Letting Schedule for Houston District (FY 2011)

 
 
Last Update: Tuesday, September 6, 2011
Houston District (FY 2011)
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller

Brazoria County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0178-03-142 SH 35 Actual DEC 2010 $906,171 1 MILLING, ACP OVERLAY AND PAVEMENT MARKINGS
0179-02-082 SH 35 Actual FEB 2011 $485,486 11 SIDEWALK REPAIR, SPECIAL PAVING, PAVEMENT MARKINGS AND
0586-01-063 SH 332 Actual AUG 2011 $299,499 11 REMOVE AND REPLACE EXISTING DRAINAGE STRUCTURE, RIPRAP,
0912-31-121 CS Actual OCT 2010 $369,794 9 MUSTANG TRAIL SYSTEM
0912-31-171 CR Actual JUL 2011 $789,069 6 REPLACE BRIDGE (NBI# 12020AA0707002)
0912-31-197 CS Actual MAR 2011 $649,950 6 REPLACE BRIDGE (NBI# 12020M00385001)
0912-31-238 VA Actual NOV 2010 $241,135 1 SPALL REPAIR
1003-01-089 FM 523 Actual AUG 2011 $1,083,224 8 CENTERLINE RUMBLE STRIPS
1004-01-040 FM 524 Actual DEC 2010 $5,344,887 10 REALIGNMENT OF EXISTING FM 524
1004-01-055 FM 521 Actual NOV 2010 $494,165 1 MILLING, ONE COURSE SURFACE TREATMENT, ACP OVERLAY AND
1414-03-034 FM 1462 Actual AUG 2011 $1,489,044 6 REPLACE BRIDGE AND APPROACHES

Fort Bend County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0027-12-135 US 59 Actual JAN 2011 $826,826 1 REALIGN NB FRONTAGE ROAD AND INSTALL TRENCH DRAINS ON
0089-09-079 US 59 Actual SEP 2010 $4,982,704 1 ACP LEVEL - UP, RICH BOTTOM LAYER, ACP SURF, PERMEABLE FRICTION
0192-01-088 SH 6 Actual JUL 2011 $328,271 5 IMPLEMENT PHASE 1 (PART 2) ACCESS MANAGEMENT IMPROVEMENTS
0527-06-018 FM 360 Actual DEC 2010 $299,451 1 SEAL COAT
0543-02-062 FM 359 Actual APR 2011 $737,488 1 BASE REPAIR AND OVERLAY
0543-03-069 FM 762 Actual JUN 2011 $348,629 8 CENTERLINE RUMBLE STRIPS
0838-02-019 FM 442 Actual DEC 2010 $308,150 1 SEAL COAT
0912-34-136 CR Actual JUL 2011 $157,924 6 REPLACE BRIDGE (NBI# 12080AA0958001)
0912-34-175 VA Actual AUG 2011 $594,378 10 LANDSCAPE
1257-01-046 FM 1092 Actual APR 2011 $957,059 1 BASE REPAIR AND OVERLAY
1418-03-016 FM 1489 Actual DEC 2010 $349,005 1 SEAL COAT
2105-01-044 FM 2234 Actual FEB 2011 $60,000 1 CHANGE RR SIGNAL PREEMPTION (DOT# 447 968S)
3510-04-043 SH 99 Actual AUG 2011 $10,440,499 10 CONSTRUCT OVERPASS AND APPROACHES
3510-04-046 SH 99 Actual AUG 2011 $8,940,684 10 CONSTRUCT OVERPASS AND APPROACHES (SEG D TOLL)

Galveston County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0051-03-100 SH 3 Actual JUN 2011 $462,224 1 DRAINAGE IMPROVEMENTS IN GALVESTON CO DRAINAGE DISTRICT 2
0367-02-078 SH 87 Actual AUG 2011 $64,605 8 CENTERLINE RUMBLE STRIPS
0367-06-058 SH 87 Actual AUG 2011 $323,341 5 INSTALL ARTERIAL TRAFFIC MANAGEMENT SYSTEM
0389-07-035 SH 146 Actual AUG 2011 $154,994 8 IMPROVE TRAFFIC SIGNAL
0686-02-024 FM 1765 Actual AUG 2011 $560,971 6 REPLACE BRIDGE AND APPROACHES (NBI# 12085068602003)
0912-73-113 CR Actual AUG 2011 $377,938 6 REPLACE BRIDGE AND APPROACHES
0912-73-117 CS Actual APR 2011 $3,439,505 6 REHABILITATE BRIDGE
0912-73-119 CR Actual NOV 2010 $644,610 6 REPLACE BRIDGE (NBI# 12085AA0017001)
0912-73-146 VA Actual MAY 2011 $97,083 1 CRACK SEAL
0912-73-172 VA Actual DEC 2010 $140,475 1 CLEAN AND SEAL BRIDGE JOINTS
0912-73-176 PW Actual AUG 2011 $330,787 10 CONSTRUCT INTERIM ROAD, PARKING AND EQUESTRIAN PARKING
0912-73-180 VA Actual AUG 2011 $3,284,826 10 ADA CURB RAMP PROGRAM FY 11 (VARIOUS LOCATIONS IN GALVESTON
0976-03-096 FM 518 Actual SEP 2010 $1,465,406 1 BASE REPAIR, MILLING & ACP OVERLAY
1607-01-049 FM 1764 Actual AUG 2011 $1,219,291 1 MILLING, 1" CAM, 1.5" TY - D OVERLAY & CURB REPAIR
2523-01-023 FM 2004 Actual AUG 2011 $1,626,528 1 ACP OVERLAY
3049-01-027 FM 646 Actual AUG 2011 $9,777,012 1 WIDEN FROM 2 LANES TO 4 LANES DIVIDED WITHOUT GRADE

Harris County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0050-08-089 US 290 Actual DEC 2010 $513,601 10 CONSTRUCT DIAMOND LANE FACILITY ON US 290 MEDIAN
0050-08-091 US 290 Actual AUG 2011 $446,814 8 IMPROVE TRAFFIC SIGNAL
0110-06-129 IH 45 Actual JAN 2011 $474,429 11 LANDSCAPE DEVELOPMENT
0111-01-090 FM 521 Actual MAY 2011 $113,022 1 CRACK SEAL, BASE REPAIR
0271-06-118 IH 10 Actual JAN 2011 $792,518 10 LANDSCAPING
0271-14-217 IH 610 Actual MAY 2011 151,578,392 7 RECONSTRUCT US 290 / IH 610 IC, CONSTRUCT INTERCHANGE WITH
0271-15-084 IH 610 Actual SEP 2010 $1,244,026 1 SHOULDER, GORE AND FULL DEPTH REPAIR AND RECONSTRUCT DC
0271-17-144 IH 610 Actual OCT 2010 $778,565 1 BRIDGE PREVENTATIVE MAINTENANCE AND REPAIR
0389-03-036 SH 146 Actual JUN 2011 $1,963,262 1 RICH BOTTOM LAYER REPAIR, SEAL COAT, 1" RICH BOTTOM LAYER
0389-13-055 SH 146 Actual JUL 2011 $244,342 8 IMPROVE TRAFFIC SIGNAL
0500-03-462 IH 45 Actual MAY 2011 $77,483,150 2 WIDEN AND RECONSTRUCT TO 10 MAIN LANES, TWO 3 - LANE_FRONTAGE
0500-03-553 IH 45 Actual MAY 2011 $364,992 1 ARMOR JOINT AND WIDE FLANGE BEAM REPAIRS
0500-03-563 IH 45 Actual OCT 2010 $3,069,255 1 FLOOD / DRAINAGE IMPROVEMENTS (REPLACE PUMP STATION)
0500-03-564 IH 45 Actual JUL 2011 $1,984,915 1 MILLING, SEAL COAT, RBL, PFC AND PAVEMENT MARKINGS
0508-01-334 IH 10 Actual MAY 2011 $654,970 1 REPAIR SLOPE FAILURE
0598-01-093 SH 288 Actual AUG 2011 $308,184 8 IMPROVE TRAFFIC SIGNAL
0912-00-336 VA Actual DEC 2010 $439,964 8 INSTALL VIVDS AND INSTALL LOOPS
0912-00-341 VA Actual OCT 2010 $2,782,284 10 ACCESS MANAGEMENT IMPROVEMENTS (PHASE I)
0912-00-385 VA Actual DEC 2010 $911,168 1 UPGRADE / RECONSTRUCT TRAFFIC SIGNALS
0912-00-386 VA Actual DEC 2010 $2,213,308 1 PAVEMENT MARKINGS (NON - SITE SPECIFIC)
0912-00-399 VA Actual AUG 2011 $3,134,199 1 ACCESS MANAGEMENT IMPROVEMENTS (PHASE II)
0912-00-454 VA Actual SEP 2010 $33,455 10 REMOVE VEGETATIVE DEBRIS AFTER HURRICANE IKE
0912-00-455 VA Actual JUL 2011 $1,441,142 10 LANDSCAPE DEVELOPMENT
0912-70-009 VA Actual OCT 2010 $1,067,755 10 TEXAS AVENUE STREETSCAPE PROJECT
0912-70-035 CS Actual OCT 2010 $1,011,642 7 MILL AND OVERLAY
0912-70-038 CS Actual OCT 2010 $2,526,075 7 MILL AND OVERLAY
0912-70-066 CS Actual AUG 2011 $1,034,550 10 CONSTRUCT PUMP STATION
0912-70-069 VA Actual OCT 2010 $1,675,992 5 PURCHASE EQUIPMENT FOR SYSTEM INTEGRATION
0912-70-079 VA Actual AUG 2011 $1,191,335 10 LANDSCAPE DEVELOPMENT
0912-70-080 VA Actual AUG 2011 $1,437,955 10 LANDSCAPE DEVELOPMENT
0912-71-043 CS Actual AUG 2011 $2,374,620 5 UPPER KIRBY TRAFFIC SIGNAL OPERATIONS IMPROVEMENT PROGRAM
0912-71-503 VA Actual AUG 2011 $4,586,474 5 BIKE TRAIL ON BUFFALO BAYOU PARALLEL TO MEMORIAL DR & ALLEN
0912-71-803 CS Actual AUG 2011 $4,901,088 9 WESTCHASE DISTRICT TRAIL NORTH - WESTCHASE MANAGEMENT DISTRICT
0912-71-805 CS Actual OCT 2010 $1,698,562 9 TRAIL IMPROVEMENTS INSIDE HERMANN PARK IN HOUSTON
0912-71-808 CR Actual OCT 2010 $1,782,753 9 SOUTH MAYDE CREEK PEDESTRIAN AND BICYCLE FACILITY - HARRIS
0912-72-057 CR Actual AUG 2011 $681,208 6 REPLACE BRIDGE (NBI# 12102AA0233001)
0912-72-058 CR Actual JUN 2011 $291,970 6 REPLACE BRIDGE (NBI# 12102AA0725001)
0912-72-067 CS Actual MAY 2011 $733,041 10 CONSTRUCT PEDESTRIAN TRAIL
0912-72-116 VA Actual DEC 2010 $1,865,335 1 GENERAL MAINTENANCE FOR CENTRAL HOUSTON AREA ROADWAY SYSTEM
0912-72-126 CS Actual AUG 2011 $1,167,230 6 REPLACE BRIDGE (NBI# 12102B20595001)
0912-72-141 VA Actual JUL 2011 $1,453,930 5 CBD COMMUNICATIONS SYSTEM
0912-72-197 CS Actual OCT 2010 $2,358,492 5 INSTALL TRAFFIC SIGNAL COMMUNCATIONS (FIBER, WIRELESS
0912-72-212 VA Actual DEC 2010 $2,063,800 1 PAVEMENT MARKINGS (NON - STIE SPECIFIC)
0912-72-217 CS Actual JAN 2011 $886,393 8 SIDEWALKS, CROSSWALKS, SIGNS, TRAFFIC CALMING AND BIKE RACKS
0912-72-221 CS Actual DEC 2010 $562,583 7 RR SIGNALS AND CROSSINGS AT PRIVATE SPURS ON TOTAL INDUSTRY
0912-72-274 VA Actual JAN 2011 $4,838,608 10 REPAIR TRAFFIC SIGNALS AND CONTROL CABINETS CAUSED BY
0912-72-275 VA Actual JAN 2011 $609,145 10 REPAIR AND REPLACE DAMAGED SIGNS AND POST AFTER HURRICANE
0976-01-035 FM 865 Actual AUG 2011 $9,266,318 1 WIDEN FROM 2 TO 4 LANES WITH CURB AND GUTTER (PHASE 2 AFTER
1258-04-059 FM 1093 Actual AUG 2011 $146,422 8 IMPROVE TRAFFIC SIGNAL
1685-01-094 FM 1960 Actual SEP 2010 $3,792,567 1 PLANING, SEAL COAT & ACP OVERLAY
1685-03-090 FM 1960 Actual JUL 2011 $332,396 8 IMPROVE TRAFFIC SIGNAL
1685-05-089 SH 6 Actual JUN 2011 $1,308,626 5 INTERSECTION IMPROVEMENTS
1685-05-101 SH 6 Actual AUG 2011 $256,046 8 IMPROVE TRAFFIC SIGNAL
1844-01-026 FM 1959 Actual JUN 2011 $654,429 1 OVERLAY, BASE REPAIR, AND SEAL COAT
2941-02-048 FM 2920 Actual AUG 2011 $401,310 5 INSTALL VIVDS, PAN TILT CAMERAS AND DMS AT MAJOR
3058-01-007 FM 2553 Actual JUN 2011 $420,331 1 ACP OVERLAY
3256-01-090 BW 8 Actual NOV 2010 $899,734 1 CHANNEL REHABILITATION (WEST ROAD CHANNEL #4) (FALLBROOK
3256-01-099 BW 8 Actual AUG 2011 $200,779 10 LANDSCAPE DEVELOPMENT
3256-02-082 BW 8 Actual OCT 2010 $3,234,121 10 SIGNALS AND ILLUMINATION
3256-02-086 BW 8 Actual AUG 2011 $380,586 8 IMPROVE TRAFFIC SIGNAL
3510-05-018 SH 99 Actual AUG 2011 $49,439,343 12 CONSTRUCT 2 DIRECT CONNECTORS (SEGMENT E) (TOLL)
3510-05-019 SH 99 Actual JUL 2011 115,670,596 12 CONSTRUCT 4 DIRECT CONNECTOR RAMPS E, F, G AND H (TOLL)
3510-05-022 SH 99 Actual JUL 2011 $32,334,777 12 CONSTRUCT NEW LOCATION FREEWAY AND FRONTAGE ROADS (TOLL)
3510-05-023 SH 99 Actual JUL 2011 122,892,918 12 CONSTRUCT NEW LOCATION FREEWAY (TOLL)

Montgomery County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0110-03-052 SH 75 Actual JUL 2011 $2,112,517 1 BASE REPAIR, OCST AND HOT MIX
0177-14-031 LP 494 Actual JUN 2011 $749,767 6 REPLACE BRIDGE AND APPROACHES (NBI# 12170017714044)
0338-07-023 SH 105 Actual JAN 2011 $296,542 1 WIDEN RIGHT TURN LANES
0523-09-019 FM 1488 Actual JUN 2011 $2,074,236 1 BASE REPAIR, OCST & ACP OVERLAY
0675-08-071 IH 45 Actual AUG 2011 $1,095,537 5 INSTALL COMPUTERIZED TRANSPORTATION MANAGEMENT SYSTEM
0675-08-104 IH 45 Actual DEC 2010 $8,966,667 1 WIDEN TO 6 MAINLANES
0720-02-079 FM 149 Actual JUL 2011 $3,776,985 1 BASE REPAIR, OCST AND HOT MIX
0720-02-081 FM 149 Actual APR 2011 $760,423 8 BASE REPAIR, 1.5" HOT MIX AND CENTERLINE RUMBLE STRIPS
0912-37-177 CR Actual NOV 2010 $711,911 6 REPLACE BRIDGE
0912-37-183 CR Actual JAN 2011 $470,221 6 REPLACE BRIDGE (NBI# 12170AA1953001)
0912-37-190 CS Actual AUG 2011 $2,300,989 5 CONSTRUCT INTERMODAL TERMINAL
0912-37-208 VA Actual OCT 2010 $264,150 1 CRACK SEAL AND BASE REPAIR
0912-37-212 CS Actual OCT 2010 $985,953 7 FULL DEPTH REHABILITATION
0912-37-214 CR Actual OCT 2010 $509,563 7 FULL DEPTH REHABILITATION
1400-04-035 FM 1774 Actual AUG 2011 $11,301,777 11 RECONSTRUCT ROADWAY
1706-03-007 FM 1097 Actual OCT 2010 $569,069 1 SEAL COAT
1986-01-060 FM 1314 Actual SEP 2010 $2,156,235 7 CONSTRUCT INTERSECTION IMPROVEMENTS INCLUDING RIGHT TURN
1986-01-061 FM 1314 Actual JAN 2011 $5,215,658 1 BASE REPAIR AND OCST AND HOT MIX
3538-01-040 SH 242 Actual JUL 2011 $1,258,077 5 ADD LEFT TURN LANES

Waller County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0409-02-027 SH 159 Actual APR 2011 $537,480 1 SEAL COAT, ACP O / L (SECTION) AND PAVEMENT MARKINGS
0523-02-032 FM 362 Actual MAY 2011 $4,277,602 1 ACP OVERLAY, BASE REPAIR AND WIDEN SHOULDERS
0523-02-042 FM 362 Actual FEB 2011 $491,734 8 CENTERLINE RUMBLE STRIPS
0944-02-009 FM 362 Actual APR 2011 $385,809 1 SEAL COAT
1687-01-016 FM 1736 Actual JUN 2011 $284,214 1 SEAL COAT


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract