Detail Letting Schedule for Hidalgo County (FY 2013)

Last Update: Thursday, November 14, 2013
Hidalgo County (FY 2013)

CCSJ: 0039-17-163

District: Pharr Let Date: OCT 2012
Highway: US 83 Let Status: Actual
Project ID: NH 2013(110) CSJ: 0039-17-163
Description: OVERLAY EB & WB MAIN LANES Handling
Code:
 
Limits From: FM 494 Fund Cat: 1
Limits To: BUS 83/INSPIRATION RD Estimate: $1,681,989
Length: 4.2 Miles Actual: $1,766,031
 
Back...

Totals for 0039-17-163
Length: 4.2 Miles
Estimate: $1,681,989
Actual: $1,766,031

CCSJ: 0039-17-176

District: Pharr Let Date: JUL 2013
Highway: US 83 Let Status: Actual
Project ID: STP 2013(948)MM CSJ: 0039-17-176
Description: INTERCHANGE IMPROVEMENTS Handling
Code:
 
Limits From: 0.4 MI W OF INSPIRATION RD Fund Cat: 11
Limits To: 0.5 MI E OF INSPIRATION RD Estimate: $28,731,337
Length: 1.0 Miles Actual: $35,990,314
 
Back...

Totals for 0039-17-176
Length: 1.0 Miles
Estimate: $28,731,337
Actual: $35,990,314

CCSJ: 0669-01-043

District: Pharr Let Date: JUN 2013
Highway: FM 681 Let Status: Actual
Project ID: STP 2013(039)MM CSJ: 0669-01-043
Description: WIDEN TO 4 LANE DIVIDED URBAN Handling
Code:
 
Limits From: FM 681 (N) @ FM 2221 Fund Cat: 7
Limits To: SH 107 Estimate: $12,382,296
Length: 1.8 Miles Actual: $12,345,194
 
District: Pharr Let Date: JUN 2013
Highway: FM 2221 Let Status: Actual
Project ID: STP 2013(040)MM CSJ: 0862-01-037
Description: WIDEN TO 4 LANE DIVIDED Handling
Code:
 
Limits From: 0.25 MI W OF SH 364 (LA HOMA) Fund Cat: 7
Limits To: .25 MI W OF MOOREFIELD RD Estimate: $2,554,544
Length: 0.6 Miles Actual: $2,333,145
 
District: Pharr Let Date: JUN 2013
Highway: FM 2221 Let Status: Actual
Project ID: STP 2013(039)MM CSJ: 0862-01-047
Description: WIDEN TO 4 LANE DIVIDED URBAN Handling
Code:
 
Limits From: 0.25 MI W OF MOOREFIELD RD Fund Cat: 7
Limits To: FM 681 Estimate: $2,304,773
Length: 0.3 Miles Actual: $2,162,778
 
Back...

Totals for 0669-01-043
Length: 2.7 Miles
Estimate: $17,241,613
Actual: $16,841,117

CCSJ: 0698-03-084

District: Pharr Let Date: SEP 2012
Highway: FM 88 Let Status: Actual
Project ID: STP 2012(699)MM CSJ: 0698-03-084
Description: WIDEN TO 4 LANE DIVIDED Handling
Code:
 
Limits From: SH 107, SOUTH Fund Cat: 7
Limits To: 0.25 MI N OF MILE 16 N Estimate: $2,203,783
Length: 0.2 Miles Actual: $2,681,777
 
District: Pharr Let Date: SEP 2012
Highway: FM 88 Let Status: Actual
Project ID: RW 0698-3-86 CSJ: 0698-03-086
Description: ROW ACQUISITION Handling
Code:
 
Limits From: SH 107, SOUTH Fund Cat: ROW
Limits To: 0.25 MI. N. OF MIE 16 N Estimate:  
Length: 0.2 Miles Actual: $467,214
 
Back...

Totals for 0698-03-084
Length: 0.4 Miles
Estimate: $2,203,783
Actual: $3,148,991

CCSJ: 0862-01-049

District: Pharr Let Date: OCT 2012
Highway: US 83 Let Status: Actual
Project ID: NH 2013(111) CSJ: 0039-02-062
Description: SEAL COAT Handling
Code:
 
Limits From: HIDALGO/ STARR C.L. Fund Cat: 1
Limits To: FM 2221 Estimate: $533,440
Length: 6.1 Miles Actual: $460,819
 
District: Pharr Let Date: OCT 2012
Highway: SH 359 Let Status: Actual
Project ID: STP 2013(112) CSJ: 0086-07-033
Description: SEAL COAT Handling
Code:
 
Limits From: SH 359 & SH 16 (SOUTH INT) Fund Cat: 1
Limits To: DUVAL/ JIM HOGG CL Estimate: $150,076
Length: 4.7 Miles Actual: $133,888
 
District: Pharr Let Date: OCT 2012
Highway: SH 16 Let Status: Actual
Project ID: STP 2013(112) CSJ: 0086-07-034
Description: SEAL COAT Handling
Code:
 
Limits From: SH 359 & SH 16 (SOUTH INT) Fund Cat: 1
Limits To: SH 359 & SH 16_(NORTH INT) Estimate: $29,246
Length: 0.4 Miles Actual: $25,026
 
District: Pharr Let Date: OCT 2012
Highway: FM 649 Let Status: Actual
Project ID: STP 2013(112) CSJ: 0329-01-020
Description: SEAL COAT Handling
Code:
 
Limits From: 2.362 MI S OF FM 2687 Fund Cat: 1
Limits To: NORTH 1.71 MI Estimate: $210,544
Length: 1.7 Miles Actual: $175,674
 
District: Pharr Let Date: OCT 2012
Highway: FM 649 Let Status: Actual
Project ID: STP 2013(112) CSJ: 0329-01-021
Description: SEAL COAT Handling
Code:
 
Limits From: 5.90 MI S OF SH 16 Fund Cat: 1
Limits To: FM 2687 Estimate: $103,892
Length: 6.0 Miles Actual: $87,479
 
District: Pharr Let Date: OCT 2012
Highway: FM 649 Let Status: Actual
Project ID: STP 2013(112) CSJ: 0329-01-022
Description: SEAL COAT Handling
Code:
 
Limits From: 4.17 MI S OF SH 16 Fund Cat: 1
Limits To: N TO SH 16 Estimate: $106,909
Length: 4.2 Miles Actual: $89,548
 
District: Pharr Let Date: OCT 2012
Highway: FM 649 Let Status: Actual
Project ID: STP 2013(112) CSJ: 0329-02-031
Description: SEAL COAT Handling
Code:
 
Limits From: US 83 Fund Cat: 1
Limits To: 4.858 MI. N OF US 83 Estimate: $183,633
Length: 4.4 Miles Actual: $162,544
 
District: Pharr Let Date: OCT 2012
Highway: FM 649 Let Status: Actual
Project ID: STP 2013(112) CSJ: 0329-02-032
Description: SEAL COAT Handling
Code:
 
Limits From: STARR/ JIM HOGG CL Fund Cat: 1
Limits To: FM 3167 Estimate: $377,421
Length: 15.3 Miles Actual: $316,016
 
District: Pharr Let Date: OCT 2012
Highway: SH 16 Let Status: Actual
Project ID: STP 2013(112) CSJ: 0482-01-032
Description: SEAL COAT Handling
Code:
 
Limits From: SH 285 Fund Cat: 1
Limits To: SH 359 & SH 16 (SOUTH INT) Estimate: $26,156
Length: 0.3 Miles Actual: $23,161
 
District: Pharr Let Date: OCT 2012
Highway: SH 16 Let Status: Actual
Project ID: STP 2013(112) CSJ: 0517-10-018
Description: SEAL COAT Handling
Code:
 
Limits From: SH 359 & SH 16 (NORTH INTERSECTION) Fund Cat: 1
Limits To: DUVAL/JIM HOGG CL Estimate: $156,676
Length: 3.1 Miles Actual: $137,272
 
District: Pharr Let Date: OCT 2012
Highway: FM 681 Let Status: Actual
Project ID: STP 2013(112) CSJ: 0669-01-054
Description: SEAL COAT Handling
Code:
 
Limits From: 1.5 MI N OF FM 2058 Fund Cat: 1
Limits To: FM 1925 Estimate: $332,985
Length: 7.9 Miles Actual: $298,611
 
District: Pharr Let Date: OCT 2012
Highway: FM 490 Let Status: Actual
Project ID: STP 2013(112) CSJ: 0860-01-017
Description: SEAL COAT Handling
Code:
 
Limits From: HIDALGO/ WILLACY CL Fund Cat: 1
Limits To: FM 493 Estimate: $77,474
Length: 2.0 Miles Actual: $69,212
 
District: Pharr Let Date: OCT 2012
Highway: FM 492 Let Status: Actual
Project ID: STP 2013(112) CSJ: 0862-01-049
Description: SEAL COAT Handling
Code:
 
Limits From: 1 MILE LINE (NORTH) Fund Cat: 1
Limits To: 0.1 MI S OF FM 1924 Estimate: $368,749
Length: 2.4 Miles Actual: $174,933
 
District: Pharr Let Date: OCT 2012
Highway: FM 492 Let Status: Actual
Project ID: STP 2013(112) CSJ: 0862-01-050
Description: SEAL COAT Handling
Code:
 
Limits From: 0.1 MI N OF FM 1924 Fund Cat: 1
Limits To: FM 2221 Estimate: $137,677
Length: 4.0 Miles Actual: $119,868
 
District: Pharr Let Date: OCT 2012
Highway: FM 755 Let Status: Actual
Project ID: STP 2013(112) CSJ: 1103-04-033
Description: SEAL COAT Handling
Code:
 
Limits From: 0.25 MI N OF LUIS MARTINEZ LANE Fund Cat: 1
Limits To: FM 490 Estimate: $285,829
Length: 10.0 Miles Actual: $254,629
 
District: Pharr Let Date: OCT 2012
Highway: FM 755 Let Status: Actual
Project ID: STP 2013(112) CSJ: 1103-04-034
Description: SEAL COAT Handling
Code:
 
Limits From: FM 1017 (NORTH LEG) Fund Cat: 1
Limits To: FM 490 Estimate: $769,392
Length: 16.8 Miles Actual: $689,371
 
District: Pharr Let Date: OCT 2012
Highway: FM 1017 Let Status: Actual
Project ID: STP 2013(112) CSJ: 1227-01-025
Description: SEAL COAT Handling
Code:
 
Limits From: STARR/JIM HOGG CL Fund Cat: 1
Limits To: SH 285 Estimate: $1,192,259
Length: 37.5 Miles Actual: $1,065,296
 
District: Pharr Let Date: OCT 2012
Highway: FM 2360 Let Status: Actual
Project ID: STP 2013(112) CSJ: 2245-01-013
Description: SEAL COAT Handling
Code:
 
Limits From: 4.57 MI N OF US 83 Fund Cat: 1
Limits To: END OF STATE MAINTENANCE Estimate: $41,372
Length: 2.0 Miles Actual: $34,608
 
Back...

Totals for 0862-01-049
Length: 128.8 Miles
Estimate: $5,083,730
Actual: $4,317,955

CCSJ: 0864-01-065

District: Pharr Let Date: AUG 2013
Highway: FM 494 Let Status: Actual
Project ID: STP 2013(897)MM CSJ: 0864-01-065
Description: SIGNAL RETIMING & ADD LANES @ US 83 Handling
Code:
 
Limits From: SUNSET LANE Fund Cat: 1
Limits To: COLORADO ST Estimate: $589,360
Length: 1.7 Miles Actual: $787,778
 
Back...

Totals for 0864-01-065
Length: 1.7 Miles
Estimate: $589,360
Actual: $787,778

CCSJ: 0921-02-147

District: Pharr Let Date: FEB 2013
Highway: CR Let Status: Actual
Project ID: BR 2008(715) CSJ: 0921-02-147
Description: REPLACE BRIDGE & RECONST APPROACHES Handling
Code:
 
Limits From: STR#AA08-25-001 @ DRAINAGE DITCH Fund Cat: 6
Limits To: .2 MI S OF FM 1925 (MILE 2 W RD) Estimate: $349,982
Length: 0.1 Miles Actual: $363,503
 
District: Pharr Let Date: FEB 2013
Highway: CS Let Status: Actual
Project ID: BR 2010(375) CSJ: 0921-02-188
Description: REPLACE BRIDGE & RECONST APPROACHES Handling
Code:
 
Limits From: STR#L004-35-001 @ MAIN SUPPLY CANAL Fund Cat: 6
Limits To: 17TH ST, .45 MI W. OF FM 491 Estimate: $593,290
Length: 0.1 Miles Actual: $628,079
 
Back...

Totals for 0921-02-147
Length: 0.2 Miles
Estimate: $943,272
Actual: $991,582

CCSJ: 0921-02-170

District: Pharr Let Date: APR 2013
Highway: CS Let Status: Actual
Project ID: HP 2008(128) CSJ: 0921-02-170
Description: RECONSTRUCT & WIDEN TO 2 LN RDWY WITH SHOULDERS Handling
Code:
 
Limits From: MILE 2 WEST, FROM MILE 12 NORTH Fund Cat: 3
Limits To: .44 MI NORTH OF US 83 Estimate: $5,669,127
Length: 4.8 Miles Actual: $4,729,717
 
District: Pharr Let Date: APR 2013
Highway: CS Let Status: Actual
Project ID: HP 2008(128) CSJ: 0921-02-307
Description: RECONSTRUCT & WIDEN TO 2 LN RDWY WITH SHOULDERS Handling
Code:
 
Limits From: ON MILE 2 NORTH,.44 MI N OF US 83 Fund Cat: 7
Limits To: US 83 Estimate: $953,555
Length: 0.4 Miles Actual: $744,320
 
Back...

Totals for 0921-02-170
Length: 5.2 Miles
Estimate: $6,622,682
Actual: $5,474,037

CCSJ: 0921-02-258

District: Pharr Let Date: SEP 2012
Highway: CS Let Status: Actual
Project ID: STP 1102(186)SRS CSJ: 0921-02-258
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, & INSTALL BIKE Handling
Code:
 
Limits From: CITY OF EDINBURG, EISENHOWER ELEM Fund Cat: 8
Limits To: & MEMORIAL MIDDLE SCHOOL Estimate: $392,662
Length: 1.4 Miles Actual: $370,568
 
District: Pharr Let Date: SEP 2012
Highway: CS Let Status: Actual
Project ID: STP 1102(186)SRS CSJ: 0921-02-259
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, AND INSTALL BIKE Handling
Code:
 
Limits From: CITY OF EDINBURG, VILLAREAL ELEM & Fund Cat: 8
Limits To: MONTE CRISTO ELEMENTARY Estimate: $421,724
Length: 1.2 Miles Actual: $350,243
 
District: Pharr Let Date: SEP 2012
Highway: CS Let Status: Actual
Project ID: STP 1102(186)SRS CSJ: 0921-02-261
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 8
Limits To: DE ZAVALA ELEMENTARY Estimate: $396,651
Length: 2.0 Miles Actual: $338,263
 
District: Pharr Let Date: SEP 2012
Highway: CS Let Status: Actual
Project ID: STP 1102(186)SRS CSJ: 0921-02-262
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 8
Limits To: TRUMAN ELEMENTARY Estimate: $432,980
Length: 2.4 Miles Actual: $358,289
 
District: Pharr Let Date: SEP 2012
Highway: CS Let Status: Actual
Project ID: STP 1102(186)SRS CSJ: 0921-02-264
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 8
Limits To: GUERRA ELEMENTARY Estimate: $296,811
Length: 1.8 Miles Actual: $253,790
 
District: Pharr Let Date: SEP 2012
Highway: CS Let Status: Actual
Project ID: STP 1102(186)SRS CSJ: 0921-02-267
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: B.L. GARZA ELEMENTARY Estimate: $398,037
Length: 1.2 Miles Actual: $318,924
 
District: Pharr Let Date: SEP 2012
Highway: CS Let Status: Actual
Project ID: STP 1102(186)SRS CSJ: 0921-02-272
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 8
Limits To: AUSTIN ELEMENTARY Estimate: $399,849
Length: 0.7 Miles Actual: $347,977
 
District: Pharr Let Date: SEP 2012
Highway: CS Let Status: Actual
Project ID: STP 1102(186)SRS CSJ: 0921-02-274
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: LINCOLN ELEMENTARY Estimate: $412,338
Length: 2.5 Miles Actual: $329,702
 
Back...

Totals for 0921-02-258
Length: 13.2 Miles
Estimate: $3,151,052
Actual: $2,667,756

CCSJ: 0921-02-266

District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-260
Description: CONSTRUCT SIDEWALKS Handling
Code:
 
Limits From: CITY OF MCALLEN, Fund Cat: 3
Limits To: CAVAZOS ELEMENTARY Estimate: $206,492
Length: 0.1 Miles Actual: $189,865
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-263
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: HIDALGO COUNTY, Fund Cat: 3
Limits To: CARMEN AVILA ELEMENTARY Estimate: $196,523
Length: 0.1 Miles Actual: $172,121
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-265
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: HIDALGO COUNTY, SAN CARLOS ELEM & Fund Cat: 3
Limits To: J.F. KENNEDY ELEMENTARY Estimate: $366,412
Length: 0.1 Miles Actual: $330,139
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-266
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: CANO-GONZALEZ ELEMENTARY Estimate: $418,468
Length: 0.1 Miles Actual: $273,290
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-268
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: TREVINO ELEMENTARY Estimate: $406,970
Length: 0.1 Miles Actual: $377,393
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-269
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: HIDALGO COUNTY, Fund Cat: 3
Limits To: ESPARZA & BETTS ELEMENTARY Estimate: $260,620
Length: 0.1 Miles Actual: $242,742
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-270
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: HARWELL MIDDLE SCHOOL Estimate: $353,217
Length: 0.1 Miles Actual: $309,013
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-271
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: L.B. JOHNSON ELEMENTARY Estimate: $343,335
Length: 0.1 Miles Actual: $308,940
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-273
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: DE LA VINA ELEMENTARY Estimate: $175,702
Length: 0.1 Miles Actual: $154,724
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-275
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: ROBERT E. LEE ELEMENTARY Estimate: $387,517
Length: 0.1 Miles Actual: $311,396
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-276
Description: CONSTRUCT SIDEWALKS, REDESIGN SIDEWALKS, INTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: JEFFERSON ELEMENTARY Estimate: $360,584
Length: 0.1 Miles Actual: $325,147
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-277
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: CANTERBURY ELEMENTARY Estimate: $207,871
Length: 0.1 Miles Actual: $191,155
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-278
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: TRAVIS ELEMENTARY Estimate: $239,180
Length: 0.1 Miles Actual: $212,406
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-279
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: JOSE DE ESCANDON ELEMENTARY Estimate: $289,987
Length: 0.1 Miles Actual: $286,526
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-280
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INSTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: SOUTH MIDDLE SCHOOL Estimate: $272,437
Length: 0.1 Miles Actual: $257,218
 
District: Pharr Let Date: MAY 2013
Highway: CS Let Status: Actual
Project ID: STP 1102(187)SRS CSJ: 0921-02-281
Description: CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, INTALL BIKE RACKS Handling
Code:
 
Limits From: CITY OF EDINBURG, Fund Cat: 3
Limits To: FREDDY GONZALEZ ELEMEMTARY Estimate: $349,674
Length: 0.1 Miles Actual: $309,126
 
Back...

Totals for 0921-02-266
Length: 1.6 Miles
Estimate: $4,834,989
Actual: $4,251,201

CCSJ: 0921-02-282

District: Pharr Let Date: MAY 2013
Highway: VA Let Status: Actual
Project ID: STP 2011(242)TE CSJ: 0921-02-282
Description: PEDESTRIN & BICYCLE ACCESS PROJECT - PHASE II Handling
Code:
 
Limits From: CITY OF HIDALGO, EAST Fund Cat: 3
Limits To: TO SANTA ANNA NWR TO MCALLEN Estimate: $1,450,325
Length: 9.8 Miles Actual: $1,277,719
 
Back...

Totals for 0921-02-282
Length: 9.8 Miles
Estimate: $1,450,325
Actual: $1,277,719

CCSJ: 1802-02-009

District: Pharr Let Date: JUL 2013
Highway: FM 3461 Let Status: Actual
Project ID: STP 2013(857)MM CSJ: 1802-02-009
Description: CONSTRUCT 4 LANE DIVIDED URBAN Handling
Code:
 
Limits From: I RD EAST Fund Cat: 11
Limits To: FM 1426 Estimate: $3,367,217
Length: 0.8 Miles Actual: $3,077,778
 
Back...

Totals for 1802-02-009
Length: 0.8 Miles
Estimate: $3,367,217
Actual: $3,077,778


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment