Letting Schedule for December, 2010 (FY 2011)

 
 
Last Update: Tuesday, September 6, 2011
December, 2010 (FY 2011) (see Links)
SEP 2010 | OCT 2010 | NOV 2010 | DEC 2010 | JAN 2011 | FEB 2011 | MAR 2011 | APR 2011 | MAY 2011 | JUN 2011 | JUL 2011 | AUG 2011
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0114-04-063 Bastrop/
Austin
US 290 Actual $485,011 1 FULL DEPTH, UNDERSEAL & OVERLAY WB LNS
0265-05-073 Bastrop/
Austin
SH 71 Actual $985,263 8 INSTALL MEDIAN BARRIER
2502-01-014 Bell/
Waco
LP 121 Actual $362,888 1 CONSTRUCT LEFT TURN LANE
0915-00-152 Bexar/
San Antonio
VA Actual $886,524 1 DISTRICTWIDE TRAFFIC CONTROL DEVICE FY 2011 (PROJECT 1)
0915-00-162 Bexar/
San Antonio
VA Actual $898,524 1 DISTRICTWIDE TRAFFIC CONTROL DEVICE FY 2011 (PROJECT 2)
0178-03-142 Brazoria/
Houston
SH 35 Actual $906,171 1 MILLING, ACP OVERLAY AND PAVEMENT MARKINGS
1004-01-040 Brazoria/
Houston
FM 524 Actual $5,344,887 10 REALIGNMENT OF EXISTING FM 524
0303-02-016 Briscoe/
Childress
SH 86 Actual $1,449,830 1 ASPHALTIC CONCRETE PAVEMENT OVERLAY
0102-07-042 Brooks/
Pharr
SH 285 Actual $3,276,982 1 OVERLAY
0917-30-048 Burleson/
Bryan
CR Actual $379,548 6 REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING,
0083-07-039 Camp/
Atlanta
SH 11 Actual $1,679,579 8 INSTALL CENTERLINE RUMBLE STRIPS
0345-09-010 Cherokee/
Tyler
FM 752 Actual $977,554 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0135-03-039 Collin/
Dallas
US 380 Actual $169,786 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING,
1433-02-040 Comal/
San Antonio
FM 2252 Actual $36,096 10 RAILROAD GRADE CROSSING REPLANKING
1433-02-041 Comal/
San Antonio
FM 2252 Actual $30,080 10 RAILROAD GRADE CROSSING REPLANKING
3623-01-001 Coryell/
Waco
SH 9 Actual $31,901,241 3 CONSTRUCT INITIAL TWO - LANE OF ULTIMATE FOUR - LANE DIVIDED FOR
0233-05-033 Culberson/
El Paso
SH 54 Actual $1,599,033 11 REHABILITATION TO INCLUDE HOT MIX OVERLAY, SIDEWALKS, AND
0353-06-056 Dallas/
Dallas
SH 114 Actual $831,384 1 REPAIR SLOPE FAILURE
1068-04-142 Dallas/
Dallas
IH 30 Actual $14,780,098 10 CONSTRUCT EASTBOUND FRTG RD & PARK AND RIDE FACILITY
0718-01-052 Denton/
Dallas
FM 156 Actual $4,152,524 1 ADD 10' SHOULDERS AND REHAB AND REPLACE BRIDGE AT MOORE BR
0906-00-137 Ector/
Odessa
VA Actual $197,033 11 SMALL AND LARGE SIGN REPLACEMENTS
0374-02-090 El Paso/
El Paso
US 62 Actual $6,329,634 8 CONSTRUCT NEW OVERPASS STRUCTURE AND RAMPS
0527-06-018 Fort Bend/
Houston
FM 360 Actual $299,451 1 SEAL COAT
0838-02-019 Fort Bend/
Houston
FM 442 Actual $308,150 1 SEAL COAT
1418-03-016 Fort Bend/
Houston
FM 1489 Actual $349,005 1 SEAL COAT
0912-73-172 Galveston/
Houston
VA Actual $140,475 1 CLEAN AND SEAL BRIDGE JOINTS
0113-02-054 Gillespie/
Austin
US 290 Actual $1,312,342 1 SPOT REPAIR, SEAL AND OVERLAY
0913-22-033 Gonzales/
Yoakum
CR Actual $119,466 6 REPLACE BRIDGE AND APPROACHES
0047-02-129 Grayson/
Paris
US 75 Actual $130,022 8 IMPROVE TRAFFIC SIGNAL
0050-08-089 Harris/
Houston
US 290 Actual $513,601 10 CONSTRUCT DIAMOND LANE FACILITY ON US 290 MEDIAN
0912-00-336 Harris/
Houston
VA Actual $439,964 8 INSTALL VIVDS AND INSTALL LOOPS
0912-00-385 Harris/
Houston
VA Actual $911,168 1 UPGRADE / RECONSTRUCT TRAFFIC SIGNALS
0912-00-386 Harris/
Houston
VA Actual $2,213,308 1 PAVEMENT MARKINGS (NON - SITE SPECIFIC)
0912-72-116 Harris/
Houston
VA Actual $1,865,335 1 GENERAL MAINTENANCE FOR CENTRAL HOUSTON AREA ROADWAY SYSTEM
0912-72-212 Harris/
Houston
VA Actual $2,063,800 1 PAVEMENT MARKINGS (NON - STIE SPECIFIC)
0912-72-221 Harris/
Houston
CS Actual $562,583 7 RR SIGNALS AND CROSSINGS AT PRIVATE SPURS ON TOTAL INDUSTRY
0640-01-038 Harrison/
Atlanta
FM 31 Actual $1,322,156 6 REPLACE BRIDGES AND APPROACHES
0471-02-060 Hays/
Austin
SH 21 Actual $915,085 1 SEAL & OVERLAY
0471-02-065 Hays/
Austin
SH 21 Actual $98,940 8 ADD LEFT TURN LANE
0164-02-040 Henderson/
Tyler
SH 31 Actual $3,857,763 1 RESURFACE ROADWAY
0745-02-013 Henderson/
Tyler
FM 314 Actual $686,034 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0921-02-183 Hidalgo/
Pharr
CS Actual $1,834,257 10 ACCESS TO REGIONAL MULTIMODAL CENTER AT FM 1016 AND SP 115
0921-02-184 Hidalgo/
Pharr
CS Actual $1,932,170 7 RECONSTRUCT AND WIDEN TO 4 LANES
0401-01-024 Hopkins/
Paris
SH 154 Actual $2,424,539 1 RECONSTRUCT FROM 2 - LANE WITHOUT SHOULDERS TO 2 - LANE WITH
0005-05-105 Howard/
Abilene
IH 20 Actual $2,555,217 1 SEAL COAT
0104-02-026 Jeff Davis/
El Paso
SH 17 Actual $2,579,633 1 SEAL COAT
2367-01-052 Jefferson/
Beaumont
SH 82 Actual $820,983 1 REPAIR BRIDGE DOLPHINS
0086-19-027 Jim Wells/
Corpus Christi
FM 665 Actual $490,764 8 INSTALL LEFT TURN LANE OR TWCTL
0990-01-010 Jim Wells/
Corpus Christi
FM 625 Actual $2,898,119 8 REHABILITATE AND WIDEN ROADWAY
0484-01-019 Jones/
Abilene
FM 707 Actual $2,006,348 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1092-01-015 Kaufman/
Dallas
FM 741 Actual $12,279,000 12 WIDEN 2 TO 4 LANE DIVIDED URBAN ROADWAY
0291-03-059 Kerr/
San Antonio
SH 16 Actual $606,774 8 SURFACE, SAFETY TREAT FIXED OBJECTS, PAVEMENT MARKINGS
0749-01-052 Lamar/
Paris
FM 137 Actual $3,360,694 8 GRADE SEPARATION
2591-02-010 Liberty/
Beaumont
FM 2610 Actual $1,109,660 1 RESTORE EXISTING ROADWAY
0905-00-055 Lubbock/
Lubbock
VA Actual $2,156,184 1 DISTRICT WIDE STRIPING
0299-04-064 Maverick/
Laredo
US 277 Actual $455,154 1 RESURFACE OF AN EXISTING HIGHWAY
0909-22-149 McLennan/
Waco
CS Actual $229,794 6 REPLACE BRIDGE AND APPROACHES
0909-22-157 McLennan/
Waco
CS Actual $136,055 6 REHABILITATE BRIDGE AND APPROACHES
0915-51-010 McMullen/
San Antonio
PW Actual $141,246 10 REPLACE 2 CULVERT CROSSINGS WITHIN JAMES DAUGHTREY WMA
1352-02-020 Montague/
Wichita Falls
FM 455 Actual $998,587 1 SPOT FULL DEPTH REPAIR AND OVERLAY
0675-08-104 Montgomery/
Houston
IH 45 Actual $8,966,667 1 WIDEN TO 6 MAINLANES
0305-05-041 Newton/
Beaumont
SH 87 Actual $555,885 8 SAFETY TREAT FIXED OBJECTS & INCREASE SUPERELEVATION
0617-01-174 Nueces/
Corpus Christi
SH 358 Actual $4,636,916 1 MILL AND OVERLAY
0314-07-041 Parker/
Fort Worth
IH 20 Actual $2,192,053 1 2" HMAC MILL AND OVERLAY MAINLANES AND SHOULDERS
0155-05-036 Refugio/
Corpus Christi
US 183 Actual $279,801 8 INSTALL LEFT TURN LANE OR TWO WAY CONTINUOUS TURN LANE
0180-02-037 Refugio/
Corpus Christi
SH 35 Actual $1,709,877 8 INSTALL LEFT TURN LANE OR TWCTL
0395-02-036 San Jacinto/
Lufkin
SH 150 Actual $1,706,164 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0916-28-054 San Patricio/
Corpus Christi
CS Actual $443,484 8 CONSTRUCT APPROX. 10, 000FT, 5FT SIDEWALKS / SRTS
0063-06-078 Shelby/
Lufkin
US 96 Actual $2,104,819 11 REPLACE BRIDGE AND APPROACHES
0008-13-223 Tarrant/
Fort Worth
IH 820 Actual $1,243,622 1 REPAIR FAILURES AND OVERLAY WITH 2 INCHES
0504-02-024 Tarrant/
Fort Worth
SH 121 Actual $56,237,606 10 CONSTRUCT SIX LANE TOLLWAY ON NEW LOCATION, CONSISTS OF GR.
0504-02-026 Tarrant/
Fort Worth
SH 121 Actual $91,241,537 10 CONSTRUCT SIX LANE TOLLWAY MAIN LANES ON NEW LOCATION AND
0907-00-081 Tom Green/
San Angelo
VA Actual $378,429 1 RETRACE PAVEMENT MARKINGS
0151-06-138 Travis/
Austin
LP 111 Actual $756,606 1 PVMT REPAIR, MILL, SEAL & THIN OVERLAY
0151-09-139 Travis/
Austin
US 183 Actual $1,359,832 1 PVMNT SURFACE REHAB - 2 IN PLACE RCYC
0151-09-140 Travis/
Austin
US 183 Actual $343,037 8 LENGTHEN LTL & ADD SAFETY LIGHTING
0914-04-181 Travis/
Austin
VA Actual $409,735 7 IMPROVE BIKE / PED CROSSING
1539-02-030 Travis/
Austin
FM 1626 Actual $524,797 1 20% LEVEL - UP, SEAL & OVERLAY
0023-05-076 Uvalde/
San Antonio
US 90 Actual $8,582,851 1 WIDEN ROADWAY TO PROVIDE PASSING LANES
0114-09-067 Washington/
Bryan
US 290 Actual $846,382 8 SAFETY IMPROVEMENT WORK CONSISTING OF THE INSTALLATION OF A
2690-01-035 Williamson/
Austin
FM 971 Actual $281,811 1 SEAL COAT
0921-28-006 Zapata/
Pharr
VA Actual $1,025,092 10 PARK AND BOAT RAMP IMPROVEMENTS
2628-01-007 Zavala/
Laredo
FM 1433 Actual $835,039 11 MILL AND INLAY OF EXISTING ROADWAY


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract