 | FM 550 | Actual | JUL 2011 | $674,028 | 1 | BASE REPAIR, LEVEL - UP AND SEALCOAT |
1015-02-014 | FM 1139 | Actual | APR 2011 | $719,000 | 6 | REPLACE BRIDGE AND APPROACHES |
1017-01-014 | FM 552 | Actual | AUG 2011 | $3,714,077 | 8 | RECONSTRUCT AND PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
|
|