AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - WICHITA FALLS DISTRICT

Last Update: Friday, March 27, 2015
ITEMS 216 2001 TO 275 2010
Items Items Bid Code Range
0100 - 0169
0216 - 0275
0310 - 0360
0400 - 0496
0500 - 0560
0618 - 0690
0760 - 0760
1122 - 1156
3267 - 3276
5369 - 5926
8880 - 8880
216 2001 - 275 2010
Item No Description Units March 31, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
216 2001 PROOF ROLLING HR 200.000 110.00000 203.000 109.26108 2
247 2064 FL BS (CMP IN PLC) (TY A GR 4) (6") SY 518.000 29.00000 7,675.000 13.14736 3
247 2066 FL BS (CMP IN PLC) (TY B GR 2) (6") SY     2,293.000 14.00000 1
247 2201 FL BS (CMP IN PLC) (TY A GR 4) (8") SY 99.000 38.00000 99.000 38.00000 1
251 2001 REWORK BS MTL (TY A) (6") (ORD COMP) STA 1.000 15,930.00000 12.600 2,369.04762 2
260 2001 LIME (HYDRATED LIME (DRY) ) TON     123.000 175.00000 1
260 2012 LIME (HYD, COM OR QK) (SLRY) OR QK (DRY) TON 3,401.000 152.00000 3,401.000 152.00000 1
260 2027 LIME TRT (EXST MATL) (8") SY 164,315.000 1.50000 177,062.000 1.67998 2
260 2033 LIME (HYD OR COM) (SLURRY) OR QK (DRY) TON     288.000 155.00000 1
260 2073 LIME TRT (SUBGRADE) (8") SY     8,964.000 15.00000 1
275 2001 CEMENT TON     549.000 170.73224 2
275 2010 CEMENT TREAT (SUBGRADE) (8") SY     50,719.000 2.96904 2