Monthly State Let Construction Report For Tyler District As Of Sep 13, 2021 Page 3 Of 3

Last Update: Wednesday, September 15, 2021
FTP Icon
page 1 | page 2 | page 3

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyGREGG
HighwayVA
FromAT SE CORNER OF SL281 & SS502 AND
ToAT ISLAND AT SH149 & SH322 IN LONGVIEW
CSJ0910-07-079
Proj IDNH 2020(494)
Work TypeLANDSCAPE & SCENIC ENHANCEMENT
 
298628.50290222.5097.1
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-20-20
Work Began04-06-20
Work Completed
Time Computed00-00-00
Contract Working Days61
Addl Days Granted0
Working Days Charged61
Percent Time Used100
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0910-07-079
AREA WIDE PROTECTIVE, INC. (2.50)
Contract #01203221
Totals298628.500.00290222.5097.1

CountyANDERSON
HighwayCR
FromCR 370 AT WELLS CREEK
ToSTR#AA0370101 1.90 MI SE OF US 79
CSJ0910-08-076
Proj IDBR 2018(262)
Work TypeBRIDGE REPLACEMENT
 
383418.05389690.7999.9
CountyANDERSON
HighwayCR
FromCR 458 @ OTTER CREEK
ToSTR#AA0458101, 3.4 MI N OF FM 2330
CSJ0910-08-077
Proj IDBR 2018(263)
Work TypeBRIDGE REPLACEMENT
 
362579.64363675.2599.9
CountyANDERSON
HighwayCR
FromCR 468 AT BOX CREEK
ToSTR#AA0468101, .4 MI S OF FM 837
CSJ0910-08-078
Proj IDBR 2018(264)
Work TypeBRIDGE REPLACEMENT
 
307683.51302093.5998.1
CountyANDERSON
HighwayCS
FromSALT WORKS DR AT BASSETT CREEK
ToSTR#B01907001, 1.45 MI W OF US79
CSJ0910-08-079
Proj IDBR 2018(260)
Work TypeBRIDGE REPLACEMENT
 
399045.61382302.5395.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order04-23-20
Work Began05-29-20
Work Completed
Time Computed00-00-00
Contract Working Days207
Addl Days Granted3
Working Days Charged207
Percent Time Used98
Contractor(s)
STATELINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-08-076
A K CONTRACTING, LLC (0.18)
HODGES AND SON CONSTRUCTION COMPANY, INC. (16.48)
MORRIS COUNTY CONTRACTORS, L.L.C. (4.19)
PANOLA SIGN & BARRICADE, INC. (1.05)
SOUTHWEST ENVIRONMENT SERIVES, LLC (0.41)
Contract #03203008
Totals1452726.810.001437762.1698.9

CountyVAN ZANDT
HighwayCR
FromCR 2918 AT STEVE CREEK RELIEF
ToSTR#AA2918101, 1.25 MI S OF FM 1256
CSJ0910-12-134
Proj IDBR 2019(360)
Work TypeBRIDGE REPLACEMENT
 
277793.26223432.2780.4
CountyVAN ZANDT
HighwayCR
FromCR 2918 AT STEVE CREEK RELIEF
ToSTR#AA2918102 1.35 MI S OF FM 1256
CSJ0910-12-135
Proj IDBR 2019(361)
Work TypeBRIDGE REPLACEMENT
 
297509.25157183.2052.8
CountyVAN ZANDT
HighwayCR
FromCR 2319 AT ALLIGATOR CREEK
ToSTR#AA2708102,0.80 MI W OF SH 19
CSJ0910-12-136
Proj IDBR 2019(362)
Work TypeBRIDGE REPLACEMENT
 
402245.68247793.8061.6
CountyVAN ZANDT
HighwayCR
FromCR 2708 AT CANEY CREEK, AA2708101
To1.02 MI N OF SH 198
CSJ0910-12-137
Proj IDBR 2019(363)
Work TypeBRIDGE REPLACEMENT
 
269581.1915000.005.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order04-16-21
Work Began06-01-21
Work Completed
Time Computed00-00-00
Contract Working Days233
Addl Days Granted0
Working Days Charged61
Percent Time Used26
Contractor(s)
EAST TEXAS BRIDGE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0910-12-134
J. H. ODEN CONTRACTING COMPANY (0.53)
MORRIS COUNTY CONTRACTORS, L.L.C. (5.72)
ISAACS CONSTRUCTION SERVICES LLC (1.16)
HODGES AND SON CONSTRUCTION COMPANY, INC. (12.98)
TORO BRAVO CONSTRUCTION, LLC (0.66)
Contract #03213216
Totals1247129.38108624.68643409.2751.5

CountySMITH
HighwayVA
FromVARIOUS LOCATIONS IN
ToWHITEHOUSE
CSJ0910-16-169
Proj IDF 2022(028)
Work TypeLANDSCAPE & SCENIC ENHANCEMENT
 
157495.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days86
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TIGHT LINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-16-169
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #09213218
Totals157495.000.000.000.0

CountyHENDERSON
HighwayVA
FromVARIOUS LOCATIONS ON SL 7
ToIN ATHENS
CSJ0910-34-033
Proj IDF 2021(924)
Work TypeLANDSCAPE & SCENIC ENHANCEMENT
 
72072.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days25
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TIGHT LINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-34-033
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #08213268
Totals72072.000.000.000.0

CountyWOOD
HighwayCS
FromEDGEWOOD ADDITION
ToFM515/COKE RD
CSJ0910-35-036
Proj IDSTP 2019(291)TAPS
Work TypePEDESTRIAN, SIDEWALKS & CURB RAMPS
 
0.477339130.60282946.8683.4
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-18-20
Work Began06-03-21
Work Completed
Time Computed00-00-00
Contract Working Days180
Addl Days Granted0
Working Days Charged49
Percent Time Used27
Contractor(s)
PIERCE R & B LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-35-036
TEXAS ORGANIC ENTERPRISES, LTD (6.29)
FLEX SUPPLY, LLC (1.00)
HODGES AND SON CONSTRUCTION COMPANY, INC. (10.30)
TORO BRAVO CONSTRUCTION, LLC (0.51)
Contract #08203257
Totals339130.6059399.54282946.8683.4

CountyWOOD
HighwayVA
FromVARIOUS LOCATIONS IN WOOD
ToAND VAN ZANDT COUNTIES
CSJ0910-35-037
Proj IDC 910-35-37
Work TypeTRAFFIC CONTROL DEVICES
 
1.000303114.00301386.0099.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order11-19-20
Work Began02-03-21
Work Completed
Time Computed00-00-00
Contract Working Days38
Addl Days Granted0
Working Days Charged41
Percent Time Used107
Contractor(s)
CROSS PLUS CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-35-037
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #10203024
Totals303114.000.00301386.0099.9

CountyWOOD
HighwayVA
FromVARIOUS LOCATIONS IN WOOD
ToAND VAN ZANDT COUNTIES
CSJ0910-35-038
Proj IDSTP 2B20(193)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
777778.60640506.1982.3
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-18-20
Work Began11-16-20
Work Completed
Time Computed00-00-00
Contract Working Days54
Addl Days Granted20
Working Days Charged61
Percent Time Used82
Contractor(s)
CATOCON, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0910-35-038
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #08203262
Totals777778.602901.00640506.1982.3

CountyCHEROKEE
HighwayCR
FromCR 2905 AT BOWLES CR, W OF ALTO
ToSTR# AA2905101, BTWN SH 294 & SH 21
CSJ0910-36-129
Proj IDBR 2018(231)
Work TypeBRIDGE REPLACEMENT
 
788670.60743551.6894.9
CountyCHEROKEE
HighwayCR
FromCR 2614 AT BEANS CR
ToSTR#AA2614102 2.2 MI SE OF FM 2708
CSJ0910-36-130
Proj IDBR 2018(230)
Work TypeBRIDGE REPLACEMENT
 
395821.70391165.6098.8
CountyCHEROKEE
HighwayCR
FromCR 1504 AT TURNPIKE CREEK
ToSTR#AA1504101, .25 MI S OF FM22
CSJ0910-36-131
Proj IDBR 2018(229)
Work TypeBRIDGE REPLACEMENT
 
426127.60374372.1687.8
CountyCHEROKEE
HighwayCR
FromCR 3203 AT MILLS CREEK
ToSTR#AA3203101, .65 MI W OF FM747
CSJ0910-36-132
Proj IDBR 2018(228)
Work TypeBRIDGE REPLACEMENT
 
0.001332726.90332431.2999.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order04-23-20
Work Began05-21-20
Work Completed
Time Computed00-00-00
Contract Working Days171
Addl Days Granted0
Working Days Charged178
Percent Time Used104
Contractor(s)
STATELINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-36-129
A K CONTRACTING, LLC (0.14)
HEMPHILL WBE PILE DRIVING CO. (4.28)
HODGES AND SON CONSTRUCTION COMPANY, INC. (14.04)
PANOLA SIGN & BARRICADE, INC. (0.78)
TORO BRAVO CONSTRUCTION, LLC (0.64)
MORRIS COUNTY CONTRACTORS, L.L.C. (3.11)
SOUTHWEST ENVIRONMENT SERIVES, LLC (0.40)
R & G CONSTRUCTION, LLC (2.23)
TEXOP CONSTRUCTION (0.35)
Contract #03203013
Totals1943346.802128.001841520.7395.0

CountyRUSK
HighwayVA
FromVARIOUS LOCATIONS IN HENDERSON
To.
CSJ0910-42-042
Proj IDSTP 2021(171)
Work TypeLANDSCAPE & SCENIC ENHANCEMENT
 
172336.00225927.2499.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order01-08-21
Work Began02-22-21
Work Completed
Time Computed00-00-00
Contract Working Days60
Addl Days Granted7
Working Days Charged61
Percent Time Used91
Contractor(s)
TIGHT LINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0910-42-042
FLEX SUPPLY, LLC (3.07)
Contract #12203023
Totals172336.008335.80225927.2499.9

CountySMITH
HighwayFM 344
FromFM 756 AT WALNUT GROVE, E
ToSH 110, S OF WHITEHOUSE
CSJ0927-01-030
Proj IDSTP 2B20(056)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
3.622850562.00818176.5696.1
CountyCHEROKEE
HighwayFM 768
FromSL 456 IN JACKSONVILLE, SE
ToFM 22 IN GALLATIN
CSJ1124-01-010
Proj IDSTP 2B20(056)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
7.451982985.83334097.9033.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-18-20
Work Began11-16-20
Work Completed
Time Computed00-00-00
Contract Working Days195
Addl Days Granted0
Working Days Charged127
Percent Time Used65
Contractor(s)
A R BROTHERS CONSTRUCTION SERVICES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0927-01-030
DUSTIN ALLEN, INC. (5.98)
FLEX SUPPLY, LLC (0.88)
TEXAS ORGANIC ENTERPRISES, LTD (10.24)
COLD CREEK CONSTRUCTION, LTD (0.19)
FREDONIA CONSTRUCTION SERVICES (0.07)
Contract #08203239
Totals1833547.8351446.141152274.4662.8

CountySMITH
HighwayFM 344
From.1 MI N OF CR 1174, E
To.3 MI W OF FM 2493
CSJ0927-01-033
Proj IDF 2021(818)
Work TypeSAFETY IMPROVEMENT PROJECTS
 
148135.000.000.0
CountySMITH
HighwayFM 848
FromCR 287, S
ToGILLEY CREEK (CR 2127 MCELROY)
CSJ1151-01-015
Proj IDF 2021(818)
Work TypeSAFETY IMPROVEMENT PROJECTS
 
181387.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days21
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
SYNERGY SIGNS & SERVICES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0927-01-033
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #08213056
Totals329522.000.000.000.0

CountyCHEROKEE
HighwayFM 235
FromSH 110 IN NEW SUMMERFIELD, SE
ToFM 2274
CSJ1150-02-006
Proj IDSTP 2020(856)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
4.2363457804.752971833.6585.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-18-20
Work Began10-26-20
Work Completed
Time Computed00-00-00
Contract Working Days190
Addl Days Granted0
Working Days Charged180
Percent Time Used94
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 1150-02-006
DREWERY CONSTRUCTION COMPANY, INCORPORATED (3.58)
PANOLA SIGN & BARRICADE, INC. (0.61)
R & G CONSTRUCTION, LLC (17.75)
STRIPE-A-ZONE, INC. (0.40)
J. H. ODEN CONTRACTING COMPANY (6.68)
SOUTHWEST ENVIRONMENT SERIVES, LLC (0.97)
STRIPING TECHNOLOGY, L.P. (1.43)
FREDONIA CONSTRUCTION SERVICES (1.30)
REYNOLDS & KAY, LTD. (5.17)
Contract #04203220
Totals3457804.75108399.012971833.6585.9

CountyGREGG
HighwaySH 300
FromFM 2275 (GEO RICHEY RD), S
ToUS 80 IN LONGVIEW
CSJ1385-02-024
Proj IDNH 2018(517)
Work TypeBS RPR, OCST, PFC, HMAC, PVT MRKG
 
8.9496613692.246452161.9697.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-14-18
Work Began06-14-18
Work Completed
Time Computed00-00-00
Contract Working Days285
Addl Days Granted9
Working Days Charged310
Percent Time Used105
Contractor(s)
MADDEN CONTRACTING COMPANY, LLC.
SUBCONTRACTOR(S) FOR CCSJ: 1385-02-024
BAHENA CONSTRUCTION CO.,INC. (4.54)
PANOLA SIGN & BARRICADE, INC. (0.63)
R & G CONSTRUCTION, LLC (18.42)
SOUTHWEST ENVIRONMENT SERIVES, LLC (1.26)
STRIPING TECHNOLOGY, L.P. (2.72)
REYNOLDS & KAY, LTD. (3.01)
Contract #02183010
Totals6613692.241200.006452161.9697.8

CountyGREGG
HighwayFM 2206
From2.05 MI E OF SH 42 (FISHER RD), E
ToSL 281 IN LONGVIEW
CSJ2073-01-009
Proj IDSTP 2013(212)
Work TypeWIDEN NON-FREEWAY
 
15164540.894311096.0128.4
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-09-20
Work Began07-06-20
Work Completed
Time Computed00-00-00
Contract Working Days302
Addl Days Granted27
Working Days Charged145
Percent Time Used44
Contractor(s)
EAST TEXAS BRIDGE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 2073-01-009
ISAACS CONSTRUCTION SERVICES LLC (0.73)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.25)
PANOLA SIGN & BARRICADE, INC. (0.34)
SOUTHWEST ENVIRONMENT SERIVES, LLC (1.43)
STRIPING TECHNOLOGY, L.P. (2.10)
WITHERS CONSTRUCTION, LLC (0.74)
CARTHAGE DRILLING, INC. (0.08)
Contract #04203004
Totals15164540.89305934.874311096.0128.4

CountyGREGG
HighwayFM 2206
FromSH 42, E
To1.6 MI W OF SL281(FISHER RD)IN LGVW
CSJ2073-01-010
Proj IDSTP 2020(788)
Work TypeWIDEN NON-FREEWAY
 
13220500.134707976.4035.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-15-20
Work Began11-09-20
Work Completed
Time Computed00-00-00
Contract Working Days396
Addl Days Granted0
Working Days Charged130
Percent Time Used32
Contractor(s)
EAST TEXAS BRIDGE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 2073-01-010
M & D FOUNDATION DRILLING INDUSTRIES, INC. (2.58)
STRIPING TECHNOLOGY, L.P. (2.11)
MORRIS COUNTY CONTRACTORS, L.L.C. (0.23)
SOUTHWEST ENVIRONMENT SERIVES, LLC (1.05)
PANOLA SIGN & BARRICADE, INC. (0.28)
ISAACS CONSTRUCTION SERVICES LLC (0.81)
TORO BRAVO CONSTRUCTION, LLC (0.00)
Contract #08203005
Totals13220500.13281961.264707976.4035.6

CountySMITH
HighwaySL 323
From0.135 MI. W OF SH 155, E
To0.777 MI. E OF US 69 IN TYLER
CSJ2075-02-065
Proj IDNH 1902(022)
Work TypeOVERLAY
 
3.0304993647.024528497.4290.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-17-19
Work Began06-28-20
Work Completed
Time Computed00-00-00
Contract Working Days75
Addl Days Granted0
Working Days Charged75
Percent Time Used100
Contractor(s)
DREWERY CONSTRUCTION COMPANY, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 2075-02-065
FREDONIA CONSTRUCTION SERVICES (0.20)
STRIPING TECHNOLOGY, L.P. (3.99)
TEXOP CONSTRUCTION (5.01)
PANOLA SIGN & BARRICADE, INC. (0.20)
Contract #05193257
Totals4993647.0236211.664528497.4290.6