Letting Schedule for December, 2010 (FY 2011)
Letting Schedule for December, 2010 (FY 2011) | ||||
Last Update: Tuesday, September 6, 2011 |
December, 2010 (FY 2011) | (see Links) |
SEP 2010 | OCT 2010 | NOV 2010 | DEC 2010 | JAN 2011 | FEB 2011 | MAR 2011 | APR 2011 | MAY 2011 | JUN 2011 | JUL 2011 | AUG 2011 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0114-04-063 | Bastrop/ Austin |
US 290 | Actual | $485,011 | 1 | FULL DEPTH, UNDERSEAL & OVERLAY WB LNS |
0265-05-073 | Bastrop/ Austin |
SH 71 | Actual | $985,263 | 8 | INSTALL MEDIAN BARRIER |
2502-01-014 | Bell/ Waco |
LP 121 | Actual | $362,888 | 1 | CONSTRUCT LEFT TURN LANE |
0915-00-152 | Bexar/ San Antonio |
VA | Actual | $886,524 | 1 | DISTRICTWIDE TRAFFIC CONTROL DEVICE FY 2011 (PROJECT 1) |
0915-00-162 | Bexar/ San Antonio |
VA | Actual | $898,524 | 1 | DISTRICTWIDE TRAFFIC CONTROL DEVICE FY 2011 (PROJECT 2) |
0178-03-142 | Brazoria/ Houston |
SH 35 | Actual | $906,171 | 1 | MILLING, ACP OVERLAY AND PAVEMENT MARKINGS |
1004-01-040 | Brazoria/ Houston |
FM 524 | Actual | $5,344,887 | 10 | REALIGNMENT OF EXISTING FM 524 |
0303-02-016 | Briscoe/ Childress |
SH 86 | Actual | $1,449,830 | 1 | ASPHALTIC CONCRETE PAVEMENT OVERLAY |
0102-07-042 | Brooks/ Pharr |
SH 285 | Actual | $3,276,982 | 1 | OVERLAY |
0917-30-048 | Burleson/ Bryan |
CR | Actual | $379,548 | 6 | REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING, |
0083-07-039 | Camp/ Atlanta |
SH 11 | Actual | $1,679,579 | 8 | INSTALL CENTERLINE RUMBLE STRIPS |
0345-09-010 | Cherokee/ Tyler |
FM 752 | Actual | $977,554 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0135-03-039 | Collin/ Dallas |
US 380 | Actual | $169,786 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING, |
1433-02-040 | Comal/ San Antonio |
FM 2252 | Actual | $36,096 | 10 | RAILROAD GRADE CROSSING REPLANKING |
1433-02-041 | Comal/ San Antonio |
FM 2252 | Actual | $30,080 | 10 | RAILROAD GRADE CROSSING REPLANKING |
3623-01-001 | Coryell/ Waco |
SH 9 | Actual | $31,901,241 | 3 | CONSTRUCT INITIAL TWO - LANE OF ULTIMATE FOUR - LANE DIVIDED FOR |
0233-05-033 | Culberson/ El Paso |
SH 54 | Actual | $1,599,033 | 11 | REHABILITATION TO INCLUDE HOT MIX OVERLAY, SIDEWALKS, AND |
0353-06-056 | Dallas/ Dallas |
SH 114 | Actual | $831,384 | 1 | REPAIR SLOPE FAILURE |
1068-04-142 | Dallas/ Dallas |
IH 30 | Actual | $14,780,098 | 10 | CONSTRUCT EASTBOUND FRTG RD & PARK AND RIDE FACILITY |
0718-01-052 | Denton/ Dallas |
FM 156 | Actual | $4,152,524 | 1 | ADD 10' SHOULDERS AND REHAB AND REPLACE BRIDGE AT MOORE BR |
0906-00-137 | Ector/ Odessa |
VA | Actual | $197,033 | 11 | SMALL AND LARGE SIGN REPLACEMENTS |
0374-02-090 | El Paso/ El Paso |
US 62 | Actual | $6,329,634 | 8 | CONSTRUCT NEW OVERPASS STRUCTURE AND RAMPS |
0527-06-018 | Fort Bend/ Houston |
FM 360 | Actual | $299,451 | 1 | SEAL COAT |
0838-02-019 | Fort Bend/ Houston |
FM 442 | Actual | $308,150 | 1 | SEAL COAT |
1418-03-016 | Fort Bend/ Houston |
FM 1489 | Actual | $349,005 | 1 | SEAL COAT |
0912-73-172 | Galveston/ Houston |
VA | Actual | $140,475 | 1 | CLEAN AND SEAL BRIDGE JOINTS |
0113-02-054 | Gillespie/ Austin |
US 290 | Actual | $1,312,342 | 1 | SPOT REPAIR, SEAL AND OVERLAY |
0913-22-033 | Gonzales/ Yoakum |
CR | Actual | $119,466 | 6 | REPLACE BRIDGE AND APPROACHES |
0047-02-129 | Grayson/ Paris |
US 75 | Actual | $130,022 | 8 | IMPROVE TRAFFIC SIGNAL |
0050-08-089 | Harris/ Houston |
US 290 | Actual | $513,601 | 10 | CONSTRUCT DIAMOND LANE FACILITY ON US 290 MEDIAN |
0912-00-336 | Harris/ Houston |
VA | Actual | $439,964 | 8 | INSTALL VIVDS AND INSTALL LOOPS |
0912-00-385 | Harris/ Houston |
VA | Actual | $911,168 | 1 | UPGRADE / RECONSTRUCT TRAFFIC SIGNALS |
0912-00-386 | Harris/ Houston |
VA | Actual | $2,213,308 | 1 | PAVEMENT MARKINGS (NON - SITE SPECIFIC) |
0912-72-116 | Harris/ Houston |
VA | Actual | $1,865,335 | 1 | GENERAL MAINTENANCE FOR CENTRAL HOUSTON AREA ROADWAY SYSTEM |
0912-72-212 | Harris/ Houston |
VA | Actual | $2,063,800 | 1 | PAVEMENT MARKINGS (NON - STIE SPECIFIC) |
0912-72-221 | Harris/ Houston |
CS | Actual | $562,583 | 7 | RR SIGNALS AND CROSSINGS AT PRIVATE SPURS ON TOTAL INDUSTRY |
0640-01-038 | Harrison/ Atlanta |
FM 31 | Actual | $1,322,156 | 6 | REPLACE BRIDGES AND APPROACHES |
0471-02-060 | Hays/ Austin |
SH 21 | Actual | $915,085 | 1 | SEAL & OVERLAY |
0471-02-065 | Hays/ Austin |
SH 21 | Actual | $98,940 | 8 | ADD LEFT TURN LANE |
0164-02-040 | Henderson/ Tyler |
SH 31 | Actual | $3,857,763 | 1 | RESURFACE ROADWAY |
0745-02-013 | Henderson/ Tyler |
FM 314 | Actual | $686,034 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0921-02-183 | Hidalgo/ Pharr |
CS | Actual | $1,834,257 | 10 | ACCESS TO REGIONAL MULTIMODAL CENTER AT FM 1016 AND SP 115 |
0921-02-184 | Hidalgo/ Pharr |
CS | Actual | $1,932,170 | 7 | RECONSTRUCT AND WIDEN TO 4 LANES |
0401-01-024 | Hopkins/ Paris |
SH 154 | Actual | $2,424,539 | 1 | RECONSTRUCT FROM 2 - LANE WITHOUT SHOULDERS TO 2 - LANE WITH |
0005-05-105 | Howard/ Abilene |
IH 20 | Actual | $2,555,217 | 1 | SEAL COAT |
0104-02-026 | Jeff Davis/ El Paso |
SH 17 | Actual | $2,579,633 | 1 | SEAL COAT |
2367-01-052 | Jefferson/ Beaumont |
SH 82 | Actual | $820,983 | 1 | REPAIR BRIDGE DOLPHINS |
0086-19-027 | Jim Wells/ Corpus Christi |
FM 665 | Actual | $490,764 | 8 | INSTALL LEFT TURN LANE OR TWCTL |
0990-01-010 | Jim Wells/ Corpus Christi |
FM 625 | Actual | $2,898,119 | 8 | REHABILITATE AND WIDEN ROADWAY |
0484-01-019 | Jones/ Abilene |
FM 707 | Actual | $2,006,348 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
1092-01-015 | Kaufman/ Dallas |
FM 741 | Actual | $12,279,000 | 12 | WIDEN 2 TO 4 LANE DIVIDED URBAN ROADWAY |
0291-03-059 | Kerr/ San Antonio |
SH 16 | Actual | $606,774 | 8 | SURFACE, SAFETY TREAT FIXED OBJECTS, PAVEMENT MARKINGS |
0749-01-052 | Lamar/ Paris |
FM 137 | Actual | $3,360,694 | 8 | GRADE SEPARATION |
2591-02-010 | Liberty/ Beaumont |
FM 2610 | Actual | $1,109,660 | 1 | RESTORE EXISTING ROADWAY |
0905-00-055 | Lubbock/ Lubbock |
VA | Actual | $2,156,184 | 1 | DISTRICT WIDE STRIPING |
0299-04-064 | Maverick/ Laredo |
US 277 | Actual | $455,154 | 1 | RESURFACE OF AN EXISTING HIGHWAY |
0909-22-149 | McLennan/ Waco |
CS | Actual | $229,794 | 6 | REPLACE BRIDGE AND APPROACHES |
0909-22-157 | McLennan/ Waco |
CS | Actual | $136,055 | 6 | REHABILITATE BRIDGE AND APPROACHES |
0915-51-010 | McMullen/ San Antonio |
PW | Actual | $141,246 | 10 | REPLACE 2 CULVERT CROSSINGS WITHIN JAMES DAUGHTREY WMA |
1352-02-020 | Montague/ Wichita Falls |
FM 455 | Actual | $998,587 | 1 | SPOT FULL DEPTH REPAIR AND OVERLAY |
0675-08-104 | Montgomery/ Houston |
IH 45 | Actual | $8,966,667 | 1 | WIDEN TO 6 MAINLANES |
0305-05-041 | Newton/ Beaumont |
SH 87 | Actual | $555,885 | 8 | SAFETY TREAT FIXED OBJECTS & INCREASE SUPERELEVATION |
0617-01-174 | Nueces/ Corpus Christi |
SH 358 | Actual | $4,636,916 | 1 | MILL AND OVERLAY |
0314-07-041 | Parker/ Fort Worth |
IH 20 | Actual | $2,192,053 | 1 | 2" HMAC MILL AND OVERLAY MAINLANES AND SHOULDERS |
0155-05-036 | Refugio/ Corpus Christi |
US 183 | Actual | $279,801 | 8 | INSTALL LEFT TURN LANE OR TWO WAY CONTINUOUS TURN LANE |
0180-02-037 | Refugio/ Corpus Christi |
SH 35 | Actual | $1,709,877 | 8 | INSTALL LEFT TURN LANE OR TWCTL |
0395-02-036 | San Jacinto/ Lufkin |
SH 150 | Actual | $1,706,164 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0916-28-054 | San Patricio/ Corpus Christi |
CS | Actual | $443,484 | 8 | CONSTRUCT APPROX. 10, 000FT, 5FT SIDEWALKS / SRTS |
0063-06-078 | Shelby/ Lufkin |
US 96 | Actual | $2,104,819 | 11 | REPLACE BRIDGE AND APPROACHES |
0008-13-223 | Tarrant/ Fort Worth |
IH 820 | Actual | $1,243,622 | 1 | REPAIR FAILURES AND OVERLAY WITH 2 INCHES |
0504-02-024 | Tarrant/ Fort Worth |
SH 121 | Actual | $56,237,606 | 10 | CONSTRUCT SIX LANE TOLLWAY ON NEW LOCATION, CONSISTS OF GR. |
0504-02-026 | Tarrant/ Fort Worth |
SH 121 | Actual | $91,241,537 | 10 | CONSTRUCT SIX LANE TOLLWAY MAIN LANES ON NEW LOCATION AND |
0907-00-081 | Tom Green/ San Angelo |
VA | Actual | $378,429 | 1 | RETRACE PAVEMENT MARKINGS |
0151-06-138 | Travis/ Austin |
LP 111 | Actual | $756,606 | 1 | PVMT REPAIR, MILL, SEAL & THIN OVERLAY |
0151-09-139 | Travis/ Austin |
US 183 | Actual | $1,359,832 | 1 | PVMNT SURFACE REHAB - 2 IN PLACE RCYC |
0151-09-140 | Travis/ Austin |
US 183 | Actual | $343,037 | 8 | LENGTHEN LTL & ADD SAFETY LIGHTING |
0914-04-181 | Travis/ Austin |
VA | Actual | $409,735 | 7 | IMPROVE BIKE / PED CROSSING |
1539-02-030 | Travis/ Austin |
FM 1626 | Actual | $524,797 | 1 | 20% LEVEL - UP, SEAL & OVERLAY |
0023-05-076 | Uvalde/ San Antonio |
US 90 | Actual | $8,582,851 | 1 | WIDEN ROADWAY TO PROVIDE PASSING LANES |
0114-09-067 | Washington/ Bryan |
US 290 | Actual | $846,382 | 8 | SAFETY IMPROVEMENT WORK CONSISTING OF THE INSTALLATION OF A |
2690-01-035 | Williamson/ Austin |
FM 971 | Actual | $281,811 | 1 | SEAL COAT |
0921-28-006 | Zapata/ Pharr |
VA | Actual | $1,025,092 | 10 | PARK AND BOAT RAMP IMPROVEMENTS |
2628-01-007 | Zavala/ Laredo |
FM 1433 | Actual | $835,039 | 11 | MILL AND INLAY OF EXISTING ROADWAY |
|
|