Letting Schedule for September, 2012 (FY 2013)
September, 2012 (FY 2013) | (see Links) |
SEP 2012 | OCT 2012 | NOV 2012 | DEC 2012 | JAN 2013 | FEB 2013 | MAR 2013 | APR 2013 | MAY 2013 | JUN 2013 | JUL 2013 | AUG 2013 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0205-07-043 | Anderson/ Tyler |
US 79 | Actual | $41,986,850 | 3 | WIDEN TO 4 LANE DIVIDED RURAL (DEPRESSED MEDIAN) |
0913-20-079 | Austin/ Yoakum |
CR | Actual | $196,644 | 6 | REPLACE BRIDGE AND APPROACHES |
0807-05-019 | Bastrop/ Austin |
FM 535 | Actual | $4,348,947 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0015-14-091 | Bell/ Waco |
IH 35 | Actual | 241,296,936 | 11 | RECONSTRUCT AND WIDEN FROM FOUR TO EIGHT LANES |
1308-01-029 | Bell/ Waco |
FM 1123 | Actual | $4,938,247 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0017-02-075 | Bexar/ San Antonio |
IH 35 | Actual | $6,192,763 | 6 | REPLACE BRIDGE AND APPROACHES |
0465-02-024 | Bexar/ San Antonio |
FM 1518 | Actual | $1,138,014 | 1 | REPLACE CULVERT WITH SLAB SPAN BRIDGE |
2452-01-051 | Bexar/ San Antonio |
LP 1604 | Actual | $11,250,794 | 8 | CONSTRUCT GRADE SEPARATION |
0217-02-030 | Bowie/ Atlanta |
US 71 | Actual | $353,115 | 1 | UPGRADE EXISTING TRAFFIC SIGNALS |
0327-08-084 | Cameron/ Pharr |
BU 77-X | Actual | $2,859,169 | 1 | FY 2013 SEAL COAT PROGRAM |
0872-04-026 | Cameron/ Pharr |
FM 506 | Actual | $6,647,529 | 1 | OVERLAY |
0921-06-242 | Cameron/ Pharr |
CS | Actual | $168,440 | 8 | CONSTRUCT SIDEWALKS ALONG ROUTES TO SCHOOLS |
0921-06-247 | Cameron/ Pharr |
CS | Actual | $538,299 | 3 | CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS, AND INSTALL SCHOOL |
2351-01-019 | Collin/ Dallas |
FM 2478 | Actual | $170,000 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING |
0196-03-257 | Dallas/ Dallas |
IH 35E | Actual | $402,996 | 1 | FULL DEPTH REPAIR OF SOUTHBOUND FRONTAGE ROAD |
0353-04-093 | Dallas/ Dallas |
SP 348 | Actual | $114,284 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING |
1047-03-064 | Dallas/ Dallas |
FM 1382 | Actual | $407,131 | 1 | FULL DEPTH REPAIR AND PAVEMENT MARKINGS |
0270-01-049 | Dewitt/ Yoakum |
SH 72 | Actual | $2,737,651 | 1 | ADD SHOULDERS |
0007-03-086 | Eastland/ Brownwood |
IH 20 | Actual | $1,384,989 | 8 | INSTALL MEDIAN BARRIER |
0001-01-054 | El Paso/ El Paso |
SH 20 | Actual | $3,452,324 | 1 | MILL AND INLAY |
0167-01-107 | El Paso/ El Paso |
US 54 | Actual | $619,753 | 1 | DYNAMIC MESSAGE SYSTEM BOARDS INSTALLATION PROJECT |
0924-06-377 | El Paso/ El Paso |
VA | Actual | $340,789 | 1 | HIGHWAY ADVISORY RADIO SYSTEM |
0924-06-415 | El Paso/ El Paso |
VA | Actual | $1,245,535 | 10 | CONSTUCT CURB RAMPS FOR ADA COMPLIANCE |
2121-03-142 | El Paso/ El Paso |
IH 10 | Actual | $2,227,564 | 1 | MILL AND INLAY |
3592-01-006 | El Paso/ El Paso |
SH 178 | Actual | $1,102,510 | 1 | INSTALL FIBER OPTIC CABLE, CLOSED CIRCUIT TELEVISION CAMERAS |
8056-24-001 | El Paso/ El Paso |
MH | Actual | $7,505,306 | ROW | WIDENING OF HORIZON BOULEVARD |
0166-02-041 | Freestone/ Bryan |
SH 75 | Actual | $4,959,596 | 1 | SEAL COAT CONSISTING OF A ONE COURSE SURFACE TREATMENT |
2719-01-008 | Gillespie/ Austin |
RM 2721 | Actual | $2,899,581 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0088-02-056 | Goliad/ Corpus Christi |
US 59 | Actual | $2,568,319 | 1 | REHAB ROADWAY AT INTERSECTION AND ADD CONCRETE |
0410-02-030 | Grayson/ Paris |
US 69 | Actual | $5,218,898 | 1 | REPAIR ROADWAY |
0338-01-054 | Grimes/ Bryan |
SH 105 | Actual | $6,821,959 | 11 | REHABILITATION OF EXISTING ROAD CONSISTING OF GRADING, |
0043-02-070 | Hardeman/ Childress |
US 287 | Actual | $4,756,159 | 1 | FY 2013 DISTRICT WIDE SEALCOAT |
0200-10-073 | Hardin/ Beaumont |
US 69 | Actual | $2,061,902 | 1 | OVERLAY EXISTING ROADWAY |
0028-01-095 | Harris/ Houston |
BU 90-U | Actual | $2,893,768 | 1 | BASE REPAIR & ACP OVERLAY |
0050-06-082 | Harris/ Houston |
US 290 | Actual | $7,088,544 | 5 | INTERSECTION IMPROVEMENTS |
0050-09-071 | Harris/ Houston |
US 290 | Actual | 110,414,014 | ROW | CONSTRUCT 5 MAIN LANES WITH AUXILIARY LANES & 2 OR 3 LANE |
0271-17-154 | Harris/ Houston |
IH 610 | Actual | $315,518 | 1 | SEAL RETAINING WALL JOINTS ON SB FRONTAGE ROAD |
0912-72-050 | Harris/ Houston |
CS | Actual | $1,384,264 | 6 | REHABILITATE BRIDGE AND APPROACHES |
1685-02-049 | Harris/ Houston |
FM 1960 | Actual | $546,380 | 1 | PAVEMENT MARKINGS |
0030-05-062 | Hemphill/ Amarillo |
US 83 | Actual | $4,019,599 | 1 | REHAB EXISTING RDWY |
0698-03-084 | Hidalgo/ Pharr |
FM 88 | Actual | $3,148,991 | ROW | WIDEN TO 4 LANE DIVIDED |
0921-02-258 | Hidalgo/ Pharr |
CS | Actual | $2,667,756 | 3 | CONSTRUCT SIDEWALKS, REDESIGN CROSSWALKS, & INSTALL BIKE |
0901-28-051 | Hopkins/ Paris |
CR | Actual | $746,317 | 6 | REPLACE BRIDGE AND APPROACHES |
1275-01-037 | Jasper/ Beaumont |
FM 1013 | Actual | $1,998,014 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0028-06-074 | Jefferson/ Beaumont |
US 90 | Actual | $776,636 | 1 | MILL AND OVERLAY EXISTING ROADWAY, AND REPLACE CURB |
2465-01-018 | Johnson/ Fort Worth |
FM 2280 | Actual | $828,651 | 1 | RESURFACE ROADWAY |
3414-01-010 | Johnson/ Fort Worth |
FM 3048 | Actual | $1,516,717 | 1 | CEM TRT BASE 8" IN SECTIONS, ONE CRSE SURFACE TRT; 2" TY D |
0366-06-038 | Karnes/ Corpus Christi |
SH 123 | Actual | $1,860,498 | 1 | CEMENT TREATMENT AND OVERLAY ROADWAY ON SH 123 |
2755-01-009 | Karnes/ Corpus Christi |
FM 2724 | Actual | $1,384,041 | 6 | REPLACE BRIDGE AND APPROACHES |
0098-04-032 | Knox/ Childress |
SH 6 | Actual | $1,911,113 | 6 | REPLACE BRIDGE AND APPROACHES |
1032-01-032 | Lampasas/ Brownwood |
FM 580 | Actual | $2,683,161 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0913-29-041 | Lavaca/ Yoakum |
CR | Actual | $242,125 | 6 | REPLACE BRIDGE AND APPROACHES |
0334-05-030 | Lee/ Austin |
FM 141 | Actual | $2,191,993 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0473-02-035 | Lee/ Austin |
SH 21 | Actual | $2,789,600 | 1 | WIDEN BRIDGE & MODIFY APPROACHES |
0643-03-022 | Limestone/ Waco |
FM 39 | Actual | $5,753,684 | 1 | FARM - TO - MARKET PAVEMENT RESTORATION |
0380-07-024 | Martin/ Odessa |
SH 349 | Actual | $6,430,782 | 3 | NON - FREEWAY WIDENING |
0380-08-020 | Martin/ Odessa |
SH 349 | Actual | $15,156,095 | 11 | NON - FREEWAY WIDENING |
0258-09-137 | McLennan/ Waco |
SH 6 | Actual | $3,644,677 | 1 | REPLACE BRIDGE AND APPROACHES |
2060-01-035 | McLennan/ Waco |
FM 2113 | Actual | $2,942,751 | 1 | WIDEN PAVEMENT TO ADD SHOULDERS, PROVIDE SAFETY UPGRADES AND |
0848-01-038 | Medina/ San Antonio |
FM 462 | Actual | $3,295,349 | 1 | REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERS |
0917-12-068 | Milam/ Bryan |
CR | Actual | $461,057 | 6 | REPLACE BRIDGE AND APPROACHES |
0926-06-015 | Nacogdoches/ Lufkin |
FM 138 | Actual | $2,195,088 | 1 | RECONSTRUCT & WIDEN EXISTING PAVEMENT |
2263-02-091 | Nueces/ Corpus Christi |
SH 361 | Actual | $508,752 | 10 | BULKHEAD REPAIRS |
0063-04-058 | Panola/ Atlanta |
US 59 | Actual | $1,548,150 | 1 | OVERLAY EXISTING 4 - LANE DIVIDED HIGHWAY |
3160-01-020 | Polk/ Lufkin |
FM 3126 | Actual | $2,155,016 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0904-00-151 | Potter/ Amarillo |
VA | Actual | $323,778 | 11 | CRACK SEAL |
0049-06-075 | Robertson/ Bryan |
SH 6 | Actual | $445,995 | 10 | MISCELLANEOUS CONSTRUCTION CONSISTING OF CONSTRUCTING CURB |
0540-01-044 | Robertson/ Bryan |
FM 46 | Actual | $3,105,423 | 8 | SAFETY WORK CONSISTING OF SUBGRADE WIDENING, FLEXIBLE BASE, |
0917-18-073 | Robertson/ Bryan |
CR | Actual | $596,512 | 6 | REPLACEMENT OF EXISTING BRIDGE FACILITY CONSISTING OF |
0064-15-006 | Sabine/ Lufkin |
FM 201 | Actual | $620,822 | 1 | RESTORATION OF EXISTING PAVEMENT (IN SECTIONS) |
0177-13-006 | San Jacinto/ Lufkin |
LP 424 | Actual | $109,332 | 1 | INSTALLATION OF TRAFFIC SIGNAL |
1879-01-022 | Shelby/ Lufkin |
FM 2026 | Actual | $4,032,482 | 1 | RECONSTRUCT AND WIDEN PAVEMENT TO 28 FT |
0910-00-092 | Smith/ Tyler |
VA | Actual | $119,752 | 1 | THERMOPLASTIC PAVEMENT MARKINGS |
0386-01-026 | Somervell/ Fort Worth |
SH 144 | Actual | $665,325 | 1 | BASE REPAIR AND HMAC OVERLAY |
0714-03-022 | Stephens/ Brownwood |
FM 717 | Actual | $2,554,818 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0014-16-255 | Tarrant/ Fort Worth |
IH 35W | Actual | 123,285,893 | 1 | RECONSTRUCT ROADWAY AND ADD 4 MANAGED (TOLL) LANES |
1068-01-201 | Tarrant/ Fort Worth |
IH 30 | Actual | $1,479,637 | 1 | MILL, REPAIR CONCRETE FAILURES, OVERLAY |
2374-05-077 | Tarrant/ Fort Worth |
IH 20 | Actual | $5,345,717 | 1 | MILL AND OVERLAY |
0907-00-077 | Tom Green/ San Angelo |
VA | Actual | $1,368,778 | 11 | INSTALL & UPGRADE TRAFFIC SIGNAL & ILLUMINATION ASSEMBLIES |
0914-00-291 | Travis/ Austin |
VA | Actual | $357,643 | 1 | FY 2012 SIGNING |
0914-00-314 | Travis/ Austin |
VA | Actual | $2,958,819 | 1 | FY 2013 NON - SITE SPECIFIC ITS MAINTENANCE CONTRACT |
0475-08-011 | Trinity/ Lufkin |
FM 230 | Actual | $1,485,179 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0756-02-027 | Walker/ Bryan |
FM 980 | Actual | $4,394,843 | 8 | SAFETY WORK CONSISTING OF SUBGRADE WIDENING, FLEXIBLE BASE, |
0114-10-091 | Washington/ Bryan |
US 290 | Actual | $5,483,940 | 1 | REHABILITATE EXISTING ROAD CONSISTING OF FLEXIBLE PAVEMENT |
0709-02-047 | Wharton/ Yoakum |
FM 102 | Actual | $2,875,006 | 1 | ADD SHOULDERS |
0440-02-010 | Williamson/ Austin |
SH 195 | Actual | $18,778,888 | 1 | WIDEN TO FOUR LANE DIVIDED HIGHWAY |
|