Item No Description Units Sept 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 4.000 404,025.01500 78.000 317,951.52615 76
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 52.000 2,919.24038 735.000 4,858.80909 76
508 2002 CONSTRUCTING DETOURS SY 3,899.000 32.85000 104,383.000 34.31113 14
508 2003 CONSTRUCTING DETOURS EA     2.000 150,000.00000 1
512 2001 PORT CTB (FUR & INST) (SAFETY SH) (TY 1) LF     6,190.000 24.56998 3
512 2002 PORT CTB (FUR & INST) (SAFETY SH) (TY 2) LF     480.000 20.00000 1
512 2008 PORT CTB (FUR & INST) (LOW PROF) (TY 1) LF 860.000 55.00000 11,430.000 29.18023 6
512 2009 PORT CTB (FUR & INST) (LOW PROF) (TY 2) LF 40.000 60.00000 500.000 32.52320 5
512 2010 PORT CTB (DES SOURCE) (SAFETY SH) (TY 1) LF 6,030.000 9.00000 8,490.000 9.93975 3
512 2011 PORT CTB (DES SOURCE) (SAFETY SH) (TY 2) LF     15,353.000 9.38004 9
512 2013 PORT CTB (DES SOURCE) (SNGL SLP) (TY 1) LF     5,060.000 7.00000 1
512 2017 PORT CTB (DES SOURCE) (LOW PROF) (TY 1) LF 520.000 20.00000 4,820.000 12.07025 8
512 2018 PORT CTB (DES SOURCE) (LOW PROF) (TY 2) LF 160.000 30.00000 740.000 20.53784 8
512 2019 PORT CTB (MOVE) (SAFETY SH) (TY 1) LF 2,400.000 8.00000 5,910.000 8.02360 4
512 2020 PORT CTB (MOVE) (SAFETY SH) (TY 2) LF     8,628.000 4.87712 5
512 2022 PORT CTB (MOVE) (SNGL SLP) (TY 1) LF     2,190.000 9.00000 1
512 2026 PORT CTB (MOVE) (LOW PROF) (TY 1) LF 520.000 14.00000 22,970.000 6.52870 11
512 2027 PORT CTB (MOVE) (LOW PROF) (TY 2) LF 160.000 25.00000 2,080.000 10.66385 11
512 2028 PORT CTB (STKPL) (SAFETY SH) (TY 1) LF 6,030.000 8.00000 8,490.000 8.72827 3
512 2029 PORT CTB (STKPL) (SAFETY SH) (TY 2) LF     17,223.000 7.04665 7
512 2031 PORT CTB (STKPL) (SNGL SLP) (TY 1) LF     5,060.000 7.00000 1
512 2035 PORT CTB (STKPL) (LOW PROF) (TY 1) LF 520.000 12.00000 5,560.000 10.41540 10
512 2036 PORT CTB (STKPL) (LOW PROF) (TY 2) LF 160.000 15.00000 800.000 14.45500 10
512 2037 PORT CTB (REMOVE) (SAFETY SH) (TY 1) LF     6,130.000 6.72253 3
512 2038 PORT CTB (REMOVE) (SAFETY SH) (TY 2) LF     4,770.000 12.48096 4
512 2044 PORT CTB (REMOVE) (LOW PROF) (TY 1) LF 860.000 11.00000 11,350.000 8.45286 4
512 2045 PORT CTB (REMOVE) (LOW PROF) (TY 2) LF 40.000 15.00000 460.000 9.99826 4
512 2048 PORT CTB (FUR & INST) (F - SHAPE) (TY 1) LF     2,330.000 42.88412 3
512 2050 PORT CTB (MOVE) (F - SHAPE) (TY 1) LF     2,300.000 4.32174 2
512 2052 PORT CTB (REMOVE) (F - SHAPE) (TY 1) LF     2,360.000 8.34746 3
514 2004 PERM CONC TRF BARR (SGL SLP) (TY 1) (42" LF     199.000 62.14472 2
514 2006 PERM CONC TRF BARR (SGL SLP) (TY 3) (42" LF     480.000 95.15750 2
514 2008 PERM CONC TRF BARR (SGL SLP) (TY 2) (48" LF     3,000.000 75.00000 1
514 2009 PERM CONC TRF BARR (SGL SLP) (TY 3) (48" LF     116.000 75.00000 1
514 2039 PERM CONC TRF BARR (F - SHAPE) (SPL) LF     207.000 159.74000 1
528 2002 COLORED TEXTURED CONC (6") SY     368.000 155.00000 1
528 2003 COLORED TEXTURED CONC (8") SY     215.000 155.00000 1
528 2004 LANDSCAPE PAVERS SY     6,773.000 42.26736 3
528 2026 LANDSCAPE PAVERS (OPT1) SY 1,315.000 51.57000 1,315.000 51.57000 1
528 2028 LANDSCAPE PAVERS (OPT2) SY 625.000 51.57000 625.000 51.57000 1
529 2001 CONC CURB (TY I) LF     15,052.000 8.98047 6
529 2002 CONC CURB (TY II) LF     8,882.000 10.51204 7
529 2003 CONC CURB & GUTTER (TY I) LF 2,588.000 12.60000 23,080.000 12.42159 6
529 2004 CONC CURB & GUTTER (TY II) LF 8,113.370 13.12000 165,373.370 14.36957 19
529 2005 CONC CURB (MONO) (TY I) LF     215.000 32.24419 2
529 2006 CONC CURB (MONO) (TY II) LF 921.000 6.30000 1,853.000 10.17285 2
529 2007 CONC CURB (DOWEL) LF     4,100.000 10.36156 2
529 2009 CONCRETE CURB (SPECIAL) LF     10.000 70.00000 1
529 2029 CONC CURB & GUTTER (TY II A) LF     3,916.000 16.50000 1
529 2030 CONC CURB (MONO) (TY II A) LF     337.000 16.50000 1
529 2035 CONC CURB & GUTTER (TY II) (MOD) LF     379.000 14.00000 1
529 2060 CONC CURB & GUTTER (RIBBON) (MOD) LF     673.000 15.00000 1
529 2061 CONC CURB (TY C1) LF     797.000 49.50000 1
529 2064 CONC CURB (TY F1) LF     25.000 208.43000 1
529 2065 CONC CURB (TY F2) LF     509.000 99.89711 2
529 2066 CONC CURB (RIBBON) (MOD) LF     6,138.000 14.96137 5
529 2086 CONC CURB (DOWEL) (SLOTTED) LF     260.000 18.00000 1
529 2094 CONC CURB (TY F3) LF     7,833.000 113.65377 2
530 2004 INTERSECTIONS (CONC) SY     66.000 111.00000 1
530 2005 INTERSECTIONS (ACP) SY     1,703.000 50.21038 2
530 2006 INTERSECTIONS (SURF TREAT) SY     561.000 28.05000 1
530 2010 DRIVEWAYS (CONC) SY 2,757.000 64.80217 16,125.000 64.36037 20
530 2011 DRIVEWAYS (ACP) SY 6,933.000 32.99486 35,692.000 35.23521 20
530 2012 DRIVEWAYS (SURF TREAT) SY     4,843.000 30.19740 4
530 2014 TURNOUTS (ACP) EA     7.000 10,750.00000 1
530 2017 TURNOUTS (ACP) SY 42.000 45.00000 269.000 33.06691 3
530 2021 INTRSCT, DRVWAYS, & TURNOUT (SURF TREAT SY     1,735.000 5.20000 1
530 2029 DRIVEWAYS (OTHER) SY 66.000 70.00000 66.000 70.00000 1
530 2030 DRIVEWAYS (ACP) (TYPE 1) SY     2,568.000 30.00000 1
530 2031 DRIVEWAYS (ACP) (TYPE 2) SY     5,799.000 34.00000 1
530 2038 DRIVEWAYS (CONC) (HES) SY     5,627.000 88.00000 1
530 2075 DRIVEWAYS (GRAVEL) SY     330.500 17.18608 2
531 2004 CONC SIDEWALKS (6") SY     28,337.100 41.03911 8
531 2005 CURB RAMPS (TY 1) EA 12.000 1,343.99000 96.000 1,237.16635 15
531 2006 CURB RAMPS (TY 2) EA     33.000 1,524.35848 7
531 2007 CURB RAMPS (TY 3) EA     13.000 1,628.84615 2
531 2008 CURB RAMPS (TY 4) EA     4.000 1,700.00000 1
531 2009 CURB RAMPS (TY 6) EA     7.000 1,221.42857 3
531 2010 CURB RAMPS (TY 7) EA 1.000 1,280.99000 155.000 1,318.77052 12
531 2011 CURB RAMPS (TY 8) EA     1.000 1,300.00000 1
531 2013 CURB RAMPS (TY 20) EA     1.000 2,100.00000 1
531 2014 CURB RAMPS (TY 22) EA 1.000 2,213.38000 14.000 2,079.53286 5
531 2015 CONC SIDEWALKS (4") SY     739.990 44.95772 2
531 2016 CONC SIDEWALKS (6') (6") LF     7,660.000 28.00000 1
531 2017 CURB RAMPS (TY 21) EA     14.000 2,105.00000 7
531 2018 CURB RAMPS (SPECIAL) EA     4.000 3,744.48500 3
531 2024 CONC SIDEWALK (5") SY 4,209.300 39.90000 42,862.300 40.85605 12
531 2040 CURB RAMPS (TY 5) EA     16.000 2,197.61000 5
531 2041 CURB RAMPS (TY 10) EA     62.000 1,619.35484 9
531 2044 CURB RAMPS (TY 10) EA 3.000 1,249.49000 6.000 1,329.74833 3
531 2046 CURB RAMPS (TY 11) EA     2.000 1,600.00000 2
531 2051 CURB RAMPS (TY 10) (MOD) EA     3.000 2,500.00000 1
531 2065 CONC SIDEWALK (STEPS) SY     7.000 450.00000 1
531 2076 CONC SIDEWALK (5') (1'3") (BRIDGE) LF     378.000 322.22222 2
531 2081 CONC SIDEWALK (RAMPS) SY     632.000 46.14873 2
531 2094 CONC SIDEWALKS (SPECIAL) (TYPE A) SY     208.000 53.00000 1
531 2118 CONC SIDEWALK (8') (6") (BRIDGE) LF     150.000 869.00000 1
531 2123 CONC SIDEWALKS (BRIDGE) (SPECIAL) LF     42.000 553.18000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     132,592.000 .22569 2
536 2002 CONC MEDIAN SY     2,228.000 56.70444 6