AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - AUSTIN DISTRICT

Last Update: Friday, October 31, 2014
ITEMS 216 2001 TO 275 2032
Items Items Bid Code Range
0100 - 0193
0216 - 0275
0305 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0740 - 0760
1003 - 1122
2090 - 2277
3233 - 3283
4022 - 4668
5217 - 5926
6006 - 6834
7529 - 7529
8020 - 8973
9035 - 9035
216 2001 - 275 2032
Item No Description Units October 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
216 2001 PROOF ROLLING HR 12.000 100.00000 36.500 86.84932 4
247 2041 FL BS (CMP IN PLC) (TY A GR 1) (FNAL POS CY     899.000 64.64182 2
247 2044 FL BS (CMP IN PLC) (TY A GR 4) (FNAL POS CY     7,870.000 25.00000 1
247 2366 FL BS (CMP IN PLC) (TY A GR 5) (FNAL POS CY     291,828.700 25.83490 19
247 2392 FL BS (CMP IN PLC) (TY D GR 5) (FNAL POS) CY 2,215.000 35.00000 71,640.350 38.52507 14
247 2422 FL BS (RDWY DEL) (TY D GR 5) (FNAL POS) TON 106,303.000 13.74000 106,303.000 13.74000 1
251 2026 REWORK BS MTL (TY B) (8") (ORD COMP) SY 104,100.000 2.81000 104,100.000 2.81000 1
260 2001 LIME (HYDRATED LIME (DRY) ) TON     5,355.000 135.88297 2
260 2002 LIME (HYDRATED LIME (SLURRY) ) TON     2,259.800 161.09967 4
260 2011 LIME TRT (EXST MATL) (12") SY     14,921.000 3.50000 1
260 2012 LIME (HYD, COM OR QK) (SLRY) OR QK (DRY) TON     662.000 140.00000 1
260 2027 LIME TRT (EXST MATL) (8") SY     434,973.900 2.56965 6
260 2028 LIME TRT (EXST MATL) (8") SY     9,032.300 2.50000 1
260 2060 LIME (HYDRATED OR COMMERCIAL) (SLURRY) TON     84.000 175.00000 1
265 2007 FLY ASH (CLASS FS) TON     65.000 160.94000 1
275 2001 CEMENT TON 5,741.000 152.25000 13,392.000 137.43203 4
275 2009 CEMENT TREAT (NEW BASE) (8") SY 185,835.000 1.65000 185,835.000 1.65000 1
275 2010 CEMENT TREAT (SUBGRADE) (8") SY     105,936.000 1.15000 1
275 2011 CEMENT TREAT (EXIST MATL) (8") SY 185,835.000 1.65000 185,835.000 1.65000 1
275 2019 CEMENT TREAT (SUBGRADE) (6") SY     38,969.400 1.37000 1
275 2032 CEMENT TREAT (NEW BASE) (16") SY     140,000.000 3.20000 1