Monthly State Let Construction Report For Austin District As Of Dec 07, 2021 Page 3 Of 7

Last Update: Wednesday, December 08, 2021
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyLEE
HighwayUS 77
FromMILAN COUNTY LINE
ToTANGLEWOOD
CSJ0211-02-028
Proj IDC 211-2-28
Work TypeOVERLAY
 
739148.96725042.6098.0
CountyLEE
HighwayUS 77
From0.488 MI S OF SH 21
To1.509 MI N OF US 290
CSJ0211-04-026
Proj IDC 211-4-26
Work TypeOVERLAY
 
2148443.75195032.819.0
Work Order03-05-21
Work Began10-19-21
Work Completed
Time Computed10-19-21
Contract Working Days80
Addl Days Granted0
Working Days Charged16
Percent Time Used20
Contractor(s)
BIG CREEK CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0211-02-028
ACME BARRICADES, LLC (0.00)
CHEROKEE SERVICES (0.00)
D. I. J. CONSTRUCTION, INC. (0.00)
WEST TEXAS ROCK RESOURCES, LLC (0.00)
Contract #01213209
Totals2887592.71662774.76920075.4131.8

CountyBURNET
HighwayUS 281
From0.1 MI S OF RM 1855
ToTHIRD ST
CSJ0252-01-079
Proj IDF 2022(113)
Work TypeOVERLAY
 
5.7415323845.570.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days96
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0252-01-079
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #11213015
Totals5323845.570.000.000.0

CountyBURNET
HighwayUS 281
FromNATURE HEIGHTS_DR
ToLANTANA DR
CSJ0252-01-082
Proj IDSTP 2020(464)MM
Work TypeINTERSECTION & OPERATIONAL IMPRV
 
0.7912904405.353084902.4999.9
Work Order02-18-20
Work Began06-15-20
Work Completed
Time Computed03-19-20
Contract Working Days128
Addl Days Granted16
Working Days Charged163
Percent Time Used113
Contractor(s)
AARON CONCRETE CONTRACTORS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0252-01-082
D. I. J. CONSTRUCTION, INC. (0.34)
ENVIRONMENTAL SAFETY SERVICES, INC. (4.58)
TEXAS ALTERNATIVE GRASSER INCORPORATED (1.45)
Contract #01203206
Totals2904405.351128.003084902.4999.9

CountyBURNET
HighwayUS 281
FromRM 2147 EAST
To0.327 MI. NORTH OF SH 71
CSJ0252-02-054
Proj IDNH 1802(537)
Work TypeADD CENTER LEFT TURN LANE & SHLDRS
 
2.1737365014.768345493.5399.9
CountyZERO COUNTIES
Highway
From
To
CSJ0252-02-062
Proj ID
Work Type
 
0.00264678.510.0
Work Order09-18-18
Work Began04-08-19
Work Completed
Time Computed10-18-18
Contract Working Days418
Addl Days Granted30
Working Days Charged446
Percent Time Used99
Contractor(s)
JORDAN FOSTER CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0252-02-054
GK CONSTRUCTION, LLC (3.69)
ROADWAY SPECIALTIES, INC. (4.61)
PENHALL COMPANY (0.01)
FARR FOUNDATION, INC. (0.92)
BEAIRD DRILLING (1.60)
WOOLERY CUSTOM FENCE CO. (0.32)
TRP CONSTRUCTION GROUP, LLC (3.68)
TEXAS MATERIALS GROUP, INC. (29.98)
TEXAS CUTTING & CORING GP, INC. (0.06)
TEX OP CONSTRUCTION, LP (1.39)
AUSTIN WOOD RECYCLING (0.03)
AARON CONCRETE CONTRACTORS, L.P. (0.48)
BRYANT & FREY CONSTRUCTION CO. (1.49)
Contract #08183025
Totals7365014.76783808.168610172.0499.9

CountyBURNET
HighwayUS 281
FromSH 71
ToBLANCO COUNTY LINE
CSJ0252-02-060
Proj IDSTP 2B20(128)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
2.5994562496.924991801.2599.9
Work Order09-18-20
Work Began11-02-20
Work Completed
Time Computed10-18-20
Contract Working Days173
Addl Days Granted17
Working Days Charged167
Percent Time Used87
Contractor(s)
BIG CREEK CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0252-02-060
EGGEMEYER LAND CLEARING, LLC (1.43)
J & M CONTRACTING, COMPANY (3.78)
D. I. J. CONSTRUCTION, INC. (1.46)
TRP CONSTRUCTION GROUP, LLC (0.23)
THE LEVY COMPANY, INC. (0.40)
FLASHER EQUIPMENT COMPANY (0.26)
TEXAS ALTERNATIVE GRASSER INCORPORATED (0.25)
Contract #08203226
Totals4562496.92909800.594991801.2599.9

CountyBLANCO
HighwayUS 281
FromUS 290 EAST
ToNORTH OF SAN SABA COURT
CSJ0253-01-061
Proj IDC 253-1-61
Work TypeOVERLAY
 
6.3522768423.253763120.0599.9
Work Order01-08-21
Work Began05-17-21
Work Completed
Time Computed05-17-21
Contract Working Days92
Addl Days Granted0
Working Days Charged90
Percent Time Used97
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0253-01-061
D. I. J. CONSTRUCTION, INC. (4.01)
INTERSTATE BARRICADES & MARKINGS, INC. (0.56)
MPB, INC. (0.24)
TEXAS MATERIALS GROUP, INC. (0.00)
Contract #12203011
Totals2768423.25135626.783763120.0599.9

CountyTRAVIS
HighwaySH 71
FromSH 130
To0.49 MILES EAST OF SH 130
CSJ0265-01-119
Proj IDC 265-1-119
Work TypeWIDEN NON-FREEWAY
 
0.4905942801.633110426.1952.3
CountyTRAVIS
HighwaySH 71
FromAT ROSS ROAD & AT KELLAM ROAD
To.
CSJ0265-02-036
Proj IDC 265-2-36
Work TypeINTERCHANGE (NEW OR RECONSTRUCTED)
 
2.11253264556.8617083715.9132.0
CountyTRAVIS
HighwaySH 71
FromAT ROSS ROAD & AT KELLAM ROAD
To.
CSJ0265-02-039
Proj IDROW 265-2-39
Work TypeRIGHT OF WAY
 
2.1121318389.661196100.9390.7
Work Order10-21-20
Work Began02-08-21
Work Completed
Time Computed11-20-20
Contract Working Days608
Addl Days Granted0
Working Days Charged195
Percent Time Used32
Contractor(s)
ZACHRY CONSTRUCTION CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 0265-01-119
M & D FOUNDATION DRILLING INDUSTRIES, INC. (1.96)
AARON CONCRETE CONTRACTORS, L.P. (12.95)
LONE STAR PAVING COMPANY (6.93)
FLASHER EQUIPMENT COMPANY (0.19)
AUSTIN WOOD RECYCLING (0.07)
A K FUQUAY CONSTRUCTION (0.13)
RUCOBA & MAYA CONSTRUCTION, LLC (0.48)
TORO BRAVO CONSTRUCTION, LLC (0.69)
TEXAS HIGHWAY WALLS (14.09)
THE LEVY COMPANY, INC. (2.03)
TORO BRAVO CONSTRUCTION, LLC (0.10)
BRYANT & FREY CONSTRUCTION CO. (0.14)
ROADWAY SPECIALTIES, INC. (0.67)
PRIMATE CONSTRUCTION, LP (0.15)
TEXAS CUTTING & CORING GP, INC. (0.04)
AUSTIN FORMULA UTILITIES, LIMITED LIABILITY COMPANY (1.33)
BADGER DAYLIGHTING CORP. (0.04)
CHLOR-SERV, INC. (0.00)
STATEWIDE MATERIALS TRANSPORT, LTD. (1.10)
RELMCO, INC. (0.32)
Contract #09203002
Totals60525748.151506073.8421390243.0335.3

CountyBASTROP
HighwaySH 21
From1.187 MI W OF SH 95
To0.668 MI W OF SH 95
CSJ0265-04-062
Proj IDNH 2019(613)
Work TypeSTR, GR, BASE, HMACP & PVMT MRKS
 
0.94850359853.4637735568.7474.9
Work Order08-15-19
Work Began08-20-19
Work Completed
Time Computed08-20-19
Contract Working Days785
Addl Days Granted5
Working Days Charged556
Percent Time Used70
Contractor(s)
CAPITAL EXCAVATION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0265-04-062
A&J REBAR LLC (2.35)
A. H. BECK FOUNDATION CO., INC. (6.88)
AUSTIN WOOD RECYCLING (0.07)
ENVIRONMENTAL SAFETY SERVICES, INC. (0.77)
FLASHER EQUIPMENT COMPANY (0.27)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.09)
THE LEVY COMPANY, INC. (0.39)
ROADWAY SPECIALTIES, INC. (0.85)
TEXAS HIGHWAY WALLS (4.85)
TEXAS MATERIALS GROUP, INC. (6.73)
TRP CONSTRUCTION GROUP, LLC (0.29)
VENTURE CONSTRUCTION, INC (0.32)
VOGES DRILLING CO. (0.14)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (1.10)
K. L. DURHAM CONSTRUCTION, L.L.C. (0.50)
J. R. (JOE) RAMON & SONS, INC. (1.78)
TEXAS TRUCKING COMPANY, INC. (0.00)
MCL CONTRACTING, LLC (0.25)
BADGER DAYLIGHTING CORP. (0.00)
KEEPAINTING, LLC (4.35)
MONOKO, LLC (0.43)
EARTH REINFORCEMENTS LLC (0.47)
A R DANIEL CONSTRUCTION SERVICES, INCORPORATED (0.09)
BREDA COMPANY, INC. (0.00)
TURNKEY OPERATIONS (0.01)
PENHALL COMPANY (0.00)
Contract #05193201
Totals50359853.46367678.6437735568.7474.9

CountyBASTROP
HighwaySH 21
From0.3 MI WEST OF FM 20
ToCHILDERS DRIVE / WEST ABUTMENT
CSJ0265-04-069
Proj IDF 2022(050)
Work TypeOVERLAY
 
2.9831972086.960.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order11-17-21
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days54
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0265-04-069
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #10213011
Totals1972086.960.000.000.0

CountyBASTROP
HighwaySH 71
FromSH 71 AND SH 21 INTERCHANGE
To.
CSJ0265-05-087
Proj IDC 265-5-87
Work TypeLANDSCAPE & SCENIC ENHANCEMENT
 
388700.00330266.5384.9
CountyBASTROP
HighwaySH 21
FromSH 21 AND PARK ROAD 1
To.
CSJ0472-01-049
Proj IDC 472-1-49
Work TypeLANDSCAPE & SCENIC ENHANCEMENT
 
204231.80138795.8267.9
Work Order07-27-20
Work Began08-31-20
Work Completed
Time Computed08-26-20
Contract Working Days180
Addl Days Granted0
Working Days Charged179
Percent Time Used99
Contractor(s)
LEGACY ENERGY SERVICES
SUBCONTRACTOR(S) FOR CCSJ: 0265-05-087
DAKOTA UTILITY CONTRACTORS, INC. (5.45)
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC (1.89)
A & G IRRIGATION & BACKFLOW, LLC (4.45)
AB"S LAWN & LANDSCAPE SOLUTIONS LLC (0.00)
Contract #06203026
Totals592931.803599.15469062.3579.1

CountyBASTROP
HighwaySL 150
FromSH 71
ToSH 95
CSJ0265-10-032
Proj IDF 2022(161)
Work TypeOVERLAY
 
1.4451115938.480.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days24
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0265-10-032
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #12213218
Totals1115938.480.000.000.0

CountyWILLIAMSON
HighwayUS 183
From0.230 MI N OF LIVE OAK DR
To0.230 MI S OF CR 212
CSJ0273-04-040
Proj IDSTP 2020(963)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
0.7801496432.621421022.0994.9
Work Order07-27-20
Work Began09-14-20
Work Completed
Time Computed08-26-20
Contract Working Days98
Addl Days Granted0
Working Days Charged81
Percent Time Used82
Contractor(s)
DAN WILLIAMS COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0273-04-040
ENVIRONMENTAL SAFETY SERVICES, INC. (4.08)
FLASHER EQUIPMENT COMPANY (2.46)
TEXAS MATERIALS GROUP, INC. (41.76)
Contract #06203014
Totals1496432.627968.001421022.0994.9

CountyWILLIAMSON
HighwayUS 183
From0.230 MILES NORTH OF CR 254
To0.135 MILES NORTH OF LIVE OAK TRAIL
CSJ0273-04-046
Proj IDSTP 2022(114)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
0.9602086032.850.000.0
CountyWILLIAMSON
HighwayUS 183
From0.135 MILES SOUTH OF CR 212
To0.028 MILES SOUTH OF COLE DRIVE
CSJ0273-04-047
Proj IDSTP 2022(114)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
2.4504568388.950.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days314
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
AARON CONCRETE CONTRACTORS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0273-04-046
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #11213210
Totals6654421.800.000.000.0

CountyWILLIAMSON
HighwayUS 183
FromRM 1869
ToCR 258
CSJ0273-04-048
Proj IDF 2021(949)
Work TypeINTERSECTION & OPERATIONAL IMPRV
 
2.5855760579.270.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-21-21
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days234
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0273-04-048
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #08213014
Totals5760579.270.000.000.0

CountyGILLESPIE
HighwaySH 16
From3.037 MI W OF RM 2093
To4.337 MI W OF RM 2093
CSJ0291-01-052
Proj IDSTP 2022(115)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
920831.200.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days32
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0291-01-052
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #11213011
Totals920831.200.000.000.0

CountyWILLIAMSON
HighwayUS 79
FromAT EAST 4TH ST, SH 95 & WEST 2ND ST
ToIN TAYLOR TEXAS
CSJ0320-04-027
Proj IDNH 2019(993)
Work TypeLANDSCAPE & SCENIC ENHANCEMENT
 
0.0011038568.891017260.5197.9
Work Order07-16-19
Work Began08-06-19
Work Completed
Time Computed08-06-19
Contract Working Days119
Addl Days Granted0
Working Days Charged105
Percent Time Used88
Contractor(s)
APEX LANDSCAPE & IRRIGATION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0320-04-027
J & V UTILITY (0.86)
BUYERS BARRICADES SAN ANTONIO, LLC (2.54)
Contract #06193229
Totals1038568.893950.001017260.5197.9

CountyBASTROP
HighwaySH 95
From0.304 MI. NORTH OF LBA DRIVE
To0.236 MI. SOUTH OF LBA DRIVE
CSJ0322-01-051
Proj IDSTP 2020(964)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
0.5521850411.751823534.3498.5
Work Order07-21-20
Work Began10-19-20
Work Completed
Time Computed08-20-20
Contract Working Days118
Addl Days Granted0
Working Days Charged115
Percent Time Used97
Contractor(s)
AARON CONCRETE CONTRACTORS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0322-01-051
ROADWAY SPECIALTIES, INC. (3.14)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (8.63)
FLASHER EQUIPMENT COMPANY (1.51)
TEXAS MATERIALS GROUP, INC. (14.90)
ABC EROSION CONTROL, INC (1.36)
GREATER AUSTIN DEVELOPMENT CO., INC. (24.26)
AUSTIN FORMULA UTILITIES, LIMITED LIABILITY COMPANY (0.59)
KRL CONSTRUCTION INC. (0.41)
DELA LAGUNA CONTRACTING (0.27)
MG DRILLING (0.10)
A GREATER AUSTIN DEVELOPMENT COMPANY, INC. (24.26)
G. CARTER CONSTRUCTION COMPANY, INC. (0.00)
Contract #06203218
Totals1850411.7517038.551823534.3498.5

CountyLEE
HighwayFM 696
FromFM 112
ToSL 123
CSJ0334-03-021
Proj IDC 334-3-21
Work TypeINTERSECTION & OPERATIONAL IMPRV
 
1.1062187752.94644669.4329.4
Work Order05-20-21
Work Began08-02-21
Work Completed
Time Computed08-01-21
Contract Working Days184
Addl Days Granted0
Working Days Charged63
Percent Time Used34
Contractor(s)
KNIFE RIVER CORPORATION - SOUTH
SUBCONTRACTOR(S) FOR CCSJ: 0334-03-021
AREA WIDE PROTECTIVE, INC. (0.00)
BATTEN DRILLING, INC. (0.00)
CEN TEX HYDROSEED, INC. (0.00)
D. I. J. CONSTRUCTION, INC. (0.00)
EGGEMEYER LAND CLEARING, LLC (0.00)
MURRAY CONSTRUCTION (0.00)
ROADWAY SPECIALTIES, INC. (0.00)
Contract #04213217
Totals2187752.94184867.69644669.4329.4

CountyWILLIAMSON
HighwaySH 29
From+/- 1500 FT W OF DB WOOD
To+/- 2500 FT E OF DB WOOD
CSJ0337-01-043
Proj IDNH 2020(759)
Work TypeINTERSECTION & OPERATIONAL IMPRV
 
0.5005163694.261501192.7629.0
CountyWILLIAMSON
HighwaySH 29
FromAT WOLF RANCH ROAD
To.
CSJ0337-01-046
Proj IDCC 337-1-46
Work TypeINTERSECTION & OPERATIONAL IMPRV
 
0.107384593.6753500.0013.9
Work Order09-15-20
Work Began01-18-21
Work Completed
Time Computed10-15-20
Contract Working Days419
Addl Days Granted0
Working Days Charged108
Percent Time Used25
Contractor(s)
DAN WILLIAMS COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0337-01-043
A K FUQUAY CONSTRUCTION (0.65)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (12.35)
ENVIRONMENTAL SAFETY SERVICES, INC. (1.78)
FLASHER EQUIPMENT COMPANY (1.52)
TEXAS MATERIALS GROUP, INC. (17.56)
R K STEPHENS CONSTRUCTION, LLC (7.17)
TEXAS HIGHWAY WALLS (8.09)
AREA WIDE PROTECTIVE, INC. (0.03)
HARDY HOLE DRILLING (0.34)
KRL CONSTRUCTION INC. (0.72)
MG DRILLING (0.21)
Contract #08203216
Totals5548287.93295421.771554692.7628.0

CountyWILLIAMSON
HighwaySH 29
FromUS 183
ToDB WOOD
CSJ0337-01-050
Proj IDSTP 2022(116)HES
Work TypeTRAFFIC CONTROL DEVICES
 
57268.500.000.0
CountyWILLIAMSON
HighwayFM 3405
FromUS 183
ToCR 262
CSJ1755-03-008
Proj IDSTP 2022(116)HES
Work TypeTRAFFIC CONTROL DEVICES
 
38072.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days30
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TRP CONSTRUCTION GROUP, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0337-01-050
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #11213013
Totals95340.500.000.000.0