AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - WICHITA FALLS DISTRICT

Last Update: Friday, February 27, 2015
ITEMS 100 2002 TO 169 2003
Items Items Bid Code Range
0100 - 0169
0216 - 0275
0310 - 0360
0400 - 0496
0500 - 0560
0618 - 0690
0760 - 0760
1122 - 1156
3267 - 3276
5369 - 5926
8880 - 8880
100 2002 - 169 2003
Item No Description Units February 28, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2002 PREPARING ROW STA 37.100 2,523.98922 47.100 2,497.66454 5
104 2001 REMOVING CONC (PAV) SY     100.000 80.00000 1
104 2009 REMOVING CONC (RIPRAP) SY 918.000 14.00000 1,580.000 15.67595 2
104 2014 REMOVING CONC (FOUNDATIONS) CY     5.300 150.00000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY     2,142.000 12.00000 1
104 2023 REMOVING CONC (CTB) LF 360.000 33.00000 360.000 33.00000 1
104 2024 REMOVING CONC (RETAINING WALLS) SY     1.000 100.00000 1
104 2028 REMOVING CONC (MISC) SY     16.000 100.00000 1
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     4,180.000 5.00000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     240.000 15.00000 1
104 2037 REMOVE CONC (RAIL) LF     37.000 15.00000 1
104 2044 REMOVING CONC (FLUME) SY 131.000 12.00000 131.000 12.00000 1
105 2002 REMOVING STAB BASE AND ASPH PAV (2") SY 8,322.000 8.00000 8,322.000 8.00000 1
105 2037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY     7,413.000 7.00890 2
110 2001 EXCAVATION (ROADWAY) CY 1,273.000 15.79576 16,236.000 11.37602 3
110 2004 EXCAVATION (ROADWAY AND CHANNEL) CY 1,551.000 14.00000 2,847.000 15.83210 5
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 1,149.000 14.00000 2,626.000 18.74562 6
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY 6,882.000 12.00000 6,882.000 12.00000 1
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 1,600.000 25.00000 1,600.000 25.00000 1
132 2007 EMBANKMENT (FINAL) (ORD COMP) (TY D) CY     11,698.000 13.59532 2
134 2001 BACKFILL (TY A) STA     407.000 159.09091 2
134 2002 BACKFILL (TY B) STA     698.000 122.06304 2
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY 31,986.000 2.50000 31,986.000 2.50000 1
161 2005 COMPOST MANUF TOPSOIL (PB) (4") SY     11,254.000 3.00000 1
162 2002 BLOCK SODDING SY 2,692.000 3.50000 13,946.000 4.71045 2
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 31,986.000 .12000 31,986.000 .12000 1
164 2003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY     37,238.000 .19327 2
164 2009 BROADCAST SEED (TEMP) (WARM) SY 22,085.000 .20310 93,139.500 .12282 5
164 2011 BROADCAST SEED (TEMP) (COOL) SY 22,085.000 .21034 103,165.500 .14268 7
164 2013 STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY SY 12,184.000 .60000 12,184.000 .60000 1
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY 1,003.000 6.00000 3,913.000 3.32418 4
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY 501.500 1.00000 1,608.500 1.51290 3
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY 501.500 1.00000 1,608.500 2.03015 3
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     106,052.000 .13767 2
168 2001 VEGETATIVE WATERING MG 693.300 37.73114 2,454.860 26.07999 12
169 2003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 366.000 6.00000 366.000 6.00000 1