AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - WICHITA FALLS DISTRICT

Last Update: Friday, August 26, 2016
ITEMS 500 6001 TO 560 6013
Items Items Bid Code Range
0100 - 0169
0216 - 0275
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0752 - 0785
3000 - 3002
6001 - 6156
500 6001 - 560 6013
Item No Description Units August 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 6001 MOBILIZATION LS 1.000 200,000.00000 22.000 182,940.77273 22
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 11.000 6,400.00000 150.000 6,376.36027 22
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 129.000 60.00000 250.000 45.48000 2
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF     2,250.000 27.60889 4
506 6011 ROCK FILTER DAMS (REMOVE) LF 129.000 20.00000 2,500.000 8.56400 6
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 416.000 30.00000 416.000 30.00000 1
506 6024 CONSTRUCTION EXITS (REMOVE) SY 416.000 10.00000 416.000 10.00000 1
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 398.000 4.00000 16,005.000 3.02229 9
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 398.000 1.00000 16,005.000 1.21575 9
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF     4,650.000 4.17032 4
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF     691.000 8.43886 2
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 1,938.000 6.00000 2,988.000 7.40562 2
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 421.000 3.00000 6,812.000 1.70838 8
512 6001 PORT CTB (FUR & INST) (SGL SLOPE) (TY 1) LF     1,440.000 32.95833 2
512 6005 PORT CTB (FUR & INST) (F - SHAPE) (TY 1) LF 2,730.000 60.00000 2,730.000 60.00000 1
512 6009 PORT CTB (FUR & INST) (LOW PROF) (TY 1) LF     80.000 91.00000 1
512 6010 PORT CTB (FUR & INST) (LOW PROF) (TY 2) LF     40.000 105.00000 1
512 6025 PORT CTB (MOVE) (SGL SLP) (TY 1) LF     9,840.000 4.88415 2
512 6041 PORT CTB (STKPL) (F - SHAPE) (TY 1) LF 2,730.000 15.00000 2,730.000 15.00000 1
512 6049 PORT CTB (REMOVE) (SGL SLP) (TY 1) LF     1,440.000 9.00000 2
512 6053 PORT CTB (REMOVE) (F - SHAPE) (TY 1) LF     10.000 6.50000 1
512 6057 PORT CTB (REMOVE) (LOW PROF) (TY 1) LF     80.000 21.50000 1
512 6058 PORT CTB (REMOVE) (LOW PROF) (TY 2) LF     40.000 21.50000 1
514 6001 PERM CTB (SGL SLOPE) (TY 1) (42 ) LF 200.000 100.00000 200.000 100.00000 1
514 6009 PERM CTB (SGL SLOPE) (TY 1) (54 ) LF 200.000 100.00000 200.000 100.00000 1
514 6013 PERM CTB (F - SHAPE) (TY 1) LF     10.000 48.00000 1
529 6002 CONC CURB (TY II) LF     11,589.000 2.50000 1
529 6008 CONC CURB & GUTTER (TY II) LF 82.000 30.00000 5,721.000 38.78098 3
530 6003 INTERSECTIONS (SURF TREAT) SY     712.000 2.50000 1
530 6004 DRIVEWAYS (CONC) SY     2,151.000 62.70572 3
530 6005 DRIVEWAYS (ACP) SY     2,360.000 38.28814 4
530 6008 TURNOUTS (ACP) SY     528.000 21.00000 1
530 6016 DRIVEWAYS (BASE) SY     4,097.000 19.54357 3
531 6001 CONC SIDEWALKS (4") SY     2,038.000 58.15015 2
531 6004 CURB RAMPS (TY 1) EA     11.000 1,854.54545 2
531 6005 CURB RAMPS (TY 2) EA     7.000 2,442.85714 2
531 6010 CURB RAMPS (TY 7) EA     6.000 2,000.00000 1
531 6015 CURB RAMPS (TY 20) EA     4.000 1,800.00000 1
531 6016 CURB RAMPS (TY 21) EA     6.000 2,150.00000 2
533 6001 RUMBLE STRIPS (SHOULDER) LF     505,820.000 .17841 5
533 6002 RUMBLE STRIPS (CENTERLINE) LF     590,179.000 .21379 4
536 6002 CONC MEDIAN SY     1,308.000 64.00000 1
540 6001 MTL W - BEAM GD FEN (TIM POST) LF 1,050.000 22.00000 7,642.500 19.71197 7
540 6005 TERMINAL ANCHOR SECTION EA     1.000 1,300.00000 1
540 6006 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 8.000 1,800.00000 53.000 1,613.37736 4
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 2.000 1,400.00000 46.000 1,168.84783 6
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF     125.000 31.25000 1
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA     8.000 1,000.00000 1
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,518.750 4.00000 8,283.750 3.06483 6
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 7.000 300.00000 24.000 233.00000 4
542 6004 RM MTL BM GD FENCE TRANS (THRIE - BEAM) EA 8.000 300.00000 11.000 308.18182 2
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 9.000 2,600.00000 52.000 2,470.19231 6
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 7.000 300.00000 35.000 286.45714 5
544 6004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA     6.000 1,950.00000 1
545 6001 CRASH CUSH ATTEN (INSTL) EA     1.000 11,800.00000 1
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA     16.000 3,145.31250 2
545 6004 CRASH CUSH ATTEN (STKPL) EA 4.000 12,000.00000 4.000 12,000.00000 1
545 6005 CRASH CUSH ATTEN (REMOVE) EA     2.000 1,287.50000 2
545 6019 CRASH CUSH ATTEN (INSTL) (S) (N) (TL3) EA 4.000 3,500.00000 4.000 3,500.00000 1
545 6024 CRASH CUSHION ATTEN (INSTALL) (TRACC) EA     1.000 16,500.00000 1
552 6003 WIRE FENCE (TY C) LF     380.000 10.00000 1
560 6004 MAILBOX INSTALL - S (TWG - POST) TY 2 EA     20.000 210.00000 1
560 6005 MAILBOX INSTALL - D (TWG - POST) TY 2 EA     2.000 230.00000 1
560 6006 MAILBOX INSTALL - M (TWG - POST) TY 2 EA     2.000 420.00000 1
560 6009 MAILBOX INSTALL - S (RR - POST) TY 4 EA     11.000 210.00000 1
560 6010 MAILBOX INSTALL - D (RR - POST) TY 4 EA     1.000 250.00000 1
560 6013 MAILBOX INSTALL - M (TWW - POST) TY 4 EA     2.000 595.00000 1