AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - AUSTIN DISTRICT

Last Update: Tuesday, September 30, 2014
ITEMS 400 2001 TO 432 2014
Items Items Bid Code Range
0100 - 0193
0216 - 0275
0310 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0740 - 0760
1003 - 1122
2090 - 2277
3233 - 3283
4022 - 4668
5217 - 5816
6006 - 6834
7529 - 7529
8020 - 8973
9035 - 9035
400 2001 - 432 2014
432 2015 - 462 2017
462 2018 - 465 2743
465 2762 - 467 2213
467 2216 - 496 2074
Item No Description Units Sept 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
400 2001 STRUCT EXCAV CY 74.670 15.00000 104.670 23.30610 3
400 2002 STRUCT EXCAV (BOX) CY     981.000 10.26809 4
400 2003 STRUCT EXCAV (PIPE) CY     211.000 8.61137 2
400 2004 STRUCT EXCAV (BRIDGE) CY     430.600 25.52531 2
400 2005 CEM STABIL BKFL CY     2,479.200 109.51105 16
400 2006 CUT & RESTORING PAV SY 190.000 68.25000 2,301.000 61.66907 7
400 2008 CUT & RESTORING PAV (ASPH) SY     1,798.000 93.31591 8
400 2017 CEM STABIL BKFL F CY     163.600 160.00000 1
401 2001 FLOWABLE BACKFILL CY 338.310 105.00000 5,512.910 116.67839 20
402 2001 TRENCH EXCAVATION PROTECTION LF 1,339.000 6.30000 87,208.000 2.32509 27
403 2001 TEMPORARY SPL SHORING SF 10,937.000 18.00000 103,727.000 14.48725 26
407 2005 SHEET PILING (PZ - 22) SF     1,888.000 2.00000 1
416 2001 DRILL SHAFT (18 IN) LF 160.000 77.20000 1,257.000 125.25112 9
416 2002 DRILL SHAFT (24 IN) LF     2,585.000 175.02485 5
416 2003 DRILL SHAFT (30 IN) LF     440.000 219.36091 4
416 2004 DRILL SHAFT (36 IN) LF 1,144.000 120.91000 13,745.000 136.79907 16
416 2006 DRILL SHAFT (48 IN) LF 744.000 194.07000 2,337.000 276.66463 4
416 2007 DRILL SHAFT (54 IN) LF     476.000 275.00000 1
416 2008 DRILL SHAFT (60 IN) LF     508.000 325.00000 1
416 2016 DRILL SHAFT (SIGN MTS) (12 IN) LF     14.000 156.00000 1
416 2018 DRILL SHAFT (SIGN MTS) (24 IN) LF 104.000 149.94192 296.000 149.69662 6
416 2019 DRILL SHAFT (SIGN MTS) (30 IN) LF     52.000 216.95000 1
416 2020 DRILL SHAFT (SIGN MTS) (36 IN) LF     100.000 256.84000 2
416 2021 DRILL SHAFT (SIGN MTS) (42 IN) LF     75.000 306.48000 2
416 2022 DRILL SHAFT (SIGN MTS) (48 IN) LF     18.000 360.00000 1
416 2023 DRILL SHAFT (SIGN MTS) (54 IN) LF     17.000 415.00000 1
416 2029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 242.000 198.00000 1,424.000 184.39517 11
416 2030 DRILL SHAFT (TRF SIG POLE) (24 IN) LF     303.000 150.99960 5
416 2031 DRILL SHAFT (TRF SIG POLE) (30 IN) LF     385.600 180.40882 8
416 2032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 52.000 200.11000 1,653.800 217.72711 15
416 2033 DRILL SHAFT (TRF SIG POLE) (42 IN) LF     18.000 250.00000 1
416 2034 DRILL SHAFT (TRF SIG POLE) (48 IN) LF     681.800 325.00713 9
416 2055 DRILL SHAFT (TRF SIG POLE) (30 IN) (ROCK LF     44.300 292.14605 2
416 2056 DRILL SHAFT (TRF SIG POLE) (36 IN) (ROCK LF     122.200 324.80000 2
420 2001 CL A CONC (MISC) CY     1.000 247.11000 1
420 2002 CL B CONC (FLUME) CY 21.350 450.00000 21.350 450.00000 1
420 2003 CL C CONC (ABUT) CY 87.800 900.00000 1,746.000 681.57789 19
420 2004 CL C CONC (BENT) CY 146.200 900.00000 2,128.400 734.79650 14
420 2005 CL C CONC (FOOTING) CY     270.000 696.94444 2
420 2006 CL C CONC (RAIL FOUNDATION) CY     351.400 457.63788 9
420 2013 CL C CONC (MISC) CY     240.400 945.52529 7
420 2016 CL C CONC (COLLAR) EA     2.000 1,384.75000 2
420 2018 CL C CONC (FOOTING) (MASS PLACEMENT) CY     375.800 475.00000 1
420 2019 CL C CONC (CAP) CY     689.600 603.62097 4
420 2029 CL S CONC (SLAB) CY     1,724.600 558.56043 8
420 2031 CL S CONC (SHEAR KEY) CY     352.100 159.15623 2
420 2033 CL S CONC (APPR SLAB) CY 122.000 350.00000 3,390.200 402.60273 16
420 2034 CL S CONC (BRIDGE SDWLK) CY     433.400 479.12614 5
420 2035 CL S CONC (CIP SLAB SPAN) CY     132.600 758.55000 1
420 2049 CL S CONC (BRIDGE MEDIAN) CY     36.600 531.14754 2
420 2051 CL C CONC (COLUMN) CY     88.200 960.14172 3
420 2055 CL C CONC (COLUMN) (MASS PLACEMENT) CY     602.000 660.00000 1
420 2072 CL H CONC (BENT) (MASS PLACEMENT) CY     608.600 650.00000 1
420 2076 CL C CONC (TRAFFIC RAIL) CY     9.900 991.40909 1
420 2080 CL C CONC (DECORATIVE OBELISK) CY     48.000 948.31000 1
420 2089 CL F CONC (CAP) (MASS PLACEMENT) CY     132.000 1,100.00000 1
420 2102 CL A CONC (MEDIAN) CY     143.000 800.00000 1
420 2115 CL F CONC (COLUMN) (MASS PLACEMENT) CY     716.000 800.00000 1
420 2120 CL C CONC (BUS STOP) CY     277.000 450.00000 1
420 2124 CL S CONC (SLAB) SF     5,600.000 35.00000 1
420 2221 CL S CONC (JUNCTION BOX) CY     30.000 1,400.00000 1
420 2242 CL A CONC (CHANNEL LINING) CY     20.000 450.00000 1
422 2001 REINF CONC SLAB SF 19,680.000 14.00000 405,104.000 13.96871 13
423 2001 RETAINING WALL (MSE) SF 73,431.960 24.00000 185,712.160 33.38926 9
423 2003 RETAINING WALL (MSE) (ASHLAR STONE FIN) SF     46,536.000 28.00000 1
423 2005 RETAINING WALL (TEMP WALL) SF     28,031.000 9.96731 3
423 2006 RETAINING WALL (CONC BLOCK) SF     30,211.000 28.00444 3
423 2007 RETAINING WALL (SPREAD FOOTING) SF     1,470.000 65.00000 1
423 2009 RETAINING WALL (SOIL NAILED) (FACIA) SF     8,693.000 50.19732 2
423 2011 RETAINING WALL (DRILL SHAFT) (FACIA) SF     805.000 65.00000 1
423 2012 RETAINING WALL (CAST - IN - PLACE) SF     4,333.000 56.36118 2
423 2050 RET. WALL (SOIL NAILED) (GUNNITE FACIA) SF     946.000 65.00000 1
425 2006 PRESTR CONC BOX BEAM (4B20) LF     218.000 228.13000 1
425 2007 PRESTR CONC BOX BEAM (5B20) LF     109.000 303.25000 1
425 2012 PRESTR CONC BOX BEAM (4B40) LF     1,082.210 189.07000 1
425 2013 PRESTR CONC BOX BEAM (5B40) LF     6,050.630 187.20000 1
425 2015 PRESTR CONC SLAB BEAM (5SB12) LF     176.520 150.00000 1
425 2016 PRESTR CONC SLAB BEAM (4SB15) LF     594.000 140.00000 1
425 2017 PRESTR CONC SLAB BEAM (5SB15) LF     495.000 145.46000 2
425 2064 PRESTR CONC GIRDER (TX28) LF     4,666.400 124.77163 4
425 2065 PRESTR CONC GIRDER (TX34) LF     2,681.270 140.67519 3
425 2066 PRESTR CONC GIRDER (TX40) LF 2,445.000 110.00000 2,445.000 110.00000 1
425 2067 PRESTR CONC GIRDER (TX46) LF     657.000 164.00000 1
425 2068 PRESTR CONC GIRDER (TX54) LF     33,228.990 126.48939 6
425 2070 PRESTR CONC GIRDER (TX70) LF     2,110.000 200.00000 1
426 2001 POST - TENSIONING (GROUTED) MKF     1,036.000 100.00000 1
427 2002 CONCRETE PAINT FINISH SF     5,219.000 .25000 1
427 2003 OPAQUE SEALER FINISH SF     157,190.000 .32044 3
429 2008 CNC STR REP (VERTICAL OR OVERHEAD) SF     20.000 100.00000 1
429 2009 CNC STR REP (BRDG DECK) (PARTIAL DEPTH) SF     15.000 130.00000 1
430 2002 CL C CONC FOR EXT STR (ABUT) CY     87.500 850.68183 2
430 2009 CL C CONC FOR EXT STRU (CULV) (6'X 3') LF     15.000 650.00000 1
430 2024 CL C CONC FOR EXT STR (CULV) (5'X 4') LF     7.000 580.00000 1
430 2036 CL C CONC FOR EXT STRU (CULV) (8'X8') LF     20.000 1,000.00000 1
430 2193 CL C CONC FOR EXT STR (WINGWALL) CY     10.300 533.50000 1
432 2001 RIPRAP (CONC) (4 IN) CY 136.000 350.00000 3,200.450 374.72913 20
432 2002 RIPRAP (CONC) (5 IN) CY 380.680 384.78257 5,279.280 338.01869 32
432 2003 RIPRAP (PNEUM PLAC CONC) (4 IN) CY     6.000 400.00000 1
432 2012 RIPRAP (STONE TY F) (GROUT) (8 IN) CY     7.000 106.00000 1
432 2014 RIPRAP (STONE TY F) (MORTAR) (8 IN) CY     1,470.000 325.82000 1