Detail Letting Schedule for Hunt County (FY 2022)

Last Update: Tuesday, May 11, 2021

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Hunt County (FY 2022)

CCSJ: 0009-06-052

District:PARISLet Date:Dec 2021
Highway:SH 66Let Status:Tentative
Project ID:CSJ:0009-06-052
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 6Fund Cat:1
Limits To:US 69ESTIMATE:$560,385
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:IH 30Let Status:Tentative
Project ID:CSJ:0009-13-179
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 24 (SFR)Fund Cat:1
Limits To:HOPKINS COUNTY LINEESTIMATE:$336,645
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:IH 30Let Status:Tentative
Project ID:CSJ:0009-13-180
Description:MAINTENANCE & OPERATIONS PROJECTHandling
Code:
 
Limits From:ROCKWALL COUNTY LINE (N FR)Fund Cat:1
Limits To:MONTY STRATTON (N FRONTAGE RD)ESTIMATE:$62,335
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:IH 30Let Status:Tentative
Project ID:CSJ:0009-13-181
Description:MAINTENANCE & OPERATIONS PROJECTHandling
Code:
 
Limits From:ROCKWALL COUNTY LINE (S FR)Fund Cat:1
Limits To:MONTY STRATTON (S FRONTAGE RD)ESTIMATE:$66,563
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:IH 30Let Status:Tentative
Project ID:CSJ:0009-13-182
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 24 (NFR)Fund Cat:1
Limits To:HOPKINS COUNTY LINE (NFR)ESTIMATE:$51,268
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:US 67Let Status:Tentative
Project ID:CSJ:0010-04-023
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 37Fund Cat:1
Limits To:HOPKINS COUNTY LINEESTIMATE:$32,473
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:SH 56Let Status:Tentative
Project ID:CSJ:0045-06-055
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SL 205Fund Cat:1
Limits To:US 82ESTIMATE:$123,088
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:US 82Let Status:Tentative
Project ID:CSJ:0045-20-023
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:GRAYSON COUNTY LINE (WB)Fund Cat:1
Limits To:SH 121ESTIMATE:$496,800
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:US 82Let Status:Tentative
Project ID:CSJ:0045-20-024
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:GRAYSON COUNTY LINE (EB)Fund Cat:1
Limits To:SH 121ESTIMATE:$496,800
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:US 69Let Status:Tentative
Project ID:CSJ:0047-01-072
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:US 75 (NB)Fund Cat:1
Limits To:MLK/SH 91 (NB)ESTIMATE:$19,278
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:US 69Let Status:Tentative
Project ID:CSJ:0047-01-073
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:US 69 (SB)Fund Cat:1
Limits To:MLK/SH 91 (SB)ESTIMATE:$19,278
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:BU 377BLet Status:Tentative
Project ID:CSJ:0081-08-011
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:US 377 NFund Cat:1
Limits To:US 377 SESTIMATE:$216,720
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:SH 289Let Status:Tentative
Project ID:CSJ:0091-01-056
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 56Fund Cat:1
Limits To:COLLIN COUNTY LINEESTIMATE:$110,663
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:SH 34Let Status:Tentative
Project ID:CSJ:0173-06-052
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 276Fund Cat:1
Limits To:KAUFMAN COUNTY LINEESTIMATE:$233,595
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 909Let Status:Tentative
Project ID:CSJ:0189-03-036
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:3RD STREETFund Cat:1
Limits To:US 271ESTIMATE:$108,332
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 131Let Status:Tentative
Project ID:CSJ:0202-08-073
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 691Fund Cat:1
Limits To:US 82ESTIMATE:$15,190
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:US 69Let Status:Tentative
Project ID:CSJ:0203-03-050
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:CR 4530 (POINT)Fund Cat:1
Limits To:FM 3299ESTIMATE:$287,280
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:US 69Let Status:Tentative
Project ID:CSJ:0203-04-043
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 515Fund Cat:1
Limits To:WOOD COUNTY LINEESTIMATE:$55,195
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 2795Let Status:Tentative
Project ID:CSJ:0203-12-009
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:US 69 WEST OF EMORYFund Cat:1
Limits To:US 69 E OF EMORYESTIMATE:$27,888
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 2795Let Status:Tentative
Project ID:CSJ:0203-13-011
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:US 69Fund Cat:1
Limits To:FM 515ESTIMATE:$5,768
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 84Let Status:Tentative
Project ID:CSJ:0316-02-026
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:END OF MAINTENANCEFund Cat:1
Limits To:US 75ESTIMATE:$258,365
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:SL 301Let Status:Tentative
Project ID:CSJ:0400-03-014
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 19Fund Cat:1
Limits To:IH 30 (SFR)ESTIMATE:$19,348
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:Let Status:Tentative
Project ID:CSJ:0401-01-033
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 11Fund Cat:1
Limits To:FM 1567 NESTIMATE:$53,921
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:SH 160Let Status:Tentative
Project ID:CSJ:0410-02-042
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 11Fund Cat:1
Limits To:COLLIN COUNTY LINEESTIMATE:$51,380
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 902Let Status:Tentative
Project ID:CSJ:0510-02-034
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 5Fund Cat:1
Limits To:FM 2729ESTIMATE:$361,575
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 512Let Status:Tentative
Project ID:CSJ:0579-02-013
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 34Fund Cat:1
Limits To:FM 118ESTIMATE:$431,820
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:IH 30Let Status:Tentative
Project ID:CSJ:0610-01-052
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:CR 3535 (NFR)Fund Cat:1
Limits To:FM 900 (NFR)ESTIMATE:$23,688
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:Let Status:Tentative
Project ID:CSJ:0610-02-061
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:HOPKINS COUNTY LINEFund Cat:1
Limits To:TITUS COUNTY LINEESTIMATE:$74,676
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:Let Status:Tentative
Project ID:CSJ:0610-02-062
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:HOPKINS COUNTY LINEFund Cat:1
Limits To:TITUS COUNTY LINEESTIMATE:$74,676
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 68Let Status:Tentative
Project ID:C 620-1-17CSJ:0620-01-017
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 78Fund Cat:1
Limits To:SH 34ESTIMATE:$406,800
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:SH 276Let Status:Tentative
Project ID:CSJ:0641-01-037
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 34Fund Cat:1
Limits To:2 MILE BRIDGEESTIMATE:$334,440
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1567Let Status:Tentative
Project ID:CSJ:0641-02-012
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:US 69Fund Cat:1
Limits To:HOPKINS COUNTY LINEESTIMATE:$35,301
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1567Let Status:Tentative
Project ID:CSJ:0641-04-020
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 2297Fund Cat:1
Limits To:SH 154ESTIMATE:$248,355
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1567Let Status:Tentative
Project ID:CSJ:0641-05-020
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 154Fund Cat:1
Limits To:FM 2560ESTIMATE:$97,200
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 691Let Status:Tentative
Project ID:CSJ:0666-01-033
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 131 SFund Cat:1
Limits To:FM 131 NESTIMATE:$8,239
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1570Let Status:Tentative
Project ID:CSJ:0692-01-021
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 34Fund Cat:1
Limits To:IH 30ESTIMATE:$121,365
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 114Let Status:Tentative
Project ID:CSJ:0722-01-027
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:US 82Fund Cat:1
Limits To:FM 1699ESTIMATE:$472,140
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 410Let Status:Tentative
Project ID:CSJ:0722-02-044
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 411Fund Cat:1
Limits To:US 271ESTIMATE:$124,105
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 2723Let Status:Tentative
Project ID:CSJ:0723-01-040
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 21Fund Cat:1
Limits To:LAKE CYPRESS SPRINGSESTIMATE:$206,820
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 514Let Status:Tentative
Project ID:CSJ:0725-02-024
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 275 SFund Cat:1
Limits To:SH 19ESTIMATE:$15,295
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1897Let Status:Tentative
Project ID:CSJ:0728-03-015
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:END OF STATE MAINTENANCEFund Cat:1
Limits To:US 69ESTIMATE:$250,515
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 120Let Status:Tentative
Project ID:CSJ:0728-04-013
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:END OF STATE MAINTENANCEFund Cat:1
Limits To:SH 289ESTIMATE:$183,420
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 121Let Status:Tentative
Project ID:CSJ:0729-01-049
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 289Fund Cat:1
Limits To:FM 3356ESTIMATE:$49,882
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 195Let Status:Tentative
Project ID:CSJ:0730-02-057
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:AMHERST DRFund Cat:1
Limits To:FM 906ESTIMATE:$65,254
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 905Let Status:Tentative
Project ID:CSJ:0730-03-031
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:LP 286Fund Cat:1
Limits To:FM 3426ESTIMATE:$54,236
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 128Let Status:Tentative
Project ID:CSJ:0735-01-019
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 64Fund Cat:1
Limits To:FM 1533ESTIMATE:$48,300
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1870Let Status:Tentative
Project ID:CSJ:0735-05-022
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:IH 30Fund Cat:1
Limits To:SH 11ESTIMATE:$288,630
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1533Let Status:Tentative
Project ID:CSJ:0749-04-013
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 128Fund Cat:1
Limits To:FM 1530ESTIMATE:$165,870
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1396Let Status:Tentative
Project ID:CSJ:0765-03-027
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 78Fund Cat:1
Limits To:FM 273ESTIMATE:$87,120
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 69Let Status:Tentative
Project ID:CSJ:0766-01-031
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 900Fund Cat:1
Limits To:IH 30ESTIMATE:$547,425
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 513Let Status:Tentative
Project ID:CSJ:0768-01-056
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 24Fund Cat:1
Limits To:FM 499ESTIMATE:$28,890
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 513Let Status:Tentative
Project ID:CSJ:0768-02-023
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 499Fund Cat:1
Limits To:IH 30ESTIMATE:$64,260
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 47Let Status:Tentative
Project ID:CSJ:0770-01-020
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:US 69Fund Cat:1
Limits To:SH 276ESTIMATE:$109,170
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 515Let Status:Tentative
Project ID:CSJ:0771-01-018
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 2946Fund Cat:1
Limits To:WOOD COUNTY LINEESTIMATE:$15,134
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 410Let Status:Tentative
Project ID:CSJ:0772-02-018
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:US 82Fund Cat:1
Limits To:FM 411ESTIMATE:$391,860
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1159Let Status:Tentative
Project ID:CSJ:0773-02-019
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 37 NFund Cat:1
Limits To:US 82 JESTIMATE:$168,812
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1507Let Status:Tentative
Project ID:CSJ:1452-01-017
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:LP 286Fund Cat:1
Limits To:FM 905ESTIMATE:$3,633
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1499Let Status:Tentative
Project ID:CSJ:1454-01-021
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SP 1499 (EMBERSON)Fund Cat:1
Limits To:US 271ESTIMATE:$320,040
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1532Let Status:Tentative
Project ID:CSJ:1463-02-016
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 904Fund Cat:1
Limits To:FM 64ESTIMATE:$17,703
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1530Let Status:Tentative
Project ID:C 1465-1-15CSJ:1465-01-015
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 1533Fund Cat:1
Limits To:FM 64ESTIMATE:$144,990
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1896Let Status:Tentative
Project ID:CSJ:1816-02-012
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:TITUS COUNTY LINEFund Cat:1
Limits To:US 67ESTIMATE:$400,410
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 513Let Status:Tentative
Project ID:CSJ:1849-01-011
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:US 69Fund Cat:1
Limits To:RAINS COUNTY LINEESTIMATE:$256,050
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 513Let Status:Tentative
Project ID:CSJ:1849-02-007
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:HUNT COUNTY LINEFund Cat:1
Limits To:SH 276ESTIMATE:$42,885
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:SH 276Let Status:Tentative
Project ID:CSJ:1849-03-022
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:HUNT COUNTY LINEFund Cat:1
Limits To:0.6 MI W OF US 69ESTIMATE:$518,175
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1396Let Status:Tentative
Project ID:CSJ:1979-01-015
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 273Fund Cat:1
Limits To:FM 2029ESTIMATE:$332,100
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 2122Let Status:Tentative
Project ID:CSJ:2003-01-010
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 1506Fund Cat:1
Limits To:FM 137ESTIMATE:$221,400
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:SH 11Let Status:Tentative
Project ID:CSJ:2139-02-012
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 121Fund Cat:1
Limits To:SH 121 D SOUTHESTIMATE:$13,455
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:SH 11Let Status:Tentative
Project ID:CSJ:2139-03-022
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 121 D SOUTHFund Cat:1
Limits To:SH 78 (BAILEY)ESTIMATE:$302,885
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:SH 11Let Status:Tentative
Project ID:CSJ:2139-04-025
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 1563Fund Cat:1
Limits To:FM 2655ESTIMATE:$336,195
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 131Let Status:Tentative
Project ID:CSJ:2454-01-014
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 120Fund Cat:1
Limits To:FM 691ESTIMATE:$23,527
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 902Let Status:Tentative
Project ID:CSJ:2459-02-014
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:COOKE COUNTY LINEFund Cat:1
Limits To:US 377ESTIMATE:$81,990
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1570Let Status:Tentative
Project ID:CSJ:2659-01-013
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:IH 30Fund Cat:1
Limits To:SH 66ESTIMATE:$143,235
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1519Let Status:Tentative
Project ID:CSJ:2683-01-008
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 1448Fund Cat:1
Limits To:CAMP COUNTY LINEESTIMATE:$51,750
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 114Let Status:Tentative
Project ID:CSJ:2730-01-011
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 1699Fund Cat:1
Limits To:BOWIE COUNTY LINEESTIMATE:$284,130
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 2560Let Status:Tentative
Project ID:CSJ:2875-01-009
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 11Fund Cat:1
Limits To:FM 1567ESTIMATE:$240,750
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 1564Let Status:Tentative
Project ID:CSJ:3145-01-009
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 36Fund Cat:1
Limits To:SH 34ESTIMATE:$32,991
Length:0.0Actual$0
 
District:PARISLet Date:Dec 2021
Highway:FM 515Let Status:Tentative
Project ID:CSJ:3238-01-010
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 2795Fund Cat:1
Limits To:FM 2946ESTIMATE:$20,559
Length:0.0Actual$0
 
Back...
Totals for 0009-06-052
Length:0
Estimate:$13,052,684
Actual:

CCSJ: 0009-07-043

District:PARISLet Date:Apr 2022
Highway:SS 302Let Status:Tentative
Project ID:NH ( )CSJ:0009-07-043
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 34Fund Cat:1
Limits To:FM 499ESTIMATE:$590,325
Length:1.7Actual$0
 
District:PARISLet Date:Apr 2022
Highway:SS 302Let Status:Tentative
Project ID:NH ( )CSJ:0009-14-002
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:FM 499Fund Cat:1
Limits To:IH 30ESTIMATE:$104,175
Length:0.3Actual$0
 
District:PARISLet Date:Apr 2022
Highway:SS 302Let Status:Tentative
Project ID:NH ( )CSJ:0135-07-043
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:US 69Fund Cat:1
Limits To:SH 34ESTIMATE:$540,500
Length:1.8Actual$0
 
District:PARISLet Date:Apr 2022
Highway:BU 69-DLet Status:Tentative
Project ID:STP ( )CSJ:0203-01-058
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SH 34 S, ONEAL STREETFund Cat:1
Limits To:US 69ESTIMATE:$944,000
Length:0.0Actual$0
 
District:PARISLet Date:Apr 2022
Highway:SH 34Let Status:Tentative
Project ID:CSJ:0203-01-062
Description:PREVENTIVE MAINTENANCEHandling
Code:
 
Limits From:SS 302Fund Cat:1
Limits To:CROCKETT STESTIMATE:$115,000
Length:0.0Actual$0
 
Back...
Totals for 0009-07-043
Length:3.8
Estimate:$2,294,000
Actual:

CCSJ: 0009-13-183

District:PARISLet Date:Apr 2022
Highway:IH 30Let Status:Tentative
Project ID:CSJ:0009-13-183
Description:BRIDGE MAINTENANCEHandling
Code:
 
Limits From:AT SABINE RIVERFund Cat:6
Limits To:.ESTIMATE:$182,500
Length:0.0Actual$0
 
District:PARISLet Date:Apr 2022
Highway:IH 30Let Status:Tentative
Project ID:CSJ:0009-13-184
Description:BRIDGE MAINTENANCEHandling
Code:
 
Limits From:AT SABINE RIVERFund Cat:6
Limits To:.ESTIMATE:$175,500
Length:0.0Actual$0
 
District:PARISLet Date:Apr 2022
Highway:FM 38Let Status:Tentative
Project ID:CSJ:0749-02-023
Description:BRIDGE MAINTENANCEHandling
Code:
 
Limits From:AT ROWDY CREEKFund Cat:6
Limits To:.ESTIMATE:$312,810
Length:0.0Actual$0
 
Back...
Totals for 0009-13-183
Length:0
Estimate:$670,810
Actual:

CCSJ: 0136-01-066

District:PARISLet Date:Mar 2022
Highway:SH 224Let Status:Tentative
Project ID:BR ( )CSJ:0136-01-066
Description:BRIDGE REPLACEMENTHandling
Code:
 
Limits From:AT SOUTH SULPHUR RIVERFund Cat:6
Limits To:.ESTIMATE:$3,404,000
Length:0.2Actual$0
 
Back...
Totals for 0136-01-066
Length:0.2
Estimate:$3,404,000
Actual:

CCSJ: 0901-22-117

District:PARISLet Date:Jan 2022
Highway:CRLet Status:Tentative
Project ID:BR 2021(523)CSJ:0901-22-117
Description:BRIDGE REPLACEMENTHandling
Code:
 
Limits From:CR 922-2Fund Cat:6
Limits To:AT EAST CADDO CREEK BRANCHESTIMATE:$216,000
Length:0.1Actual$0
 
District:PARISLet Date:Jan 2022
Highway:CRLet Status:Tentative
Project ID:BR 2021(523)CSJ:0901-22-118
Description:BRIDGE REPLACEMENTHandling
Code:
 
Limits From:CR 922-1Fund Cat:6
Limits To:AT EAST CADDO CREEKESTIMATE:$260,000
Length:0.1Actual$0
 
District:PARISLet Date:Jan 2022
Highway:CRLet Status:Tentative
Project ID:BR 2B20(079)CSJ:0901-22-119
Description:BRIDGE REPLACEMENTHandling
Code:
 
Limits From:CR 1031Fund Cat:6
Limits To:AT HICKORY CREEK TRIBUTARYESTIMATE:$173,000
Length:0.0Actual$0
 
District:PARISLet Date:Jan 2022
Highway:CRLet Status:Tentative
Project ID:BR 2021(201)CSJ:0901-22-120
Description:BRIDGE REPLACEMENTHandling
Code:
 
Limits From:CR 1032Fund Cat:6
Limits To:AT HICKORY CREEK TRIBUTARYESTIMATE:$318,240
Length:0.0Actual$0
 
Back...
Totals for 0901-22-117
Length:0.2
Estimate:$967,240
Actual:

Handling CodeDefinition
XXProject not processed through statewide letting
TRTransfer of funds
LCProject let through local entity
LCProject not charged against district apportionment



Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract