AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - AUSTIN DISTRICT

Last Update: Thursday, May 28, 2015
ITEMS 204 2003 TO 275 6032
Items Items Bid Code Range
0100 - 0193
0204 - 0275
0305 - 0354
0400 - 0496
0500 - 0560
0610 - 0690
0700 - 0752
1002 - 1122
2090 - 2308
3014 - 3283
4116 - 4668
5002 - 5991
6001 - 6834
7655 - 7655
8020 - 8973
9035 - 9054
204 2003 - 275 6032
Item No Description Units May 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
204 2003 SPRINKLING (DUST CONTROL) MG     26.000 10.00000 1
216 2001 PROOF ROLLING HR     16.000 92.50000 2
216 6001 PROOF ROLLING HR     30.000 36.66667 2
247 2044 FL BS (CMP IN PLC) (TY A GR 4) (FNAL POS CY     7,870.000 25.00000 1
247 2056 FL BS (CMP IN PLC) (TY D GR 4) (FNAL POS CY     51.000 140.00000 1
247 2366 FL BS (CMP IN PLC) (TY A GR 5) (FNAL POS CY     169,488.000 35.85274 15
247 2392 FL BS (CMP IN PLC) (TY D GR 5) (FNAL POS) CY     73,669.950 38.83179 8
247 2422 FL BS (RDWY DEL) (TY D GR 5) (FNAL POS) TON     106,303.000 13.74000 1
247 6060 FL BS (CMP IN PLC) (TY E GR 4) (FNAL POS CY     14.000 170.00000 1
247 6096 FL BS (CMP IN PLC) (TY D GR 4) TON     89.000 50.00000 1
247 6366 FL BS (CMP IN PLC) (TY A GR 5) (FNAL POS CY 318.000 80.00000 66,628.000 30.19394 6
247 6392 FL BS (CMP IN PLC) (TY D GR 5) (FNAL POS) CY     21,756.000 59.32488 4
251 2026 REWORK BS MTL (TY B) (8") (ORD COMP) SY     104,100.000 2.81000 1
260 2001 LIME (HYDRATED LIME (DRY) ) TON     4,419.000 136.07000 1
260 2002 LIME (HYDRATED LIME (SLURRY) ) TON     536.000 167.00000 1
260 2011 LIME TRT (EXST MATL) (12") SY     14,921.000 3.50000 1
260 2012 LIME (HYD, COM OR QK) (SLRY) OR QK (DRY) TON     662.000 140.00000 1
260 2027 LIME TRT (EXST MATL) (8") SY     259,305.000 3.04490 2
260 6002 LIME (HYDRATED LIME (SLURRY) ) TON 26.000 150.00000 26.000 150.00000 1
260 6006 LIME TRT (EXST MATL) (6") SY 1,563.000 5.00000 1,563.000 5.00000 1
275 2001 CEMENT TON     6,520.000 150.36821 2
275 2009 CEMENT TREAT (NEW BASE) (8") SY     185,835.000 1.65000 1
275 2011 CEMENT TREAT (EXIST MATL) (8") SY     185,835.000 1.65000 1
275 2019 CEMENT TREAT (SUBGRADE) (6") SY     38,969.400 1.37000 1
275 6001 CEMENT TON     3,383.000 165.00000 1
275 6032 CEMENT TREAT (NEW BASE) (16") SY     106,303.000 7.00000 1