AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - AUSTIN DISTRICT

Last Update: Friday, March 27, 2015
ITEMS 400 2001 TO 432 2015
Items Items Bid Code Range
0100 - 0193
0204 - 0275
0305 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0740 - 0752
1003 - 1122
2090 - 2308
3233 - 3283
4022 - 4668
5002 - 5991
6001 - 6834
7655 - 7655
8020 - 8973
9035 - 9054
400 2001 - 432 2015
432 2018 - 462 2010
462 2011 - 465 4004
465 4018 - 467 2228
467 2229 - 496 6043
Item No Description Units March 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
400 2001 STRUCT EXCAV CY     467.670 31.99468 4
400 2002 STRUCT EXCAV (BOX) CY     20.000 22.00000 1
400 2004 STRUCT EXCAV (BRIDGE) CY     430.600 25.52531 2
400 2005 CEM STABIL BKFL CY 258.000 145.00000 1,540.400 117.75955 13
400 2006 CUT & RESTORING PAV SY 126.000 120.00000 767.000 88.92636 5
400 2008 CUT & RESTORING PAV (ASPH) SY     1,203.000 96.01995 5
400 2017 CEM STABIL BKFL F CY     163.600 160.00000 1
400 2023 CEM STAB BKFL (BEHIND ABUTMENT) CY     25.500 200.00000 1
401 2001 FLOWABLE BACKFILL CY 27.000 120.00000 2,569.310 117.68012 16
401 6001 FLOWABLE BACKFILL CY 294.000 120.00000 294.000 120.00000 1
402 2001 TRENCH EXCAVATION PROTECTION LF 90.000 20.00000 41,026.000 2.77920 19
402 2003 TRENCH EXCAVATION PROTECTION F LF     14.000 50.00000 1
402 6001 TRENCH EXCAVATION PROTECTION LF 384.000 1.00000 384.000 1.00000 1
403 2001 TEMPORARY SPL SHORING SF 6,565.000 25.00000 59,434.000 15.97032 18
403 6001 TEMPORARY SPL SHORING SF 852.000 26.76056 852.000 26.76056 2
407 2005 SHEET PILING (PZ - 22) SF     1,888.000 2.00000 1
416 2001 DRILL SHAFT (18 IN) LF     908.000 136.62544 6
416 2002 DRILL SHAFT (24 IN) LF     636.000 177.07547 3
416 2003 DRILL SHAFT (30 IN) LF     440.000 219.36091 4
416 2004 DRILL SHAFT (36 IN) LF     7,672.000 143.17715 11
416 2006 DRILL SHAFT (48 IN) LF     744.000 194.07000 1
416 2007 DRILL SHAFT (54 IN) LF     476.000 275.00000 1
416 2008 DRILL SHAFT (60 IN) LF     508.000 325.00000 1
416 2016 DRILL SHAFT (SIGN MTS) (12 IN) LF     14.000 156.00000 1
416 2018 DRILL SHAFT (SIGN MTS) (24 IN) LF     218.000 166.56055 6
416 2019 DRILL SHAFT (SIGN MTS) (30 IN) LF     52.000 216.95000 1
416 2020 DRILL SHAFT (SIGN MTS) (36 IN) LF     100.000 256.84000 2
416 2021 DRILL SHAFT (SIGN MTS) (42 IN) LF     75.000 306.48000 2
416 2022 DRILL SHAFT (SIGN MTS) (48 IN) LF     18.000 360.00000 1
416 2023 DRILL SHAFT (SIGN MTS) (54 IN) LF     17.000 415.00000 1
416 2029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF     1,336.000 185.25353 11
416 2030 DRILL SHAFT (TRF SIG POLE) (24 IN) LF     182.400 147.15970 4
416 2031 DRILL SHAFT (TRF SIG POLE) (30 IN) LF     323.600 196.04373 7
416 2032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF     1,487.600 219.53310 13
416 2033 DRILL SHAFT (TRF SIG POLE) (42 IN) LF     40.000 250.00000 1
416 2034 DRILL SHAFT (TRF SIG POLE) (48 IN) LF     835.200 337.91408 9
416 2055 DRILL SHAFT (TRF SIG POLE) (30 IN) (ROCK LF     55.300 222.09892 2
416 2056 DRILL SHAFT (TRF SIG POLE) (36 IN) (ROCK LF     135.200 332.03077 2
416 2092 DRILL SHAFT (TRF SIG POLE) (42 IN) (ROCK) LF     20.000 425.00000 1
416 6031 DRILL SHAFT (TRF SIG POLE) (30 IN) LF 11.300 238.00000 11.300 238.00000 1
416 6032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 26.400 285.00000 26.400 285.00000 1
420 2001 CL A CONC (MISC) CY     39.000 512.14000 1
420 2002 CL B CONC (FLUME) CY     21.350 450.00000 1
420 2003 CL C CONC (ABUT) CY     859.900 773.62329 12
420 2004 CL C CONC (BENT) CY     631.200 863.90163 9
420 2006 CL C CONC (RAIL FOUNDATION) CY     278.400 470.11027 6
420 2013 CL C CONC (MISC) CY     44.000 367.97773 3
420 2016 CL C CONC (COLLAR) EA     19.000 1,057.89474 2
420 2018 CL C CONC (FOOTING) (MASS PLACEMENT) CY     375.800 475.00000 1
420 2019 CL C CONC (CAP) CY     680.600 595.73468 3
420 2020 CL C CONC (CRASHWALL) CY     54.000 1,000.00000 1
420 2029 CL S CONC (SLAB) CY     300.700 727.58563 4
420 2031 CL S CONC (SHEAR KEY) CY     7.300 500.00000 1
420 2033 CL S CONC (APPR SLAB) CY     1,724.400 384.95985 10
420 2034 CL S CONC (BRIDGE SDWLK) CY     130.500 433.89571 2
420 2049 CL S CONC (BRIDGE MEDIAN) CY     25.200 500.00000 1
420 2051 CL C CONC (COLUMN) CY     88.200 960.14172 3
420 2055 CL C CONC (COLUMN) (MASS PLACEMENT) CY     602.000 660.00000 1
420 2072 CL H CONC (BENT) (MASS PLACEMENT) CY     608.600 650.00000 1
420 2120 CL C CONC (BUS STOP) CY     277.000 450.00000 1
420 2124 CL S CONC (SLAB) SF     5,600.000 35.00000 1
420 2221 CL S CONC (JUNCTION BOX) CY     30.000 1,400.00000 1
420 2242 CL A CONC (CHANNEL LINING) CY     20.000 450.00000 1
420 6074 CL C CONC (MISC) CY 55.500 640.00000 55.500 640.00000 1
422 2001 REINF CONC SLAB SF     210,724.000 14.63555 9
423 2001 RETAINING WALL (MSE) SF     104,444.960 30.91414 3
423 2003 RETAINING WALL (MSE) (ASHLAR STONE FIN) SF     46,536.000 28.00000 1
423 2005 RETAINING WALL (TEMP WALL) SF     19,470.000 10.00000 1
423 2006 RETAINING WALL (CONC BLOCK) SF     20,684.000 27.08528 2
423 2007 RETAINING WALL (SPREAD FOOTING) SF     1,470.000 65.00000 1
423 2009 RETAINING WALL (SOIL NAILED) (FACIA) SF     4,231.000 51.46000 1
423 2011 RETAINING WALL (DRILL SHAFT) (FACIA) SF     805.000 65.00000 1
423 2012 RETAINING WALL (CAST - IN - PLACE) SF     641.000 93.00000 1
423 2050 RET. WALL (SOIL NAILED) (GUNNITE FACIA) SF     946.000 65.00000 1
423 6004 RETAINING WALL (CONC BLOCK) SF 97.000 58.00000 97.000 58.00000 1
425 2006 PRESTR CONC BOX BEAM (4B20) LF     218.000 228.13000 1
425 2007 PRESTR CONC BOX BEAM (5B20) LF     109.000 303.25000 1
425 2015 PRESTR CONC SLAB BEAM (5SB12) LF     197.110 200.00000 1
425 2016 PRESTR CONC SLAB BEAM (4SB15) LF     594.000 140.00000 1
425 2017 PRESTR CONC SLAB BEAM (5SB15) LF     198.000 140.00000 1
425 2064 PRESTR CONC GIRDER (TX28) LF     4,109.900 124.87611 3
425 2065 PRESTR CONC GIRDER (TX34) LF     1,807.000 134.61538 2
425 2066 PRESTR CONC GIRDER (TX40) LF     2,445.000 110.00000 1
425 2068 PRESTR CONC GIRDER (TX54) LF     13,788.790 139.38678 4
426 2001 POST - TENSIONING (GROUTED) MKF     1,036.000 100.00000 1
427 2003 OPAQUE SEALER FINISH SF     108,385.000 .35215 2
429 2008 CNC STR REP (VERTICAL OR OVERHEAD) SF     20.000 100.00000 1
430 2002 CL C CONC FOR EXT STR (ABUT) CY     87.500 850.68183 2
430 2008 CL C CONC FOR EXT STRU (CULV) (3'X 3') LF     12.000 288.75000 1
430 2009 CL C CONC FOR EXT STRU (CULV) (6'X 3') LF     15.000 650.00000 1
430 2024 CL C CONC FOR EXT STR (CULV) (5'X 4') LF     7.000 580.00000 1
430 2036 CL C CONC FOR EXT STRU (CULV) (8'X8') LF     20.000 1,000.00000 1
430 2045 CL C CONC FOR EXT STRU (CULV) (8'X6') LF     4.000 819.01000 1
430 2147 CL C CONC FOR EXT STR (CULV) (5 - 8'X8') LF     15.000 2,273.28000 1
430 2201 CL C CONC FOR EXT STRU (CULV) (7FTX4FT) LF     4.000 672.01000 1
432 2001 RIPRAP (CONC) (4 IN) CY 219.000 440.00000 3,670.970 372.00404 17
432 2002 RIPRAP (CONC) (5 IN) CY 337.000 420.00000 5,705.980 349.28887 27
432 2012 RIPRAP (STONE TY F) (GROUT) (8 IN) CY     7.000 106.00000 1
432 2014 RIPRAP (STONE TY F) (MORTAR) (8 IN) CY     1,470.000 325.82000 1
432 2015 RIPRAP (STONE COMMON) (DRY) (6 IN) CY     30.000 140.00000 1