AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - WICHITA FALLS DISTRICT

Last Update: Friday, February 27, 2015
ITEMS 310 2001 TO 360 2003
Items Items Bid Code Range
0100 - 0169
0216 - 0275
0310 - 0360
0400 - 0496
0500 - 0560
0618 - 0690
0760 - 0760
1122 - 1156
3267 - 3276
5369 - 5926
8880 - 8880
310 2001 - 360 2003
Item No Description Units February 28, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
310 2001 PRIME COAT (MC - 30) GAL 3,370.000 8.00742 3,370.000 8.00742 2
314 2010 EMULS ASPH (EROSN CONT) (SS - 1) GAL     8,905.000 3.05273 2
316 2225 AGGR (TY - PB GR - 5 SAC - B) CY     7,176.000 63.61000 1
316 2706 ASPH (TIER II) GAL     1,091,439.000 2.92000 1
316 2718 AGGR (TIER II) CY     19,711.000 61.80000 1
351 2002 FLEXIBLE PAVEMENT STRUCTURE REPAIR (6") SY     3,772.000 60.00000 1
351 2004 FLEXIBLE PAVEMENT STRUCTURE REPAIR (8") SY     6,376.000 39.86261 2
351 2026 FLEX PAVEMENT STRUCTURE REPAIR (5" - 10" SY     200.000 80.00000 1
351 2028 FLEX PAVE STRUCTURE REPAIR (8" - 10") SY     1,075.000 76.62791 2
354 2002 PLAN & TEXT ASPH CONC PAV (0" TO 2") SY     275.000 22.00000 1
354 2021 PLANE ASPH CONC PAV (0" TO 2") SY     70,778.000 1.62730 4
354 2023 PLANE ASPH CONC PAV (0" TO 4") SY     1,493.000 25.00000 1
360 2003 CONC PVMT (CONT REINF - CRCP) (10") SY     100.000 300.00000 1