Letting Schedule for March, 2019 County (FY 2019)
Bid Tabulations Dashboard
This report will no longer be updated, please access links on the Contract Letting page. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
|
March, 2019 (FY 2019) | (see Links) |
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0910-08-068 | Anderson/ Tyler | CR | Actual | $643,684 | 6 | REPLACE BRIDGE AND APPROACHES | 4.0 |
0336-03-071 | Angelina/ Lufkin | SH 103 | Actual | $1,219,821 | 11 | WIDENING EXISTING PAVING FOR ADDITIONAL TURNING LANES | 5.0 |
0200-01-091 | Angelina/ Lufkin | US 69 | Actual | $122,361 | 1 | INSTALL TRAFFIC SIGNAL | 0.0 |
0915-13-028 | Atascosa/ San Antonio | CR | Actual | $639,796 | 6 | REPLACE BRIDGE AND APPROACHES | 5.0 |
0017-04-042 | Atascosa/ San Antonio | IH 35 | Actual | $14,318,967 | 1 | BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON | 5.0 |
0184-03-040 | Bell/ Waco | SH 53 | Actual | $1,473,450 | 1 | PREVENTIVE MAINTENANCE | 3.0 |
2452-03-123 | Bexar/ San Antonio | SL 1604 | Actual | $3,967,436 | 1 | BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON | 0.0 |
0598-02-110 | Brazoria/ Houston | SH 288 | Actual | $2,993,148 | 1 | CONSTRUCT U-TURNS AND ACCELERATION/DECELERATION LANES | 2.5 |
0050-01-086 | Brazos/ Bryan | BS 6-R | Actual | $8,773,603 | 1 | CONCRETE PAVEMENT REPAIR | 0.0 |
0367-01-069 | Chambers/ Beaumont | SH 124 | Actual | $1,948,840 | 1 | BASE REPAIR AND OVERLAY | 0.0 |
2242-02-022 | Chambers/ Beaumont | FM 2354 | Actual | $5,959,869 | 1 | ADD CENTER LEFT TURN LANE AND WIDEN SHOULDERS, ADD NB LEFT | 8.0 |
0047-06-165 | Collin/ Dallas | US 75 | Actual | $1,691,452 | 1 | FULL DEPTH CONCRETE REPAIR | 0.0 |
0183-01-045 | Comanche/ Brownwood | SH 36 | Actual | $1,497,744 | 1 | MILL AND OVERLAY | 0.0 |
0903-15-085 | Cooke/ Wichita Falls | CR | Actual | $1,063,507 | 6 | REPLACE BRIDGE AND APPROACHES | 4.0 |
0918-47-245 | Dallas/ Dallas | VA | Actual | $1,000,000 | 3 | DEVELOP A STRATEGIC MOBILITY PLAN FOR THE CITY OF DALLAS | 0.0 |
0918-00-287 | Dallas/ Dallas | VA | Actual | $700,409 | 1 | WRONG WAY DRIVING IMPLEMENTATION TO PREVENT WRONG WAY | 0.0 |
0095-13-043 | Dallas/ Dallas | IH 20 | Actual | $28,484,199 | 1 | FULL DEPTH CONCRETE REPAIR AND OVERLAY EB AND WB | 4.0 |
1905-01-009 | Dawson/ Lubbock | FM 2052 | Actual | $3,561,049 | 1 | WIDENING AND RESTORING PAVEMENT | 3.0 |
0941-02-019 | Dewitt/ Yoakum | FM 952 | Actual | $1,199,299 | 6 | REPLACE BRIDGE AND APPROACHES | 4.0 |
0906-00-176 | Ector/ Odessa | VA | Actual | $505,850 | 1 | PAVEMENT MARKINGS | 0.0 |
0906-00-177 | Ector/ Odessa | VA | Actual | $5,023,104 | 1 | PAVEMENT MARKINGS | 0.0 |
0172-05-122 | Ellis/ Dallas | US 287 | Actual | $9,679,974 | 1 | PAVEMENT REPAIR AND OVERLAY | 5.0 |
0909-38-081 | Falls/ Waco | CR | Actual | $1,400,650 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0913-28-066 | Fayette/ Yoakum | CR | Actual | $293,552 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0558-06-016 | Glasscock/ San Angelo | RM 33 | Actual | $5,712,544 | 1 | RESTORATION OF EXISTING ROAD | 3.0 |
0047-18-081 | Grayson/ Paris | US 75 | Actual | $1,838,653 | 1 | REPAIR SLOPE FAILURE AND ROADWAY | 4.0 |
0097-02-039 | Hardeman/ Childress | SH 6 | Actual | $4,678,747 | 1 | REHABILITATION OF EXISTING ROAD | 0.0 |
1062-04-022 | Harris/ Houston | FM 2100 | Actual | $44,177,829 | 2M | WIDEN TO 4-LANE DIVIDED | 9.0 |
0912-72-371 | Harris/ Houston | VA | Actual | $8,869,186 | 3 | TURN LNS, AUX LNS, RAISED MEDIANS & GEOMETRIC IMPROVEMENTS | 7.5 |
0096-09-077 | Harrison/ Atlanta | US 80 | Actual | $427,824 | 8 | IMPROVE TRAFIC SIGNAL | 0.0 |
0632-04-032 | Harrison/ Atlanta | FM 451 | Actual | $5,283,882 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE | 0.0 |
0016-03-119 | Hays/ Austin | IH 35 | Actual | $11,314,433 | 1 | MILL, SEAL AND PFC-C INLAY | 0.0 |
0342-01-074 | Hidalgo/ Pharr | SH 107 | Actual | $20,670,142 | 1 | CONSTRUCT 6 LANE DIVIDED RURAL | 6.0 |
0698-03-095 | Hidalgo/ Pharr | FM 88 | Actual | $1,875,432 | 8 | SAFETY LIGHTING | 4.0 |
0069-01-057 | Howard/ Abilene | US 87 | Actual | $1,165,075 | 11 | DRAINAGE WORK | 4.5 |
0200-14-086 | Jefferson/ Beaumont | US 69 | Actual | $2,357,356 | 11 | REMOVE EXISTING CONCRETE, RECONSTRUCT | 3.0 |
2249-01-008 | Kaufman/ Dallas | FM 460 | Actual | $1,573,310 | 1 | REHABILITATION OF EXISTING PAVEMENT AND ADD SHOULDERS | 5.0 |
0142-02-029 | Kerr/ San Antonio | IH 10 | Actual | $15,113,463 | 1 | BASE REPAIR, SEALCOAT, OVERLAY & PAVEMENT MARKINGS ON | 0.0 |
0913-29-054 | Lavaca/ Yoakum | CS | Actual | $199,277 | 3 | CONSTRUCT SIDEWALKS, CURBS, DRIVEWAYS AND ACCESSIBILITY RAMP | 0.0 |
0114-07-036 | Lee/ Austin | US 290 | Actual | $30,993,748 | 1 | RECONSTRUCT EXISTING 4-LN UNDIVIDED ROADWAY TO A 4-LN | 4.5 |
0177-03-104 | Liberty/ Beaumont | US 59 | Actual | $1,639,621 | 11 | PFC MILL AND INLAY | 0.0 |
0074-01-055 | Live Oak/ Corpus Christi | IH 37 | Actual | $1,957,013 | 1 | REHAB AND WIDEN-WEST FRTG LANES ONLY | 0.0 |
0150-04-047 | Llano/ Austin | SH 29 | Actual | $3,688,178 | 11 | CONSTRUCT SUPER 2 PASSING LANES | 7.0 |
0905-00-096 | Lubbock/ Lubbock | VA | Actual | $300,745 | 1 | SAFETY | 0.0 |
2897-01-017 | Montgomery/ Houston | FM 830 | Actual | $2,642,386 | 1 | FULL DEPTH REPAIR, PAVEMENT MARKINGS AND 2 IN OVERLAY | 6.0 |
1912-02-014 | Montgomery/ Houston | FM 2090 | Actual | $2,387,733 | 1 | FULL DEPTH REPAIR, PAVEMENT MARKINGS AND 2 IN OVERLAY | 5.0 |
1407-01-028 | Nacogdoches/ Lufkin | FM 1275 | Actual | $783,095 | 8 | SAFETY TREAT FIXED OBJECTS | 3.0 |
0006-02-115 | Nolan/ Abilene | IH 20 | Actual | $10,712,998 | 1 | MILL AND FILL WITH SPOT PAVEMENT REPAIR | 5.5 |
0074-06-219 | Nueces/ Corpus Christi | IH 37 | Actual | $10,134,337 | 1 | MILL,UNDERSEAL,OVERLAY AND NOVACHIP | 3.0 |
0916-00-212 | Nueces/ Corpus Christi | VA | Actual | $2,165,860 | 1 | 2019 DISTRICT WIDE SIGN REPLACEMENT | 0.0 |
0030-02-052 | Ochiltree/ Amarillo | US 83 | Actual | $14,178,590 | 11 | OVERLAY | 0.0 |
0030-02-053 | Ochiltree/ Amarillo | US 83 | Actual | $1,949,942 | 11 | IMPROVE TRAFFIC SIGNALS & INTERCONNECT SIGNALS | 0.0 |
0784-04-023 | Orange/ Beaumont | FM 1131 | Actual | $1,003,050 | 8 | MODERNIZE BRIDGE RAIL AND APPROACH GUARDRAIL, SAFETY TREAT | 6.0 |
0313-02-059 | Parker/ Ft Worth | FM 51 | Actual | $6,808,813 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 5.0 |
0168-01-030 | Parmer/ Lubbock | US 60 | Actual | $23,320,829 | 1 | REHABILITATION OF EXISTING ROADWAY | 2.0 |
0206-07-062 | Rusk/ Tyler | US 79 | Actual | $2,171,415 | 1 | REHABILITATE AND RESURFACE ROADWAY | 0.0 |
0910-16-140 | Smith/ Tyler | CR | Actual | $819,041 | 6 | REPLACE BRIDGE AND APPROACHES | 4.0 |
0203-08-016 | Smith/ Tyler | FM 1253 | Actual | $1,185,936 | 8 | INSTALL PROFILE EDGELINE & CENTERLINE MARKINGS | 0.0 |
0910-16-039 | Smith/ Tyler | CS | Actual | $501,859 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0902-90-113 | Tarrant/ Ft Worth | VA | Actual | $3,846,931 | 1 | LONGLINE MULTIPOLYMER STRIPING (60 & 90 MIL); RAISED PVMT | 0.0 |
0902-90-116 | Tarrant/ Ft Worth | CS | Actual | $4,378,993 | 3 | INTERSECTION AND SIGNAL IMPROVEMENTS ALONG TRINITY BLVD & | 0.0 |
0363-01-143 | Tarrant/ Ft Worth | SH 26 | Actual | $2,662,513 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0699-01-055 | Taylor/ Abilene | FM 89 | Actual | $1,877,959 | 1 | MILL AND OVERLAY | 0.0 |
0010-06-042 | Titus/ Atlanta | US 67 | Actual | $3,235,831 | 8 | SAFETY TREAT FIXED OBJECTS | 0.0 |
1176-02-019 | Titus/ Atlanta | FM 899 | Actual | $1,275,464 | 6 | REPLACE BRIDGE AND APPROACHES | 3.0 |
0914-00-399 | Travis/ Austin | VA | Actual | $1,944,393 | 1 | FY 2019 NON-SITE SPECIFIC SIGNALS | 2.5 |
0114-11-080 | Waller/ Houston | US 290 | Actual | $280,000 | 8 | INSTALL MEDIAN BARRIER | 0.0 |
0275-12-074 | Wheeler/ Childress | IH 40 | Actual | $4,818,994 | 6 | BRIDGE MAINTENANCE (ADD VEHICLE DEFLECTION WALLS) | 0.0 |
0043-20-021 | Wilbarger/ Wichita Falls | BU 287F | Actual | $518,311 | 8 | INSTALL SIDEWALKS | 5.0 |
0015-08-141 | Williamson/ Austin | IH 35 | Actual | $12,596,512 | 2M | REPLACE BRIDGE OVERPASS AND TIE-IN APPROACHES | 6.0 |
0015-08-151 | Williamson/ Austin | IH 35 | Actual | $5,094,096 | 1 | MILL, SEAL AND OVERLAY SOUTHBOUND MAIN LANES | 0.0 |
0401-03-026 | Wood/ Tyler | SH 154 | Actual | $897,151 | 8 | INSTALL PROFILE EDGELINE MARKINGS | 0.0 |
0910-35-033 | Wood/ Tyler | CR | Actual | $389,734 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
1390-03-005 | Wood/ Tyler | FM 1254 | Actual | $1,673,512 | 6 | REPLACE BRIDGE & APPROACHES | 6.0 |
|