Item No Description Units January 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA     908.900 739.97513 5
100 2016 PREPARING ROW (TREE) (36" TO 48" DIA) EA     4.000 3,000.00000 1
100 6001 PREPARING ROW AC     .130 1,000.00000 1
100 6002 PREPARING ROW STA     3,145.900 2,235.42260 48
100 6003 PREPARING ROW (TREE) (5" TO 12" DIA) EA     18.000 1,186.00000 3
100 6004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     4.000 1,000.00000 1
100 6009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     27.000 1,886.42222 2
100 6011 PREPARING ROW (TREE) (24" TO 36" DIA.) EA     2.000 3,500.00000 1
100 6014 PREPARING ROW (TREE) (20" TO 42" DIA) EA     2.000 2,500.00000 1
104 2001 REMOVING CONC (PAV) SY     1,642.000 12.00000 1
104 2009 REMOVING CONC (RIPRAP) SY     4,313.600 14.52648 4
104 2011 REMOVING CONC (MEDIANS) SY     153.000 16.50000 1
104 2015 REMOVING CONC (SIDEWALKS) SY     20.000 100.00000 1
104 2022 REMOVING CONC (CURB AND GUTTER) LF     141.000 39.46504 2
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     2,600.000 6.50000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     232.200 14.55624 2
104 6001 REMOVING CONC (PAV) SY     104.000 45.00000 1
104 6009 REMOVING CONC (RIPRAP) SY 11.000 180.00000 30,633.800 17.18291 31
104 6011 REMOVING CONC (MEDIANS) SY     2,289.800 24.85990 6
104 6015 REMOVING CONC (SIDEWALKS) SY     5,714.000 18.76181 7
104 6017 REMOVING CONC (DRIVEWAYS) SY     7,757.000 19.49568 5
104 6021 REMOVING CONC (CURB) LF 20.000 180.00000 7,602.000 3.71185 6
104 6022 REMOVING CONC (CURB AND GUTTER) LF 74.000 25.00000 38,780.000 6.14315 15
104 6023 REMOVING CONC (CTB) LF     8,596.000 3.09935 2
104 6024 REMOVING CONC (RETAINING WALLS) SY     1,692.000 25.00000 1
104 6026 REMOVE CONC (GUTTER) LF     505.000 5.00000 1
104 6028 REMOVING CONC (MISC) SY     589.000 22.97284 5
104 6029 REMOVING CONC (CURB OR CURB & GUTTER) LF     5,828.000 12.00000 1
104 6032 REMOVING CONC (WHEELCHAIR RAMP) SY     16.650 750.00000 1
104 6036 REMOVING CONC (SIDEWALK OR RAMP) SY     171.100 77.98364 3
104 6037 REMOVE CONC (RAIL) LF     1,693.000 25.00000 1
104 6040 REMOVING CONC (PAVERS) SY     58.000 37.00000 1
104 6054 REMOVING CONCRETE (MOW STRIP) LF 2,000.000 10.00000 25,261.000 8.26929 6
105 2015 REMOVING STAB BASE & ASPH PAV (8" - 10") SY     44.000 28.00000 1
105 6002 REMOVING STAB BASE AND ASPH PAV (2") SY     295.000 11.80000 1
105 6008 REMOVING STAB BASE AND ASPH PAV (6") SY     1,143.000 8.76000 1
105 6011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     8,033.000 5.79562 4
105 6016 REMOVING STAB BASE & ASPH PAV (16") SY     12,791.000 13.00000 1
105 6019 REMOVING STAB BASE & ASPH PAV (14") SY     2,828.000 8.76000 1
105 6020 REMOVING STAB BASE & ASPH PAV (12") SY     1,452.000 34.00000 1
105 6023 REMOVING STAB BASE AND ASPH PAV (5") SY     32,926.000 5.43000 1
105 6030 REMOVING STAB BASE & ASPH PAV (8" - 14") SY     5,041.000 5.46903 2
105 6037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY     45,316.000 8.75157 2
105 6041 REMOVING STAB BASE AND ASPH PAV (8") SY     540.000 4.20000 1
105 6058 REMOVING STAB BASE & ASPH PAV (10" - 12" SY     37,520.000 9.80000 1
105 6062 REMOVING STAB BASE AND ASPH PAV (4" - 16" SY     652.000 17.00000 1
105 6069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY     21,134.000 6.00000 1
105 6070 REMOVING STAB BASE & ASPH PAV (6" - 8" SY     29,823.000 4.17775 2
105 6091 REMOVING STAB BASE & ASPH PAV (8" - 12") SY     757.000 14.00000 1
106 6002 OBLITERATING ABANDONED ROAD SY     7,410.000 12.46505 3
110 2001 EXCAVATION (ROADWAY) CY     47,694.000 14.14474 5
110 2002 EXCAVATION (CHANNEL) CY     21.000 100.00000 1
110 6001 EXCAVATION (ROADWAY) CY     487,475.540 16.55801 42
110 6002 EXCAVATION (CHANNEL) CY     10,627.000 9.69022 6
110 6003 EXCAVATION (SPECIAL) CY     966.000 50.00000 1
112 6001 SUBGRADE WIDENING (ORD COMP) STA     832.630 466.61070 4
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     14,470.000 13.59185 3
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     8,171.000 18.94918 2
132 2019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     480.000 28.00000 1
132 6003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     291,917.100 14.12836 36
132 6004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     9,102.000 17.00000 1
132 6005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     68,353.000 22.37258 8
132 6006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     1,410.000 51.80000 1
132 6019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     3,814.000 36.24164 3
134 2004 BACKFILL (TY A OR B) STA     267.000 110.00000 1
134 6001 BACKFILL (TY A) STA     717.700 264.03790 3
134 6002 BACKFILL (TY B) STA 40.700 158.00000 797.200 136.17423 2
134 6004 BACKFILL (TY A OR B) STA 470.000 100.57447 1,061.000 215.92366 6
150 6001 BLADING STA     100.000 83.50000 2
150 6002 BLADING HR     25.000 74.00000 2
152 6002 ROAD GRADER WORK (ORD COMP) SY     384.000 15.00000 1
158 2006 SPEC EXCAV WORK (VEHICLE) CY     958.000 30.00000 1
158 6006 SPEC EXCAV WORK (VEHICLE) CY     1,000.000 20.00000 1
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     384,295.000 1.40826 7
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY     1,154,359.000 1.89650 46
160 6011 FURNISHING AND PLACE TOPSOIL (4") (OPT1) SY     280.000 16.55000 1
161 6022 GENERAL USE COMPOST (4") SY     31,869.000 2.53251 3
161 6023 EROSION CONTROL COMPOST (4") SY     29,573.000 3.34648 2
161 6030 COMPOST MANUF TOPSOIL (6") SY     1,824.000 2.50000 1
162 2002 BLOCK SODDING SY     2,411.000 5.25000 1
162 6002 BLOCK SODDING SY     93,267.000 3.56729 9
162 6004 MULCH SODDING SY     5,029.000 3.79000 1
162 6008 ROLL SODDING SY     3,945.000 4.00000 1
164 2003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY     56,276.000 .15000 2
164 2007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY     100.000 3.00000 1
164 2009 BROADCAST SEED (TEMP) (WARM) SY     15,759.000 .15000 1
164 2011 BROADCAST SEED (TEMP) (COOL) SY     15,759.000 .15000 1
164 2013 STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY SY     269,889.000 .19000 1
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     57,990.000 .30728 2
164 2027 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) SY     40.000 22.12000 1
164 2047 STRAW / HAY MLCH SEED (TEMP) (WARM) SY     134,945.000 .19000 1
164 2049 STRAW / HAY MLCH SEED (TEMP) (COOL) SY     134,945.000 .19000 1
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 3,000.000 .18000 107,119.000 .10595 5
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY     234,758.000 .16445 10
164 6005 BROADCAST SEED (PERM) (URBAN) (SANDY) SY     14,162.000 .10000 1
164 6007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY     67,292.000 .26733 6
164 6009 BROADCAST SEED (TEMP) (WARM) SY     192,970.000 .13833 15
164 6011 BROADCAST SEED (TEMP) (COOL) SY     223,118.000 .14428 13
164 6021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY     6,228.000 .30000 1
164 6023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     235,341.000 .32582 9