Monthly State Let Construction Report For San Antonio District As Of Apr 11, 2020 Page 5 Of 8

Last Update: Saturday, April 11, 2020
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyMCMULLEN
HighwaySH 72
FromSH 97
ToSH 16
CSJ0483-02-021
Proj IDSTP 2018(077)
Work TypeGR, BASE, SURF, PVMT MRKINGS
 
15.56330553964.7428290643.4292.5
Work Order10-22-18
Work Began11-26-18
Work Completed
Time Computed11-21-18
Contract Working Days354
Addl Days Granted10
Working Days Charged299
Percent Time Used86
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0483-02-021
AREA WIDE PROTECTIVE, INC. (0.06)
LONE STAR EROSION CONTROL (1.57)
FLASHER EQUIPMENT COMPANY (1.53)
DEPENDABLE FENCE & WELDING CO. INC. (0.61)
BEAVER BOYS SERVICES (0.06)
APEX HIGHWAY SERVICES, LLC (0.07)
GEOSOURCE, INC. (0.20)
MURRAY CONSTRUCTION (0.14)
PRIMATE CONSTRUCTION, INC. (0.19)
RAMI TRANSPORTATION, INC. (1.52)
JUAN DEANDA TRUCKING, LLC DBA JUAN DEANDA TRUCKING (1.52)
IVY ROSALVA CRUZ DBA IVY"S TRUCKING (1.52)
Contract #09183003
Totals30553964.741840074.1728290643.4292.5

CountyATASCOSA
HighwaySH 16
FromFM 1332
ToMCMULLEN/ATASCOSA COUNTY LINE
CSJ0517-01-043
Proj IDSTP 1802(616)
Work TypeGRAD, BSE, SURF, PAVMT MARK
 
17.77922041915.1015610532.3370.8
Work Order09-07-18
Work Began10-08-18
Work Completed
Time Computed10-07-18
Contract Working Days356
Addl Days Granted10
Working Days Charged265
Percent Time Used72
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0517-01-043
FLASHER EQUIPMENT COMPANY (3.29)
AREA WIDE PROTECTIVE, INC. (0.10)
BEAVER CONTRACTORS, LLC (1.12)
LONE STAR EROSION CONTROL (0.14)
M V HENKE COMPANY, L.L.C. (0.35)
RPV CONSTRUCTION, LLC (1.38)
HEMPHILL WBE PILE DRIVING CO. (0.05)
TEXAS CUTTING & CORING GP, INC. (0.02)
BK FIELD OPERATIONS LLC (0.09)
G 6 CONSTRUCTION, INC. (0.04)
THE LEVY COMPANY, INC. (0.05)
Contract #08183205
Totals22041915.101881184.1915610532.3370.8

CountyMCMULLEN
HighwaySH 16
FromATASCOSA/MCMULLEN COUNTY LINE
ToSH 72 E
CSJ0517-02-042
Proj IDSTP 2019(274)
Work TypeGRAD, BSE, SURF, PAV'T MRKNG
 
13.05723420629.664936467.1521.0
Work Order01-07-19
Work Began06-03-19
Work Completed
Time Computed02-06-19
Contract Working Days359
Addl Days Granted0
Working Days Charged120
Percent Time Used33
Contractor(s)
DEAN WORD COMPANY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0517-02-042
CUATRO T CONSTRUCTION, INC. (3.18)
GEOSOURCE, INC. (0.50)
LONE STAR EROSION CONTROL (1.89)
PRIMATE CONSTRUCTION, LP (0.49)
DEPENDABLE FENCE & WELDING CO. INC. (0.82)
THE LEVY COMPANY, INC. (0.07)
BLACKTOP INDUSTRIES LLC (0.18)
FLASHER EQUIPMENT COMPANY (1.55)
K-BAR SERVICES, INC. (0.14)
Contract #12183201
Totals23420629.66548601.664936467.1521.0

CountyMCMULLEN
HighwaySH 16
FromSH 72 EAST
ToDUVAL COUNTY LINE
CSJ0517-03-035
Proj IDSTP 2018(873)
Work TypeGRD, BSE, SURF, PAV'T MRK
 
28.38540124534.5216209797.5840.3
Work Order08-16-18
Work Began12-03-18
Work Completed
Time Computed09-15-18
Contract Working Days524
Addl Days Granted0
Working Days Charged247
Percent Time Used47
Contractor(s)
DEAN WORD COMPANY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0517-03-035
DELGADO"S CONTRACTORS, LLC (7.54)
D&S TEXAS ICON CONSTRUCTION (1.32)
DEPENDABLE FENCE & WELDING CO. INC. (0.50)
LONE STAR EROSION CONTROL (0.83)
MURRAY CONSTRUCTION (0.18)
THE LEVY COMPANY, INC. (0.06)
CHEROKEE SERVICES (0.46)
FLASHER EQUIPMENT COMPANY (1.92)
A BROTHERS MILLING, LLC (2.20)
K-BAR SERVICES, INC. (0.16)
Contract #07183003
Totals40124534.521558807.4616209797.5840.3

CountyBEXAR
HighwaySL 13
FromUS 90
ToLEON CREEK
CSJ0521-03-060
Proj IDC 521-3-60
Work TypeBSE RPR, MILL, SC, SURF & PAV'T MRK
 
3.8243075678.77217954.007.0
Work Order03-25-19
Work Began00-00-00
Work Completed
Time Computed04-24-19
Contract Working Days50
Addl Days Granted0
Working Days Charged1
Percent Time Used2
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0521-03-060
THE LEVY COMPANY, INC. (10.60)
FLASHER EQUIPMENT COMPANY (0.25)
Contract #02193215
Totals3075678.770.00217954.007.0

CountyBEXAR
HighwayIH 410
FromINGRAM RD.
ToUS 90
CSJ0521-04-204
Proj IDNH 1902(215)
Work TypeWF
 
6.34077171883.2718095393.9323.4
CountyBEXAR
HighwayIH 410
FromINGRAM RD.
ToUS 90
CSJ0521-04-282
Proj IDROW 521-4-282
Work TypeRIGHT OF WAY
 
6.340161000.000.000.0
Work Order07-30-19
Work Began08-29-19
Work Completed
Time Computed08-29-19
Contract Working Days805
Addl Days Granted0
Working Days Charged133
Percent Time Used16
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0521-04-204
FLASHER EQUIPMENT COMPANY (1.59)
CPAVE, INC. (0.23)
SCOTT DERR PAINTING CO, LLC (0.10)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.04)
LONE STAR EROSION CONTROL (0.19)
F & W ELECTRICAL CONTRACTORS, INC. (5.04)
ROYAL REBAR (6.28)
ROADWAY SPECIALTIES, INC. (0.78)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.46)
2 J RESOURCES COMPANY (3.74)
BUYERS BARRICADES SAN ANTONIO, LLC (0.47)
Contract #07193001
Totals77332883.271622282.4818095393.9323.3

CountyBEXAR
HighwayIH 410
From0.1 MI N OF US 90
To0.3 MI S OF SH 151
CSJ0521-04-277
Proj IDNH 1602(247)
Work TypeGRAD, STR, BASE, SURF & PAV MARK
 
2.16238980576.2034402699.1788.2
CountyBEXAR
HighwayIH 410
From0.1 MI N OF US 90
To0.3 MI S OF SH 151
CSJ0521-04-284
Proj IDNH 2017(417)
Work TypeROW UTILITY ADJUSTMENTS
 
2.1621565942.252030636.0699.9
CountyBEXAR
HighwayIH 410
FromAT US 90 WEST
ToINTERCHANGE
CSJ0521-05-118
Proj IDNH 1602(247)
Work TypeGRAD,STR,BASE,SURF & PAV MARK
 
0.39033369177.2637395341.3999.9
CountyBEXAR
HighwayIH 410
FromAT US 90 WEST
ToINTERCHANGE
CSJ0521-05-142
Proj IDROW 521-5-142
Work TypeSA ROW ACQ AND UTILITIES
 
0.39013706.0017879.8099.9
Work Order12-27-16
Work Began01-16-17
Work Completed
Time Computed01-16-17
Contract Working Days1,000
Addl Days Granted179
Working Days Charged966
Percent Time Used81
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0521-04-277
THE LEVY COMPANY, L.P. (4.94)
SCOTT DERR PAINTING CO, LLC (0.28)
GEOSOURCE, INC. (0.15)
EGGEMEYER LAND CLEARING, LLC (0.02)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.13)
BADECO, INC (0.27)
FLASHER EQUIPMENT COMPANY (0.56)
LONE STAR EROSION CONTROL (0.13)
AARON CONCRETE CONTRACTORS, L.P. (5.88)
JPC CONSTRUCTION INC DBA JC COMMUNICATIONS (0.16)
LONE STAR SITEWORK, LLC (0.29)
ROYAL REBAR (4.47)
Z & L CONCRETE CONTRACTORS, INC. (2.95)
ROADWAY SPECIALTIES, INC. (1.10)
PRESIDIO CONTRACTING, LLC (0.03)
E&E GROUP INC., DBA LIGHT IT UP ELECTRIC (0.02)
NORTEX CONCRETE LIFT & STABILIZATION, INC. (0.00)
BORTUNCO (0.00)
CALAME CONTRACTING, LLC (0.25)
AUSTIN FORMULA UTILITIES (0.50)
CPAVE, INC. (0.11)
Contract #12163001
Totals73929401.712217663.8173846556.4299.8

CountyBEXAR
HighwayIH 410
From1.4 MI SOUTH OF US 90
To0.9 MI SOUTH OF FM 2536
CSJ0521-05-145
Proj IDNH 2018(533)
Work TypeSURFACE & PAVEMENT MARKERS
 
3.7382494814.182784455.9899.9
Work Order03-14-18
Work Began05-21-18
Work Completed
Time Computed04-13-18
Contract Working Days41
Addl Days Granted11
Working Days Charged50
Percent Time Used96
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0521-05-145
FLASHER LIMITED (6.11)
E-Z BEL CONSTRUCTION, LLC (7.61)
LONE STAR EROSION CONTROL (0.42)
ENVIRONMENTAL SAFETY SERVICES, INC. (6.23)
HEARN CO. (0.50)
THE LEVY COMPANY, INC. (0.28)
Contract #02183224
Totals2494814.180.002784455.9899.9

CountyBEXAR
HighwayIH 410
FromIH 37
ToW.W. WHITE ROAD
CSJ0521-06-144
Proj IDC 521-6-144
Work TypeHIGH MAST ILLUMINATION
 
1.9611310012.921274638.5097.2
Work Order06-11-18
Work Began01-28-19
Work Completed
Time Computed07-11-18
Contract Working Days105
Addl Days Granted4
Working Days Charged107
Percent Time Used98
Contractor(s)
MICA CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 0521-06-144
RUCOBA & MAYA CONSTRUCTION, LLC (2.28)
FLASHER LIMITED (0.81)
FUQUAY, INC. (8623.52)
BREDA COMPANY, INC. (0.00)
A K FUQUAY CONSTRUCTION (3.92)
Contract #05183233
Totals1310012.920.001274638.5097.2

CountyATASCOSA
HighwaySH 16
FromAT ATASCOSA RIVER
To.
CSJ0613-02-063
Proj IDC 613-2-63
Work TypeGRAD, BSE, STR, SURF, PAV'T MRKNGS
 
0.4975704330.285412655.9494.8
Work Order06-11-18
Work Began11-26-18
Work Completed
Time Computed07-11-18
Contract Working Days252
Addl Days Granted0
Working Days Charged243
Percent Time Used96
Contractor(s)
HARPER BROTHERS CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0613-02-063
ENVIRONMENTAL SAFETY SERVICES, INC. (6.55)
GEOSOURCE, INC. (1.93)
FLASHER EQUIPMENT COMPANY (1.14)
MCL CONTRACTING, LLC (0.71)
K. L. DURHAM CONSTRUCTION, L.L.C. (1.08)
W. W. FOUNDATION DRILLING, LTD. (26.09)
HB FARMER FOUNDATION, LLC (7.38)
TEXAS MATERIALS GROUP, INC. (7.43)
Contract #05183207
Totals5704330.2854317.735412655.9494.8

CountyBEXAR
HighwayFM 1535
FromLP 1604
ToSHAVANO RANCH ROAD
CSJ0658-01-044
Proj IDSTP 2020(557)MM
Work TypeWIDEN NON-FREEWAY
 
0.7205288886.200.000.0
CountyBEXAR
HighwayFM 1535
FromLP 1604
ToSHAVANO RANCH ROAD
CSJ0658-01-047
Proj IDROW 658-1-47
Work TypeRIGHT OF WAY
 
0.720394867.500.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days305
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
J3 COMPANY, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0658-01-044
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #02203202
Totals5683753.700.000.000.0

CountyATASCOSA
HighwayFM 140
FromSH 16
ToLA PARITA CREEK
CSJ0748-05-040
Proj IDSTP 2019(110)
Work TypeGRADE, BASE, SC, SURF, PAVMT MRK
 
3.4584730331.284302825.2190.9
Work Order11-15-18
Work Began01-14-19
Work Completed
Time Computed12-15-18
Contract Working Days358
Addl Days Granted9
Working Days Charged255
Percent Time Used69
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0748-05-040
AREA WIDE PROTECTIVE, INC. (0.49)
THE LEVY COMPANY, INC. (0.11)
LONE STAR EROSION CONTROL (1.45)
MURRAY CONSTRUCTION (0.67)
PAVEMENT MARKINGS INC. (2.45)
RELMCO, INC. (15.52)
BEAVER BOYS SERVICES (0.32)
GEOSOURCE, INC. (0.00)
Contract #10183008
Totals4730331.2860019.964302825.2190.9

CountyMEDINA
HighwayFM 462
FromCR 433
ToCASTRO AVENUE
CSJ0848-04-046
Proj IDSTP 2018(596)
Work TypeWIDEN AND ADD SHOULDERS
 
2.2541968967.682063243.2399.9
Work Order04-13-18
Work Began07-05-18
Work Completed
Time Computed05-13-18
Contract Working Days257
Addl Days Granted0
Working Days Charged193
Percent Time Used75
Contractor(s)
DEAN WORD COMPANY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0848-04-046
LONE STAR EROSION CONTROL (0.71)
MV HENKE COMPANY, LLC (0.58)
FUQUAY, INC. (2.05)
SAECO ELECTRIC & UTILITY, LTD. (2.34)
DEPENDABLE FENCE & WELDING CO. INC. (1.36)
FLASHER LIMITED (1.58)
Contract #03183015
Totals1968967.680.002063243.2399.9

CountyBEXAR
HighwayVA
FromVARIOUS LOCATIONS IN ATASCOSA,
ToFRIO & MEDINA COUNTIES
CSJ0915-00-168
Proj IDSTP 2018(865)
Work TypeCONSTRUCT CURB RAMPS
 
0.0011394063.861325113.2695.0
Work Order06-11-18
Work Began12-03-18
Work Completed
Time Computed07-11-18
Contract Working Days193
Addl Days Granted0
Working Days Charged112
Percent Time Used58
Contractor(s)
TI-ZACK CONCRETE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0915-00-168
8A ELECTRIC, INC. (10.15)
AMERICAN SIGNAL EQUIPMENT CO. (1.13)
DEPENDABLE FENCE & WELDING CO. INC. (0.87)
Contract #05183010
Totals1394063.867500.001325113.2695.0

CountyBEXAR
HighwayVA
FromDISTRICTWIDE TRAFFIC CNTRL FY 2018
To.
CSJ0915-00-181
Proj IDSTP 2018(318)
Work TypeDISTRICTWIDE TRAFFIC CONTROL DEVICE
 
0.0011424651.881474425.0099.9
Work Order03-08-18
Work Began08-14-18
Work Completed
Time Computed05-01-18
Contract Working Days320
Addl Days Granted0
Working Days Charged244
Percent Time Used76
Contractor(s)
THE LEVY COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0915-00-181
C2 CONCRETE, INC. (2.14)
HIGHWAY INFRASTRUCTURE SAFETY SERVICES, INC. (3.11)
SO-TEX SERVICES LLC (1.91)
CALAME CONTRACTING, LLC (4.49)
GRUPO CONSTRUCTOR VELACOR, LLC (1.14)
C4 CONSTRUCTION SERVICES LLC (1.60)
Contract #02183215
Totals1424651.881758.171474425.0099.9

CountyBEXAR
HighwayVA
FromDISTRICTWIDE GUIDESIGNS FY18
To.
CSJ0915-00-182
Proj IDSTP 2018(733)
Work TypeDISTRICTWIDE GUIDESIGNS FY18
 
0.0011921528.611490913.6977.5
Work Order05-08-18
Work Began02-05-19
Work Completed
Time Computed06-07-18
Contract Working Days360
Addl Days Granted0
Working Days Charged215
Percent Time Used59
Contractor(s)
THE LEVY COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0915-00-182
ROADWAY SPECIALTIES, INC. (4.40)
JAG PUBLIC SAFETY, LLC (16.26)
HIGHWAY INFRASTRUCTURE SAFETY SERVICES, INC. (1.87)
Contract #04183207
Totals1921528.613500.001490913.6977.5

CountyBEXAR
HighwayVA
FromVARIOUS LOCATIONS DISTRICTWIDE
To.
CSJ0915-00-186
Proj IDSTP 1702(556)
Work TypeTRAFFIC SIGNAL REHAB/UPGRADE
 
0.0012664496.903296365.3199.9
Work Order08-11-17
Work Began02-28-19
Work Completed
Time Computed09-10-17
Contract Working Days319
Addl Days Granted25
Working Days Charged223
Percent Time Used64
Contractor(s)
E-Z BEL CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0915-00-186
FIBERTEL, LLC (0.00)
HIGHWAY INFRASTRUCTURE SAFETY SERVICES, INC. (0.47)
HEARN CO. (0.96)
ALAMO CRANE SERVICE, INC. (0.95)
Contract #07173035
Totals2664496.900.003296365.3199.9

CountyBEXAR
HighwayVA
FromDISTRICTWIDE TRAFFIC CNTRL FY 2019
To.
CSJ0915-00-191
Proj IDC 915-00-191
Work TypeDISTRICTWIDE TRAFFIC CONTROL DEVICE
 
0.0011540867.81174697.7811.3
Work Order03-18-19
Work Began00-00-00
Work Completed
Time Computed04-17-19
Contract Working Days320
Addl Days Granted0
Working Days Charged26
Percent Time Used8
Contractor(s)
THE LEVY COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0915-00-191
FLASHER EQUIPMENT COMPANY (1.65)
Contract #02193224
Totals1540867.8123064.38174697.7811.3

CountyBEXAR
HighwayVA
FromVARIOUS LOCATIONS DISTRICTWIDE
To.
CSJ0915-00-192
Proj IDSTP 2019(777)
Work TypeSIGNALS,SIGNS,PAV'T MRKS
 
0.001817876.00712632.0087.1
Work Order05-10-19
Work Began06-24-19
Work Completed
Time Computed06-09-19
Contract Working Days100
Addl Days Granted0
Working Days Charged84
Percent Time Used84
Contractor(s)
E-Z BEL CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0915-00-192
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #04193026
Totals817876.0014000.00712632.0087.1

CountyBEXAR
HighwayVA
FromDISTRICTWIDE TRAFFIC CNTRL FY 2020
To.
CSJ0915-00-198
Proj IDSTP 2020(558)
Work TypeTRAFFIC CONTROL DEVICES
 
0.0011588564.780.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-12-20
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days320
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
THE LEVY COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0915-00-198
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #02203020
Totals1588564.780.000.000.0