Monthly State Let Construction Report For Tyler District As Of Sep 13, 2021 Page 2 Of 3

Last Update: Wednesday, September 15, 2021
FTP Icon
page 1 | page 2 | page 3

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyRUSK
HighwaySL 43
FromSH 43, S
ToSH 149 IN TATUM
CSJ0207-06-003
Proj IDC 207-6-3
Work TypeTRAFFIC CONTROL DEVICES
 
62371.310.000.0
CountySMITH
HighwayVA
FromVARIOUS LOCATIONS IN
ToTHE TYLER DISTRICT
CSJ0910-00-115
Proj IDF 2022(095)
Work TypeTRAFFIC CONTROL DEVICES
 
1.0002431518.410.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days66
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TOTAL HIGHWAY MAINTENANCE, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0207-06-003
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #09213012
Totals2493889.720.000.000.0

CountySMITH
HighwaySH 64
FromPRAIRIE CREEK
To.
CSJ0245-05-051
Proj IDBR 2021(512)
Work TypeBRIDGE MAINTENANCE
 
332397.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-22-21
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days55
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0245-05-051
DUSTIN ALLEN, INC. (9.24)
AREA WIDE PROTECTIVE, INC. (0.66)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.41)
Contract #05213231
Totals332397.000.000.000.0

CountySMITH
HighwaySH 135
From1.657 MI SW OF SH 64, IN ARP, SW
To0.679 MI NE OF FM 15, IN TROUP.
CSJ0378-03-017
Proj IDSTP 1902(170)
Work TypeSUPER-2 HIGHWAY
 
6.9898695777.0011308835.2899.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-18-19
Work Began02-18-20
Work Completed
Time Computed00-00-00
Contract Working Days315
Addl Days Granted29
Working Days Charged215
Percent Time Used62
Contractor(s)
DREWERY CONSTRUCTION COMPANY, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0378-03-017
A R BROTHERS CONSTRUCTION SERVICES, INC. (4.67)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.67)
MURRAY CONSTRUCTION (0.41)
PANOLA SIGN & BARRICADE, INC. (0.25)
SOUTHWEST ENVIRONMENT SERIVES, LLC (2.09)
STRIPING TECHNOLOGY, L.P. (1.07)
TEXOP CONSTRUCTION (0.79)
APEX HIGHWAY SERVICES, LLC (0.16)
FREDONIA CONSTRUCTION SERVICES (0.11)
WEST TEXAS ROCK RESOURCES, LLC (0.12)
Contract #08193214
Totals8695777.006517.7211308835.2899.9

CountyWOOD
HighwaySH 154
From2 MI. S OF FM 515, SE
To0.58 MI. N OF LAKE FORK RESERVOIR BRIDGE
CSJ0401-02-034
Proj IDCC 401-2-34
Work TypeWIDEN NON-FREEWAY
 
899810.96429937.3347.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-19-21
Work Began04-20-21
Work Completed
Time Computed00-00-00
Contract Working Days68
Addl Days Granted9
Working Days Charged39
Percent Time Used50
Contractor(s)
EAST TEXAS BRIDGE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0401-02-034
STRIPE-A-ZONE, INC. (2.21)
TEXAS ORGANIC ENTERPRISES, LTD (1.28)
STATEWIDE SAFETY SYSTEMS (0.60)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.44)
Contract #02213031
Totals899810.96204793.41429937.3347.7

CountyGREGG
HighwaySH 31
FromFM 3053, E
ToFM 1639
CSJ0424-02-047
Proj IDSTP 2020(708)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
62148.0041135.0066.1
CountySMITH
HighwayFM 2767
From0.239 MI E OF FM 850-CR386, E
ToFM 757
CSJ0424-07-018
Proj IDSTP 2020(708)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
9.1291247155.001046050.8583.8
CountySMITH
HighwayFM 16
FromSH 155(N) IN WINONA, E
ToUS 271
CSJ0522-05-017
Proj IDSTP 2020(708)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
0.0011065316.50923205.0586.6
CountyGREGG
HighwayFM 2204
FromUS 259 IN KILGORE, E
ToSH 322
CSJ2072-01-016
Proj IDSTP 2020(708)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
1515311.00968802.5963.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-07-20
Work Began07-10-20
Work Completed
Time Computed00-00-00
Contract Working Days257
Addl Days Granted7
Working Days Charged237
Percent Time Used89
Contractor(s)
STATELINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0424-02-047
R & G CONSTRUCTION, LLC (11.33)
J. H. ODEN CONTRACTING COMPANY (4.20)
MORRIS COUNTY CONTRACTORS, L.L.C. (7.27)
PANOLA SIGN & BARRICADE, INC. (0.77)
STRIPING TECHNOLOGY, L.P. (0.13)
Contract #04203010
Totals3889930.5064085.002979193.4976.5

CountyHENDERSON
HighwayFM 59
FromBS19J, IN ATHENS, SW
ToSL 7
CSJ0458-01-025
Proj IDSTP 2020(960)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
2.1171730130.351611866.8593.1
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-14-20
Work Began10-19-20
Work Completed
Time Computed00-00-00
Contract Working Days165
Addl Days Granted0
Working Days Charged153
Percent Time Used92
Contractor(s)
BIG CREEK CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0458-01-025
ODUM SERVICES, LLC (1.22)
SOUTHWEST ENVIRONMENT SERIVES, LLC (1.72)
TEXAS ALTERNATIVE GRASSER INCORPORATED (1.55)
STRIPING TECHNOLOGY, L.P. (2.49)
TOTAL HIGHWAY MAINTENANCE, LLC (1.02)
FREDONIA CONSTRUCTION SERVICES (0.00)
Contract #07203230
Totals1730130.357093.001611866.8593.1

CountyWOOD
HighwayFM 14
FromFM 1795 IN HAWKINS, S & W
ToSMITH C/L AT SABINE RIVER
CSJ0492-03-036
Proj IDSTP 2020(615)
Work TypeOVERLAY
 
0.4004511805.594633519.0899.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-09-20
Work Began07-20-20
Work Completed
Time Computed00-00-00
Contract Working Days95
Addl Days Granted3
Working Days Charged87
Percent Time Used88
Contractor(s)
EAST TEXAS BRIDGE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0492-03-036
PANOLA SIGN & BARRICADE, INC. (0.23)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.88)
SOUTHWEST ENVIRONMENT SERIVES, LLC (0.13)
ISAACS CONSTRUCTION SERVICES LLC (0.18)
STRIPE-A-ZONE, INC. (1.52)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.40)
TEX OP CONSTRUCTION, LP (1.91)
Contract #03203212
Totals4511805.590.004633519.0899.9

CountyVAN ZANDT
HighwayIH 20
FromSH 19 OVERPASS IN CANTON, E
ToCR 4517, 1.4 MI E OF FM 16
CSJ0495-03-065
Proj IDSTP 2021(170)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
11.3421075129.10937931.0787.2
CountySMITH
HighwayIH 20
FromCR431/JIM HOGG, 1 MI E OF US69, E
ToFM 3311
CSJ0495-05-055
Proj IDSTP 2021(170)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
11.0721012359.07520450.0951.4
CountyGREGG
HighwayIH 20
FromSMITH C/L, E
ToMLK DR IN LONGVIEW
CSJ0495-07-079
Proj IDSTP 2021(170)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
1402764.600.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-08-21
Work Began04-12-21
Work Completed
Time Computed00-00-00
Contract Working Days190
Addl Days Granted7
Working Days Charged96
Percent Time Used48
Contractor(s)
SEFBO PIPELINE BRIDGE, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0495-03-065
EAGLE BARRICADE, LLC (1.71)
USA SWPPP INSPECTIONS, INC.DBA USA EROSION (0.86)
TJT CONSTRUCTION, INC. (1.71)
JE CASEY, LLC (33.15)
ODUM SERVICES, LLC (2.14)
FLEX SUPPLY, LLC (0.42)
Contract #02213016
Totals3490252.77571485.651458381.1641.7

CountySMITH
HighwayIH 20
FromUS 69 IN LINDALE, E
To0.8 MI E OF US 69 (END C-S)
CSJ0495-04-065
Proj IDNH 2018(425)
Work TypeGR, STRS, BS & SURF, PVT MRKG
 
1.09314842182.9715210364.0999.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-09-18
Work Began07-16-18
Work Completed
Time Computed00-00-00
Contract Working Days319
Addl Days Granted2
Working Days Charged337
Percent Time Used104
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0495-04-065
PANOLA SIGN & BARRICADE, INC. (0.35)
ISAACS CONSTRUCTION SERVICES, LLC. (0.58)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (0.54)
MICA CORPORATION (7.73)
SOUTHWEST ENVIRONMENT SERIVES, LLC (1.15)
S & S BRIDGE PAINTING, INC. (4.51)
STRIPING TECHNOLOGY, L.P. (0.32)
KENSAR LLC DBA S & S TRUCKING (1.69)
MORRIS COUNTY CONTRACTORS, LLC (1.38)
FARR FOUNDATION, INC. (3.18)
BOWMAN ENGINEERING & CONSULTING, INC. (0.01)
BREDA COMPANY, INC. (0.06)
COLLIER-MANPOWER, INC. (0.00)
TEX OP CONSTRUCTION, LP (0.22)
WEBBER BARRIER SERVICES, LLC. (0.82)
DURABLE SPECIALTIES, INC. (0.02)
PINNACLE GRINDING AND GROOVING LLC (0.02)
Contract #06183011
Totals14842182.970.0015210364.0999.9

CountySMITH
HighwayIH 20
From3.814 MI E OF FM 757
To.
CSJ0495-06-034
Proj IDC 495-6-34
Work TypeOVERLAY
 
1495511.901015188.7767.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order04-16-21
Work Began06-07-21
Work Completed
Time Computed00-00-00
Contract Working Days54
Addl Days Granted0
Working Days Charged37
Percent Time Used68
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0495-06-034
ISAACS CONSTRUCTION SERVICES LLC (1.39)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.08)
FORTSON CONTRACTING, INC. (1.57)
STATEWIDE SAFETY SYSTEMS (0.45)
STRIPING TECHNOLOGY, L.P. (1.47)
Contract #03213024
Totals1495511.90701644.711015188.7767.8

CountySMITH
HighwaySH 155
FromSL 323 IN TYLER, SW
To.5 MI N OF TOLL49/ENDC&G IN NOONDAY
CSJ0520-06-043
Proj IDC 520-6-43
Work TypeRESTORATION
 
7.86516954295.26533060.673.1
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order04-16-21
Work Began05-25-21
Work Completed
Time Computed00-00-00
Contract Working Days264
Addl Days Granted0
Working Days Charged59
Percent Time Used22
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 0520-06-043
ASE CONTRACTORS LLC (0.63)
CHEROKEE SERVICES (0.41)
J. H. ODEN CONTRACTING COMPANY (0.50)
PANOLA SIGN & BARRICADE, INC. (0.17)
R & G CONSTRUCTION, LLC (4.06)
STRIPE-A-ZONE, INC. (2.95)
REYNOLDS & KAY, LTD. (19.47)
Contract #03213202
Totals16954295.2661082.90533060.673.1

CountySMITH
HighwayPR 16
FromPARK MAINT RD IN TYLER ST PARK, SW
ToCEDAR POINT CAMPING AREA EXIT
CSJ0606-01-007
Proj IDC 606-1-7
Work TypeTEXAS PARK AND WILDLIFE
 
0.2192399846.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days77
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0606-01-007
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #08213257
Totals2399846.000.000.000.0

CountyCHEROKEE
HighwayFM 22
FromCR 1512 (OLD FREIGHT), GALLATIN C/L, E
ToSH110 NEAR ELM GROVE
CSJ0634-01-014
Proj IDSTP 2021(318)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
4.8313505113.38161092.134.9
CountyCHEROKEE
HighwayFM 22
FromAT SANDY CREEK, 0.9 MI W OF SH 110
ToSTR #003, NEAR ELM GROVE
CSJ0634-01-015
Proj IDBR 2021(319)
Work TypeBRIDGE REPLACEMENT
 
712211.32636386.4189.3
CountyCHEROKEE
HighwayFM 22
FromAT TURNPIKE CREEK
ToSTR #004, IN GALATIN
CSJ0634-01-016
Proj IDBR 2021(320)
Work TypeBRIDGE REPLACEMENT
 
717940.4242750.005.9
CountyCHEROKEE
HighwayFM 22
FromAT LITTLE TURNPIKE CREEK
ToSTR #005, IN GALATIN
CSJ0634-01-017
Proj IDBR 2021(321)
Work TypeBRIDGE REPLACEMENT
 
598440.7271250.0011.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-12-21
Work Began05-21-21
Work Completed
Time Computed00-00-00
Contract Working Days249
Addl Days Granted0
Working Days Charged80
Percent Time Used32
Contractor(s)
STATELINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0634-01-014
FOUTSCO PAVING COMPANY, LLC (13.31)
HODGES AND SON CONSTRUCTION COMPANY, INC. (4.14)
PANOLA SIGN & BARRICADE, INC. (0.49)
R & G CONSTRUCTION, LLC (8.78)
STRIPING TECHNOLOGY, L.P. (1.22)
WEST TEXAS ROCK RESOURCES, LLC (0.15)
ISAACS CONSTRUCTION SERVICES LLC (1.51)
MORRIS COUNTY CONTRACTORS, L.L.C. (1.07)
TORO BRAVO CONSTRUCTION, LLC (0.92)
Contract #02213206
Totals5533705.8459212.52911478.5416.7

CountyVAN ZANDT ETC
HighwayFM 47 ETC
FromUS80 IN WILLS POINT, S
ToSH 243
CSJ0646-02-029
Proj IDSTP 2020(329)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
35.6664537223.822518056.8655.4
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-24-20
Work Began04-13-20
Work Completed
Time Computed00-00-00
Contract Working Days338
Addl Days Granted0
Working Days Charged222
Percent Time Used65
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0646-02-029
TOTAL HIGHWAY MAINTENANCE, LLC (1.26)
A. E. MOORE CONSTRUCTION, INC. (7.51)
DUSTIN ALLEN, INC. (6.69)
Contract #12193018
Totals4537223.82140413.282518056.8655.4

CountyHENDERSON
HighwaySH 198
FromAT CLEAR CRK BR, 1 MI N OF RM 3054
ToSTR #026, NEAR LOG CABIN
CSJ0646-05-027
Proj IDBR 2021(213)
Work TypeBRIDGE REPLACEMENT
 
1.19530355868.316311214.3420.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-05-21
Work Began05-26-21
Work Completed
Time Computed00-00-00
Contract Working Days738
Addl Days Granted0
Working Days Charged80
Percent Time Used10
Contractor(s)
COPASA INC
SUBCONTRACTOR(S) FOR CCSJ: 0646-05-027
AREA WIDE PROTECTIVE, INC. (0.15)
ATS DRILLING, INC. (23.49)
JE CASEY, LLC (4.30)
J & M CONTRACTING, COMPANY (0.79)
ROYAL REBAR (0.09)
SIOUX EROSION CONTROL, INC. (0.32)
TOTAL HIGHWAY MAINTENANCE, LLC (0.17)
TEXAS MATERIALS GROUP, INC. (3.99)
BROCK CONSTRUCTION, LLC (0.03)
PEACHTREE CONSTRUCTION, LTD. (0.09)
ASE CONTRACTORS LLC (0.44)
ANCORTEX, INC. (0.87)
ADVANCED EXCAVATION SOLUTIONS LLC (3.08)
Contract #01213002
Totals30355868.312821929.886311214.3420.7

CountyHENDERSON
HighwaySH 334
FromKNOB HILL IN 7 PT,1 MI E OF SH274,E
ToSOUTHLAND IN GBC(2.5 MI W OF SH198)
CSJ0697-02-039
Proj IDSTP 2019(242)
Work TypeRECONST BRGS, GR, BS, SURF, PVT MRK
 
2.93641269729.2243794596.2299.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order12-20-18
Work Began03-15-19
Work Completed
Time Computed00-00-00
Contract Working Days450
Addl Days Granted26
Working Days Charged550
Percent Time Used115
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0697-02-039
AREA WIDE PROTECTIVE, INC. (0.03)
MASSEY CONTRACTORS, LLC (0.06)
WOLFE CONSTRUCTION GROUP, INC. (0.03)
COMEN ENTERPRISE LLC (0.05)
BOWMAN ENGINEERING & CONSULTING, INC. (0.64)
JB PINNACLE GROUP, LLC (1.14)
JE CASEY, LLC (2.98)
LAYFIELD CONSTRUCTION, INC (0.35)
GRL ENGINEERS, INC. (0.13)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.09)
PEACHTREE CONSTRUCTION, LTD. (0.47)
TEXOP CONSTRUCTION (0.04)
TEXAS SHAFTS, INC. (6.86)
TOTAL HIGHWAY MAINTENANCE, LLC (0.31)
WEBBER, LLC (0.17)
STOIC CIVIL CONSTRUCTION, INC. (0.62)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.11)
VERNOR MATERIAL & EQUIPMENT CO., INC. (1.17)
W.O.E. CONSTRUCTION, INC. (0.02)
POTERE CONSTRUCTION LLC (0.00)
Contract #11183005
Totals41269729.22750.0043794596.2299.9

CountySMITH
HighwayFM 346
FromFM 2493
To.45 MI W OF US 69
CSJ0889-04-080
Proj IDSTP 2021(126)
Work TypeSAFETY IMPROVEMENT PROJECTS
 
57277.0056100.0097.9
CountySMITH
HighwayFM 346
From1.85 MI W OF FM 2868
ToFM 2493
CSJ1764-01-018
Proj IDSTP 2021(126)
Work TypeSAFETY IMPROVEMENT PROJECTS
 
45997.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order12-11-20
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days14
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
JASCO
SUBCONTRACTOR(S) FOR CCSJ: 0889-04-080
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #11203028
Totals103274.000.0056100.0054.3

CountySMITH
HighwayVA
FromVARIOUS LOCATIONS IN
ToTHE TYLER DISTRICT
CSJ0910-00-114
Proj IDSTP 2021(215)
Work TypeTRAFFIC CONTROL DEVICES
 
1.0002292952.431529020.0166.6
CountyCHEROKEE
HighwayFM 241
FromFM 752 S
ToUS 69
CSJ1124-03-014
Proj IDC 1124-3-14
Work TypeTRAFFIC CONTROL DEVICES
 
30008.3245795.8499.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-01-21
Work Began03-22-21
Work Completed
Time Computed00-00-00
Contract Working Days128
Addl Days Granted0
Working Days Charged92
Percent Time Used71
Contractor(s)
STRIPE-A-ZONE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-114
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #01213013
Totals2322960.75109073.581574815.8567.7

CountySMITH
HighwayVA
FromVARIOUS LOCATIONS IN
ToTHE TYLER DISTRICT
CSJ0910-00-120
Proj IDF 2021(600)
Work TypeTRAFFIC CONTROL DEVICES
 
1.000471301.780.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-18-21
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days91
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
PROFESSIONAL TRAFFIC CONTROL LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-120
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #06213230
Totals471301.780.000.000.0

CountySMITH
HighwayVA
FromVAR LOCS IN SMITH COUNTY
ToALONG, SH64, SH110, SH135
CSJ0910-00-127
Proj IDSTP 2B20(022)
Work TypePEDESTRIAN, SIDEWALKS & CURB RAMPS
 
3512938.502242997.6763.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-18-20
Work Began10-16-20
Work Completed
Time Computed00-00-00
Contract Working Days300
Addl Days Granted0
Working Days Charged160
Percent Time Used53
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-00-127
STRIPING TECHNOLOGY, L.P. (3.44)
FLEX SUPPLY, LLC (3.44)
Contract #07203028
Totals3512938.50123556.832242997.6763.8

page 1 | page 2 | page 3